Skip to content

Home / Download data

Prevailing wage data for all 50 states (CSV and JSON)

Download prevailing wage rates as CSV or JSON: 219,224 rates for every county (and Connecticut town) in all 50 states, DC and four territories, each with its source URL.

Free to use. The agencies' material is public; if you republish, please link to the agency's source and to this page. Checked October 25, 2026.

Alabama: 3,762 rates, Davis-Bacon wage determinations on SAM.gov, as of October 25, 2026

Columns: Every row of the Alabama WDs: WD number, modification number and date, construction types, scope, rate identifier and its date, classification, base, fringe as printed, fringe kind, our total, review flags and the source URL and line. Each file has every field the pipeline records; lists are JSON in their cell.

67 locality files

Alaska: 482 rates, Pamphlet 600 Issue 53 (Sep 1, 2026)

Columns: Every Pamphlet 600 record for Issues 50–53: class code, title, region, basic hourly rate, each benefit, total, bid-date window, issue and source page. Each file has every field the pipeline records; lists are JSON in their cell.

30 locality files

American Samoa: 12 rates, Davis-Bacon wage determinations on SAM.gov, as of October 25, 2026

Columns: Every row of the American Samoa WDs: WD number, modification number and date, construction types, scope, rate identifier and its date, classification, base, fringe as printed, fringe kind, our total, review flags and the source URL and line. Each file has every field the pipeline records; lists are JSON in their cell.

5 locality files

Arizona: 1,324 rates, Davis-Bacon wage determinations on SAM.gov, as of October 25, 2026

Columns: Every row of the Arizona WDs: WD number, modification number and date, construction types, scope, rate identifier and its date, classification, base, fringe as printed, fringe kind, our total, review flags and the source URL and line. Each file has every field the pipeline records; lists are JSON in their cell.

15 locality files

Arkansas: 3,731 rates, Davis-Bacon wage determinations on SAM.gov, as of October 25, 2026

Columns: Every row of the Arkansas WDs: WD number, modification number and date, construction types, scope, rate identifier and its date, classification, base, fringe as printed, fringe kind, our total, review flags and the source URL and line. Each file has every field the pipeline records; lists are JSON in their cell.

75 locality files

California: 16,854 rates, DIR period 2026-2

Columns: county, craft, classification, area, determination_id, issue_date, expiration_date, base, health_welfare, pension, vacation_holiday, training, other, hours, total_straight_time, daily_ot, sat_ot, sun_hol_ot, holiday_ot, county_split_note, source_url. Money is dollars per hour as DIR prints it. Footnotes that add to the total are already in total_straight_time, so the fringe columns may not add up to it.

58 county files

Colorado: 1,716 rates, Davis-Bacon wage determinations on SAM.gov, as of October 25, 2026

Columns: Every row of the Colorado WDs: WD number, modification number and date, construction types, scope, rate identifier and its date, classification, base, fringe as printed, fringe kind, our total, review flags and the source URL and line. Each file has every field the pipeline records; lists are JSON in their cell.

65 locality files

Connecticut: 38,854 rates, CTDOL schedules as of July 1, 2026

Columns: Every CTDOL row for every town and schedule: town, county, schedule, classification, hourly rate, hourly benefit (with letters and percentages as printed), our total and source page. Each file has every field the pipeline records; lists are JSON in their cell.

171 town files

Delaware: 183 rates, Delaware DOL determinations effective March 13, 2026

Columns: Every rate cell on Delaware's Building, Heavy and Highway determinations: county, classification, construction type, rate (fringes included) or DOL's note, and source. Each file has every field the pipeline records; lists are JSON in their cell.

3 locality files

District of Columbia: 125 rates, Davis-Bacon wage determinations on SAM.gov, as of October 25, 2026

Columns: Every row of the District of Columbia WDs: WD number, modification number and date, construction types, scope, rate identifier and its date, classification, base, fringe as printed, fringe kind, our total, review flags and the source URL and line. Each file has every field the pipeline records; lists are JSON in their cell.

1 locality files

Florida: 6,184 rates, Davis-Bacon wage determinations on SAM.gov, as of October 25, 2026

Columns: Every row of the Florida WDs: WD number, modification number and date, construction types, scope, rate identifier and its date, classification, base, fringe as printed, fringe kind, our total, review flags and the source URL and line. Each file has every field the pipeline records; lists are JSON in their cell.

