Skip to content
Independent · not a government sitePublic works opportunitiesHow we check · Corrections
JobNo rates saved
    Nothing saved yet

    Save a rate from any rate page. It lands here with its determination, ready for the rate sheet.

    Create account

    Home / Public works bids / W912WJ27QA001

    Accepting bids · SAM.gov

    Dike B Generator Installation, Mansfield Hollow Dam, Mansfield Center, CT

    DEPT OF DEFENSE

    Mansfield Center, CT

    Source notice

    The U.S. Army Corps of Engineers - New England District is issuing a Solicitation Notice for Dike B Generator Installation, Mansfield Hollow Dam, Mansfield Center, CT. THE WORK CONSISTS OF: The Contractor shall furnish all necessary materials, equipment, and labor required to construct and commission a new power system for the Dike B Operator unit. The scope of work involves comprehensive site preparation to support the construction of a reinforced concrete generator pad and the installation of secure perimeter fencing.

    The Contractor is responsible for the procurement and installation of a standalone, propane-powered generator and a corresponding propane fuel storage tanks. Following the physical installation, the Contractor shall execute all final electrical connections and integration into the existing sluice gate operator unit and control panel.

    All work shall comply with all applicable federal laws and codes, and shall be completed in accordance with the Statement of Work. This procurement is set-aside for small business vendors. The applicable NAICS code is 238290 with a Small Business Size Standard of $22 Million. ALL VENDORS MUST HAVE AN ACTIVE REGISTRATION IN SAM.GOV AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDERED. ANY VENDOR THAT DOES NOT HAVE AN ACTIVE SAM.GOV REGISTRATION WILL BE REJECTED AS NON RESPONSIVE.

    Trades mentioned

    These matches come from the notice title or scope. They do not establish separate subcontract packages or an invitation to bid.

    Why these trades matched
    • Electrical — notice scope: “tion, the Contractor shall execute all final electrical connections and integration into the existing sluice gate operator unit an”
    • Concrete & masonry — notice scope: “ to support the construction of a reinforced concrete generator pad and the installation of secure perimeter fencing. The Contra”
    • Earthwork & site preparation — notice scope: “it. The scope of work involves comprehensive site preparation to support the construction of a reinforced concrete generator pad and the”
    • General construction — notice scope: “omprehensive site preparation to support the construction of a reinforced concrete generator pad and the installation of secure peri”

    Requirements and eligibility

    Set-aside
    Small Business Set Aside - TotalSource listing
    NAICS
    238290Source listing
    PSC
    Y1QASource listing

    Review the complete solicitation for bonding, insurance, experience, licensing, registration and mandatory meetings. An item missing from this listing is not confirmation that the agency has no requirement.

    Wages and labor

    Check the solicitation for the applicable wage determination. A construction notice alone does not establish which federal or state wage requirements apply.

    Documents and submission

    Submit through the method specified by the agency. PWH does not accept bids. Check the official notice for the complete package and the latest addenda.

    Open official notice

    Source and dates

    SAM.gov · Reference W912WJ27QA001

    Last collected Nov 18, 2026. Dates and requirements can change; verify the agency’s current notice before responding.

    Create your free account

    Keep your jobs and rates together, on any device.

    No password. Rate alerts are optional.

    Already have an account?