    CMR for the Renovations of the Restrooms and Breakrooms at a State Office Building

    Texas Facilities Commission - 303

    Work location to confirm

    Source notice

    SCOPE: In accordance with the provisions of Texas Government Code, Chapter 2269, Subchapter F, Construction Manager-at-Risk Method, and Rules and Procedures adopted by the Texas Facilities Commission (TFC), TFC is requesting qualifications for a Construction Manager-at-Risk (CMR) to perform renovation services to the restrooms and breakrooms at the William P. Clements State Office Building, floors 1-12 and 14 located at 300 W 15th Street, Austin, Texas 78701 hereinafter described as TFC Project #26-005-4203 (the Project). This Project will be administered by TFC.

    This procurement will be a two-step award process with a two-part work requirement.

    a) Step One of the solicitation will include a submittal of company experience and qualifications focusing on projects of similar size and type. Respondents will be evaluated on experience and qualifications, as detailed in Section V, Submission Requirements.

    b) Step Two of the solicitation will include only the highest ranked five or fewer Respondents from Step One who will be asked to provide pricing.

    SECTION II - PROJECTDESCRIPTION

    PROJECT DESCRIPTION: The project consists of renovations of the existing restrooms, adding additional restrooms, and renovations of the existing breakrooms on floors 1-12 and 14. The renovations will include upgrading the existing sanitary sewer lines on floors 1-12 and 14. The project is located within the William P. Clements State Office Building located at 300 W 15th St., Austin Texas.

    ASBESTOS ABATEMENT: For the consideration of this RFQ, TFC is assessing any known asbestos materials in the existing facility to be abated prior to demolition and construction. Any asbestos abatement of the building is to be considered outside of the construction contract and budget of this RFQ.

    THIRD PARTY TESTING: TFC shall provide or contract with third party for Testing and Balancing Services, RAS Review, Commissioning (BECx and CxA), and Construction Materials Testing.

    SECTION III - SCOPE OF WORK

    SERVICES: CMR services shall be comprehensive in nature and will include but not be limited to: pre-construction services, estimation services, participation in constructability reviews, development/management of complex critical path schedules and bidding multiple packages as necessary to execute the project scope of work. The number of bid packages and Guaranteed Maximum Price amendments to be determined by TFC in cooperation with the A/E and CMR

    PART ONE: Collaborate with TFC and its Architect and Engineer Firm (A/E) and third-party consultants, and stakeholders during the completion of construction documents including review and comments at each negotiated milestone prior to completion of Construction Documents. The Respondent’s expertise will be used to affect value engineering, establish a project schedule and ultimately determine the GMP. The services include attending meetings, consultation of plan reviews, constructability reviews, and cost estimating. Provide CMR services from pre-design through construction close-out, as described in Attachment G – CMR Contract Template.

    PART TWO: In accordance with the approved schedule and GMP, the Contractor is responsible for managing the competitive solicitation process for subcontractors and helping the owner/client select those subcontractors, while complying with all VetHUB requirements and provide and/or secure and install all materials, labor, coordination, management and supervisory activities necessary to complete construction of the Project in accordance with the drawings, specifications and other contract documents that will be prepared by the A/E & TFC.

    SUBCONTRACTORS: Subcontractors providing services shall meet the same requirements and level of experience as required of the Respondent. No subcontract shall relieve the primary Respondent of responsibility for the service. If the Respondent uses a subcontractor for any or all of the work required, the following conditions shall apply under the listed circumstances:

    a) Respondents planning to subcontract all or a portion of the work shall identify the proposed subcontractors on the Attachment B – Subcontracting Plan Forms.

    b) Subcontracting shall be at the Respondent’s expense.

    c) TFC retains the right to check a subcontractor’s background and make a determination to approve or reject the use of submitted subcontractors.

    d) The Respondent shall be the only contact for TFC and subcontractors. Respondent shall list a designated point of contact for all TFC and subcontractor inquiries.

    SATISFACTORY UNDERSTANDING: Respondents will be held to have satisfactory understanding regarding all existing conditions and to have included in the proposal an amount sufficient to cover all work including permits, fees, etc.

    CONTRACT TERM: Construction is required tocommence within five (5) calendar days after the Notice to Proceed forConstruction is issued. For planning purposes, the pre-construction time periodis estimated to be one hundred and eighty (180) calendar days. The construction contract period is projectedfor a term of three hundred and sixty-five (365) calendar days except as may beotherwise amended or negotiated.

    MANDATORYPRE-SUBMITTAL TELECONFERENCES: Mandatory pre-submittal teleconferences will be held onMonday, November 30, 2026, at 10:00am and Tuesday December 01, 2026, at 2:00pm.Pre-registration is required to participate in the teleconference. Respondents must have an employee of theirfirm attend at least one (1) of the two (2) pre-submittal conferences . TFCshall reject qualifications submitted by firms that did not attend one of themandatory pre-submittal conferences.

    EVENT

    DATE

    Issue RFQ

    11/17/2026

    Mandatory Pre-Submittal Teleconferences

    1 st Pre-Submittal Conference

    OR

    2 nd Pre-Submittal Conference

    11/30/2026, 10:00 AM

    OR

    12/01/2026, 02:00 PM

    Deadline for SP Good Faith Effort Notification Emails

    12/03/2026

    Deadline for Submission of Questions

    12/09/2026, Noon

    TFC’s Response to Questions

    12/11/2026, 5:00 PM

    Deadline for Submission of Qualifications and SP

    12/15/2026, 3:00 PM

    Notification of Short List Selection

    12/28/2026

    Optional Site Visit

    01/05/2027, 10:00 AM

    Deadline for Submission of Step 2 Pricing Proposals

    01/08/2027, 3:00 PM

    If interviews are NOT required by TFC

    Award by Commission

    02/18/2027, 9:00 AM

    Execute Contract

    03/01/2027

    If interviews are required by TFC

    Notification of Interview Selection

    01/12/2027

    Interviews

    01/20/2027

    Award by Commission

    02/18/2027, 9:00 AM

    Execute Contract

    03/01/2027

    Trades mentioned

    These matches come from the notice title or scope. They do not establish separate subcontract packages or an invitation to bid.

    Why these trades matched
    • Demolition — notice scope: “d at 300 W 15th St., Austin Texas. ASBESTOS ABATEMENT: For the consideration of this RFQ, TFC is assessing any known asbestos ma”
    • Utilities & drainage — notice scope: “will include upgrading the existing sanitary sewer lines on floors 1-12 and 14. The project is located within the William P. ”
    • General construction — notice scope: “Government Code, Chapter 2269, Subchapter F, Construction Manager-at-Risk Method, and Rules and Procedures adopted by the Texas Faci”

    Requirements and eligibility

    Review the complete solicitation for bonding, insurance, experience, licensing, registration and mandatory meetings. An item missing from this listing is not confirmation that the agency has no requirement.

    Wages and labor

    Check the solicitation for the applicable wage determination. A construction notice alone does not establish which federal or state wage requirements apply.

    Documents and submission

    Submit through the method specified by the agency. PWH does not accept bids. Check the official notice for the complete package and the latest addenda.

    Open official notice

    Source and dates

    Texas ESBD · Reference 0010246

    Last collected Nov 18, 2026. Dates and requirements can change; verify the agency’s current notice before responding.

    Create your free account

    Keep your jobs and rates together, on any device.

    No password. Rate alerts are optional.

    Already have an account?