67 locality files

Georgia: 4,360 rates, Davis-Bacon wage determinations on SAM.gov, as of October 25, 2026

Columns: Every row of the Georgia WDs: WD number, modification number and date, construction types, scope, rate identifier and its date, classification, base, fringe as printed, fringe kind, our total, review flags and the source URL and line. Each file has every field the pipeline records; lists are JSON in their cell.

159 locality files

Guam: 46 rates, Davis-Bacon wage determinations on SAM.gov, as of October 25, 2026

Columns: Every row of the Guam WDs: WD number, modification number and date, construction types, scope, rate identifier and its date, classification, base, fringe as printed, fringe kind, our total, review flags and the source URL and line. Each file has every field the pipeline records; lists are JSON in their cell.

1 locality files

Hawaii: 233 rates, Wage Rate Schedule WRS 511 with addenda 512 and 513 (Oct 2, 2026)

Columns: Every row of DLIR's Wage Rate Schedule in force (WRS 511 + 512 + 513), with each dated step: group, classification, basic rate, fringe, total, effective date, status, overtime figures and remarks. Each file has every field the pipeline records; lists are JSON in their cell.

5 locality files

Idaho: 2,209 rates, Davis-Bacon wage determinations on SAM.gov, as of October 25, 2026

Columns: Every row of the Idaho WDs: WD number, modification number and date, construction types, scope, rate identifier and its date, classification, base, fringe as printed, fringe kind, our total, review flags and the source URL and line. Each file has every field the pipeline records; lists are JSON in their cell.

44 locality files

Illinois: 6,816 rates, IDOL posting of October 19, 2026

Columns: county, craft, trade_title, classification, work_type, region, class, base, foreman, health_welfare, pension, vacation_holiday, training, other, total_straight_time, total_is_computed, ot_mf_multiplier, ot_sat_multiplier, ot_sun_multiplier, ot_hol_multiplier, add_ot_1_5x_owed, add_ot_2_0x_owed, issue_date, effective_date, region_note, source_url, source_page. IDOL prints no total: total_straight_time is base plus the five fringe columns, with blank cells counted as zero, and total_is_computed is true on every row. Overtime columns are multiples of the base wage. IDOL's legend doesn't define the two Add OT columns; they are copied as printed.

102 county files

Indiana: 1,408 rates, Davis-Bacon wage determinations on SAM.gov, as of October 25, 2026

Columns: Every row of the Indiana WDs: WD number, modification number and date, construction types, scope, rate identifier and its date, classification, base, fringe as printed, fringe kind, our total, review flags and the source URL and line. Each file has every field the pipeline records; lists are JSON in their cell.

92 locality files

Iowa: 1,851 rates, Davis-Bacon wage determinations on SAM.gov, as of October 25, 2026

Columns: Every row of the Iowa WDs: WD number, modification number and date, construction types, scope, rate identifier and its date, classification, base, fringe as printed, fringe kind, our total, review flags and the source URL and line. Each file has every field the pipeline records; lists are JSON in their cell.

99 locality files

Kansas: 4,713 rates, Davis-Bacon wage determinations on SAM.gov, as of October 25, 2026

Columns: Every row of the Kansas WDs: WD number, modification number and date, construction types, scope, rate identifier and its date, classification, base, fringe as printed, fringe kind, our total, review flags and the source URL and line. Each file has every field the pipeline records; lists are JSON in their cell.

105 locality files

Kentucky: 2,857 rates, Davis-Bacon wage determinations on SAM.gov, as of October 25, 2026

Columns: Every row of the Kentucky WDs: WD number, modification number and date, construction types, scope, rate identifier and its date, classification, base, fringe as printed, fringe kind, our total, review flags and the source URL and line. Each file has every field the pipeline records; lists are JSON in their cell.

120 locality files

Louisiana: 1,011 rates, Davis-Bacon wage determinations on SAM.gov, as of October 25, 2026

Columns: Every row of the Louisiana WDs: WD number, modification number and date, construction types, scope, rate identifier and its date, classification, base, fringe as printed, fringe kind, our total, review flags and the source URL and line. Each file has every field the pipeline records; lists are JSON in their cell.

