Home / Public works bids / 1240BH27Q0002
GAOA Tony Grove Dam Spillway Capacity & Seismic Mitigation, Uinta/Wasatch/Cache National Forest
AGRICULTURE, DEPARTMENT OF
Garden City, UT
Source notice
This is a combined synopsis/solicitation for commercial construction prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation; quotes are being requested, and a separate written solicitation will not be issued. Solicitation number 1240BH27Q0002 is issued as a Request for Quotation (RFQ) for the Tony Grove Dam Spillway Capacity & Seismic Mitigation on the Uinta/Wasatch/Cache National Forest. This project consists of reconstructing portions of the Tony Grove Dam as shown in the drawings and described in the specifications.
This also includes replacing outlet works and raising the dam crest along with the addition of embankment material. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification System Code is 237990. The small business size standard is $45 Million.
This acquisition is a total Small Business set-aside. All responsible sources may submit a quotation which will be considered by the agency. Amendment 01 - Summary: Extend quote due date to November 20, 2026. Amendment 02 - Summary: Extend quote due date to December 14, 2026.
Trades mentioned
These matches come from the notice title or scope. They do not establish separate subcontract packages or an invitation to bid.
Why these trades matched
- General construction — notice scope: “ombined synopsis/solicitation for commercial construction prepared in accordance with the format in FAR Part 12. This announcement c”
Requirements and eligibility
- Set-aside
- Small Business Set Aside - TotalSource listing
- NAICS
- 237990Source listing
- PSC
- Y1KASource listing
Review the complete solicitation for bonding, insurance, experience, licensing, registration and mandatory meetings. An item missing from this listing is not confirmation that the agency has no requirement.
Wages and labor
Check the solicitation for the applicable wage determination. A construction notice alone does not establish which federal or state wage requirements apply.
Documents and submission
Submit through the method specified by the agency. PWH does not accept bids. Check the official notice for the complete package and the latest addenda.
Open official noticeSource and dates
SAM.gov · Reference 1240BH27Q0002
Last collected Nov 18, 2026. Dates and requirements can change; verify the agency’s current notice before responding.