November 5, 2026- Amendment 1 issued to clarify timne and location of the Pre-Proposal Meeting. This scope of work is to rebuild and renovate the Kautz Road Substation (KRS), which is UIP subproject SP-2. The KRS supplies electricity to various lab buildings and systems. These systems serve both conventional facility needs, as well as process utility requirements. It is vital to Fermilab’s mission that KRS be revitalized and expanded, ensuring the ability to serve existing and future loads.
The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications.
All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab.
The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 – 60 Calendar Days after issuance of Notice to Proceed (NTP).
This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement. Milestone 2 – 4th January 2028; This milestone marks the point where access is permitted inside Kautz Road Substation yard and construction work may begin. Milestone 3 – 31st of March 2028; This milestone marks the completion of building foundation and ready for placement of the new prefabricated control house building (provided by FermiForward).
Milestone 4 – 2nd July 2029; This milestone marks the formal issuance of an Authorization for Use and Possession (AUP) of the KRS Substation facility, including all remedial work following removal of site trailers, but not including seasonal work and all final punch list items addressed.. Milestone 5 – 30th September 2029; This milestone marks the completion of the project.
Trades mentioned
These matches come from the notice title or scope. They do not establish separate subcontract packages or an invitation to bid.
Why these trades matched
- General construction — notice scope: “herein. The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated sc”
Requirements and eligibility
- Set-aside
- No Set aside usedSource listing
- NAICS
- 237130Source listing
- PSC
- Z2MZSource listing
Review the complete solicitation for bonding, insurance, experience, licensing, registration and mandatory meetings. An item missing from this listing is not confirmation that the agency has no requirement.
Wages and labor
Check the solicitation for the applicable wage determination. A construction notice alone does not establish which federal or state wage requirements apply.
Documents and submission
Submit through the method specified by the agency. PWH does not accept bids. Check the official notice for the complete package and the latest addenda.
Open official noticeSource and dates
SAM.gov · Reference RFP-383167-CD
Last collected Nov 18, 2026. Dates and requirements can change; verify the agency’s current notice before responding.