64 locality files

Maine: 2,295 rates, MDOL 2026 rates, effective January 10, 2026

Columns: Every MDOL 2026 row: county (or Statewide), construction type, occupation, minimum wage, minimum benefit, printed total, decrease-cap flag and source PDF. Each file has every field the pipeline records; lists are JSON in their cell.

17 locality files

Maryland: 3,465 rates, Maryland informational rates as printed October 25, 2026

Columns: Every row of DOL's informational reports: locality, Building or Highway, title, modification code, base, fringe, our total, borrowed-from county, adjustment and pause flags. Each file has every field the pipeline records; lists are JSON in their cell.

24 locality files

Massachusetts: 986 rates, Davis-Bacon wage determinations on SAM.gov, as of October 25, 2026

Columns: Every row of the Massachusetts WDs: WD number, modification number and date, construction types, scope, rate identifier and its date, classification, base, fringe as printed, fringe kind, our total, review flags and the source URL and line. Each file has every field the pipeline records; lists are JSON in their cell.

14 locality files

Michigan: 4,259 rates, LEO county rates, November 2025 edition

Columns: Every journeyman row of LEO's county PDFs: county, craft, classification, straight-time, time-and-a-half and double-time rates, the derived wage and fringe estimate (labelled), jurisdiction text, duplicate flag, edition and source page. Each file has every field the pipeline records; lists are JSON in their cell.

83 locality files

Minnesota: 8,002 rates, DLI certifications of Nov 3 and Dec 22, 2025 (revised to Feb 9, 2026)

Columns: Every DLI line, commercial and highway/heavy, with each dated step: county or region, labor code, class, project-size tier, basic, fringe, total, status, adjacent-county flag and source page. Each file has every field the pipeline records; lists are JSON in their cell.

87 locality files

Mississippi: 3,681 rates, Davis-Bacon wage determinations on SAM.gov, as of October 25, 2026

Columns: Every row of the Mississippi WDs: WD number, modification number and date, construction types, scope, rate identifier and its date, classification, base, fringe as printed, fringe kind, our total, review flags and the source URL and line. Each file has every field the pipeline records; lists are JSON in their cell.

82 locality files

Missouri: 8,406 rates, Annual Wage Order 33 (final May 29, 2026)

Columns: Every AWO 33 line: county, building or heavy, occupational title or sub-title, rate (fringes included), contracting-minimum flag and source page. Each file has every field the pipeline records; lists are JSON in their cell.

115 locality files

Montana: 179 rates, DLI 2026 rates, revised April 25, 2026

Columns: Every row of DLI's 2026 schedules: schedule, district or statewide, occupation, base, benefit, our total, allowances text and source page. Each file has every field the pipeline records; lists are JSON in their cell.

56 locality files

Nebraska: 1,680 rates, Davis-Bacon wage determinations on SAM.gov, as of October 25, 2026

Columns: Every row of the Nebraska WDs: WD number, modification number and date, construction types, scope, rate identifier and its date, classification, base, fringe as printed, fringe kind, our total, review flags and the source URL and line. Each file has every field the pipeline records; lists are JSON in their cell.

93 locality files

Nevada: 2,807 rates, Labor Commissioner 2026-2027 rates (Oct 1, 2026)

Columns: Every row of the four 2026-2027 region schedules: region, county, craft, classification, rate (fringes included), union or survey basis, zone pay and source page. Each file has every field the pipeline records; lists are JSON in their cell.

17 locality files

New Hampshire: 552 rates, Davis-Bacon wage determinations on SAM.gov, as of October 25, 2026

Columns: Every row of the New Hampshire WDs: WD number, modification number and date, construction types, scope, rate identifier and its date, classification, base, fringe as printed, fringe kind, our total, review flags and the source URL and line. Each file has every field the pipeline records; lists are JSON in their cell.

10 locality files

New Jersey: 3,084 rates, NJDOL county packages of October 19, 2026

Columns: Every NJDOL row in the October 19, 2026 county packages, county and statewide: craft, classification, wage, fringe, total, every dated step, region note and source page. Each file has every field the pipeline records; lists are JSON in their cell.

