    Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB

    ENERGY, DEPARTMENT OF

    Batavia, IL

    Source notice

    On Ocotber 30, 2026, Amendment No. 3 was issued to provide responses to questioins received from prospective offerors, provide as-built drawing and photos for reference only, extend thequestions due date to December 1, 2026, and to extend the proposal due date to December 17, 2026. On October 7, 2026, Amendment No. 2 was issued to correct badge access link provided in Amendment No. 1. On October 6, 2026, Amendment No. 1 was issued to provide dates for site visits. This scope of work is to build an addition and renovate the Central Utility Building (CUB).

    The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements.

    It is vital to Fermilab’s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein.

    The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab.

    The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 – Issuance of Notice to Proceed (NTP) to 30th December 2027. This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement. Milestone 2 – 3rd January 2028; This milestone marks the point where construction work may begin. Milestone 3 – 31st January 2029; AUP 1 CUB Extension complete. Milestone 4 – 29th June 2029; AUP 2 Existing CUB Upgrade complete.

    Milestone 5 – 28th September 2029; Completion of CUB- including all remedial work following removal of site trailers.

    Trades mentioned

    These matches come from the notice title or scope. They do not establish separate subcontract packages or an invitation to bid.

    Why these trades matched
    • HVAC & mechanical — notice scope: “These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital t”
    • General construction — title: “Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB”

    Requirements and eligibility

    Set-aside
    No Set aside usedSource listing
    NAICS
    236210Source listing
    PSC
    Z2EZSource listing

    Review the complete solicitation for bonding, insurance, experience, licensing, registration and mandatory meetings. An item missing from this listing is not confirmation that the agency has no requirement.

    Wages and labor

    Check the solicitation for the applicable wage determination. A construction notice alone does not establish which federal or state wage requirements apply.

    Documents and submission

    Submit through the method specified by the agency. PWH does not accept bids. Check the official notice for the complete package and the latest addenda.

    Open official notice

    Source and dates

    SAM.gov · Reference RFP-376508-CD

    Last collected Nov 18, 2026. Dates and requirements can change; verify the agency’s current notice before responding.

    Create your free account

    Keep your jobs and rates together, on any device.

    No password. Rate alerts are optional.

    Already have an account?