21 locality files

New Mexico: 843 rates, 11.1.2.20 NMAC rates for decisions issued from July 1, 2026

Columns: Every row of 11.1.2.20 NMAC for 2026 (both sets) and 2027: construction type, trade, county or zone, base, fringe, apprenticeship contribution, our total and Register page. Each file has every field the pipeline records; lists are JSON in their cell.

33 locality files

New York: 11,229 rates, 2026-27 schedules, with the October 1, 2026 updates

Columns: Every NYSDOL and NYC Comptroller row for 2026-27: county or NYC, schedule, job description, classification, wage, supplements (flat or %), our total, steps, overtime codes and source. Each file has every field the pipeline records; lists are JSON in their cell.

63 locality files

North Carolina: 2,013 rates, Davis-Bacon wage determinations on SAM.gov, as of October 25, 2026

Columns: Every row of the North Carolina WDs: WD number, modification number and date, construction types, scope, rate identifier and its date, classification, base, fringe as printed, fringe kind, our total, review flags and the source URL and line. Each file has every field the pipeline records; lists are JSON in their cell.

100 locality files

North Dakota: 889 rates, Davis-Bacon wage determinations on SAM.gov, as of October 25, 2026

Columns: Every row of the North Dakota WDs: WD number, modification number and date, construction types, scope, rate identifier and its date, classification, base, fringe as printed, fringe kind, our total, review flags and the source URL and line. Each file has every field the pipeline records; lists are JSON in their cell.

53 locality files

Ohio: 3,550 rates, Davis-Bacon wage determinations on SAM.gov, as of October 25, 2026

Columns: Every row of the Ohio WDs: WD number, modification number and date, construction types, scope, rate identifier and its date, classification, base, fringe as printed, fringe kind, our total, review flags and the source URL and line. Each file has every field the pipeline records; lists are JSON in their cell.

88 locality files

Oklahoma: 2,210 rates, Davis-Bacon wage determinations on SAM.gov, as of October 25, 2026

Columns: Every row of the Oklahoma WDs: WD number, modification number and date, construction types, scope, rate identifier and its date, classification, base, fringe as printed, fringe kind, our total, review flags and the source URL and line. Each file has every field the pipeline records; lists are JSON in their cell.

77 locality files

Oregon: 2,775 rates, BOLI book of September 3, 2026 with the October 5, 2026 amendment

Columns: Every row of BOLI's September 3, 2026 book and October 5, 2026 amendment: county, trade, Area, zone, base, fringe, our total, overtime and source page. Each file has every field the pipeline records; lists are JSON in their cell.

36 locality files

Pennsylvania: 10,480 rates, PPWS county schedules from each county's newest determination (Oct 25, 2026)

Columns: Every row of each county's newest PPWS determination: county, determination number and date, project, Building or Heavy/Highway, classification, base, fringe, total, effective date and step status. Each file has every field the pipeline records; lists are JSON in their cell.

67 locality files

Puerto Rico: 626 rates, Davis-Bacon wage determinations on SAM.gov, as of October 25, 2026

Columns: Every row of the Puerto Rico WDs: WD number, modification number and date, construction types, scope, rate identifier and its date, classification, base, fringe as printed, fringe kind, our total, review flags and the source URL and line. Each file has every field the pipeline records; lists are JSON in their cell.

78 locality files

Rhode Island: 547 rates, Davis-Bacon RI20260001 Mod 5 (Oct 1, 2026) and related decisions

Columns: Every row of Rhode Island's active Davis-Bacon decisions: county, decision and modification, rate identifier, classification, base, fringe, our total and DLT's retirement minimum. Each file has every field the pipeline records; lists are JSON in their cell.

5 locality files

South Carolina: 1,091 rates, Davis-Bacon wage determinations on SAM.gov, as of October 25, 2026

Columns: Every row of the South Carolina WDs: WD number, modification number and date, construction types, scope, rate identifier and its date, classification, base, fringe as printed, fringe kind, our total, review flags and the source URL and line. Each file has every field the pipeline records; lists are JSON in their cell.

46 locality files

South Dakota: 551 rates, Davis-Bacon wage determinations on SAM.gov, as of October 25, 2026

Columns: Every row of the South Dakota WDs: WD number, modification number and date, construction types, scope, rate identifier and its date, classification, base, fringe as printed, fringe kind, our total, review flags and the source URL and line. Each file has every field the pipeline records; lists are JSON in their cell.

66 locality files

Tennessee: 1,917 rates, Davis-Bacon wage determinations on SAM.gov, as of October 25, 2026

Columns: Every row of the Tennessee WDs: WD number, modification number and date, construction types, scope, rate identifier and its date, classification, base, fringe as printed, fringe kind, our total, review flags and the source URL and line. Each file has every field the pipeline records; lists are JSON in their cell.

96 locality files

Texas: 8,578 rates, Davis-Bacon wage determinations on SAM.gov, as of October 25, 2026

Columns: Every row of the Texas WDs: WD number, modification number and date, construction types, scope, rate identifier and its date, classification, base, fringe as printed, fringe kind, our total, review flags and the source URL and line. Each file has every field the pipeline records; lists are JSON in their cell.

254 locality files

U.S. Virgin Islands: 96 rates, Davis-Bacon wage determinations on SAM.gov, as of October 25, 2026

Columns: Every row of the U.S. Virgin Islands WDs: WD number, modification number and date, construction types, scope, rate identifier and its date, classification, base, fringe as printed, fringe kind, our total, review flags and the source URL and line. Each file has every field the pipeline records; lists are JSON in their cell.

3 locality files

Utah: 2,261 rates, Davis-Bacon wage determinations on SAM.gov, as of October 25, 2026

Columns: Every row of the Utah WDs: WD number, modification number and date, construction types, scope, rate identifier and its date, classification, base, fringe as printed, fringe kind, our total, review flags and the source URL and line. Each file has every field the pipeline records; lists are JSON in their cell.

29 locality files

Vermont: 795 rates, Davis-Bacon wage determinations on SAM.gov, as of October 25, 2026

Columns: Every row of the Vermont WDs: WD number, modification number and date, construction types, scope, rate identifier and its date, classification, base, fringe as printed, fringe kind, our total, review flags and the source URL and line. Each file has every field the pipeline records; lists are JSON in their cell.

14 locality files

Virginia: 4,768 rates, Davis-Bacon wage determinations on SAM.gov, as of October 25, 2026

Columns: Every row of the Virginia WDs: WD number, modification number and date, construction types, scope, rate identifier and its date, classification, base, fringe as printed, fringe kind, our total, review flags and the source URL and line. Each file has every field the pipeline records; lists are JSON in their cell.

133 locality files

Washington: 21,143 rates, L&I period 2026-2

Columns: county, craft, trade_code, trade, sub_trade, classification, residential, wage_basis, wage_source_name, issue_date, effective_date, base, health_welfare, pension, vacation_holiday, training, other, total_straight_time, total_note, overtime_code, holiday_code, note_code, wac_code, lni_wage_id, source_url. total_straight_time is L&I's published total. Where it is the state minimum wage above the sum of the columns, total_note says so. Blank fringe cells are blank, not zero. Overtime and holiday code text is in codes.json.

39 county files

West Virginia: 3,544 rates, Davis-Bacon wage determinations on SAM.gov, as of October 25, 2026

Columns: Every row of the West Virginia WDs: WD number, modification number and date, construction types, scope, rate identifier and its date, classification, base, fringe as printed, fringe kind, our total, review flags and the source URL and line. Each file has every field the pipeline records; lists are JSON in their cell.

55 locality files

Wisconsin: 1,101 rates, Davis-Bacon wage determinations on SAM.gov, as of October 25, 2026

Columns: Every row of the Wisconsin WDs: WD number, modification number and date, construction types, scope, rate identifier and its date, classification, base, fringe as printed, fringe kind, our total, review flags and the source URL and line. Each file has every field the pipeline records; lists are JSON in their cell.

72 locality files

Wyoming: 90 rates, DWS 2026 rates (effective May 1, 2026)

Columns: Every row of DWS's 2026 sheet: column (statewide building; heavy and highway statewide, Laramie, Natrona, rest of state), craft, survey code, classification, wage, fringe, method codes and our total. Each file has every field the pipeline records; lists are JSON in their cell.

23 locality files