Skip to content
Independent · not a government sitePublic works opportunitiesHow we check · Corrections
JobNo rates saved
    Nothing saved yet

    Save a rate from any rate page. It lands here with its determination, ready for the rate sheet.

    Create account

    Home / Public works bids / N6660427Q0033

    Accepting bids · SAM.gov

    Construction-NUWCDIVNPT-Interior Renovations

    DEPT OF DEFENSE

    Newport, RI

    Source notice

    The Naval Undersea Warfare Center Division Newport (NUWCDIVNPT) has a commercial construction requirement for interior facility alterations and renovations. Under this firm-fixed-price completion effort, the contractor shall provide all labor, management, supervision, tools, materials, equipment, transportation, and quality control necessary to perform selective architectural demolition (removal of suspended ceilings, flooring down to concrete slab, interior doors, and select partitions) and complete renovation services—including new interior metal stud partitions with Level 5 gypsum wallboard finishes, acoustical ceiling systems with humidity-resistant tiles, vinyl composition tile (VCT) flooring with vinyl cove base, low/zero-VOC interior painting, heavy-duty interior double doors, and interior window units.

    The requirement further includes reconfiguring HVAC supply diffusers and return grilles, and providing complete electrical distribution upgrades (including a 45 kVA transformer, disconnect switch, and branch panels) to support baseboard convection heating, dimmable LED troffers, localized occupancy sensors, and emergency egress lighting. All work will be executed within an active, occupied military research facility under USACE EM 385-1-1 safety standards, lead-based paint remediation controls, asbestos containment awareness, and base security access requirements within a 120-calendar-day completion Period of Performance.

    INSTRUCTIONS TO REQUEST ACCESS TO RESTRICTED DOCUMENTS Bidders must submit an access request through the SAM.gov "Controlled" document access system.

    To be approved for access, the Contractor must satisfy the following criteria: STEP 1: SUBMIT THE ACCESS REQUEST IN SAM.GOV In SAM.gov, locate the "Controlled" attachments under the "Attachments" section of this solicitation and click "Request Access." STEP 2: PROVIDE CAGE CODE AND CMMC UNIQUE IDENTIFIER (UID) In the "Reason for Access" text field, you MUST provide the following details: Active Company CAGE Code (Must be active in SAM.gov). Company CMMC Unique Identifier (UID) / SPRS Entry ID.

    CYBERSECURITY MANDATE (DFARS 252.204-7019 / NIST SP 800-171) Bidders are strictly cautioned that this project incorporates DFARS 252.204-7019 (Notice of NIST SP 800-171 DoD Assessment Requirements).

    In accordance with DFARS 252.204-7019, the Contracting Officer is legally prohibited from awarding this contract to any bidder who does not have an active NIST SP 800-171 assessment score posted in SPRS at the time of award evaluation. Bidders are encouraged to ensure their SPRS postings are current (completed within the last 3 years) prior to proposal submission. POINTS OF CONTACT (POC) If you experience technical issues requesting access through SAM.gov, please contact the SAM.gov Help Desk.

    For contractual, legal, or project-specific inquiries, contact the following individuals immediately: Contract Specialist: Amy Prisco- [contact in official notice] Contracting Officer: Michael Ouellette - [contact in official notice]

    Trades mentioned

    These matches come from the notice title or scope. They do not establish separate subcontract packages or an invitation to bid.

    Why these trades matched
    • Electrical — notice scope: “s and return grilles, and providing complete electrical distribution upgrades (including a 45 kVA transformer, disconnect switch, ”
    • HVAC & mechanical — notice scope: “e requirement further includes reconfiguring HVAC supply diffusers and return grilles, and providing complete electrical dis”
    • Concrete & masonry — notice scope: “oval of suspended ceilings, flooring down to concrete slab, interior doors, and select partitions) and complete renovation servi”
    • Demolition — notice scope: “necessary to perform selective architectural demolition (removal of suspended ceilings, flooring down to concrete slab, interior d”
    • Painting & coatings — notice scope: “ with vinyl cove base, low/zero-VOC interior painting, heavy-duty interior double doors, and interior window units. The require”
    • General construction — title: “Construction-NUWCDIVNPT-Interior Renovations”

    Requirements and eligibility

    Set-aside
    Small Business Set Aside - TotalSource listing
    NAICS
    236220Source listing
    PSC
    Z1AZSource listing

    Review the complete solicitation for bonding, insurance, experience, licensing, registration and mandatory meetings. An item missing from this listing is not confirmation that the agency has no requirement.

    Wages and labor

    Check the solicitation for the applicable wage determination. A construction notice alone does not establish which federal or state wage requirements apply.

    Documents and submission

    Submit through the method specified by the agency. PWH does not accept bids. Check the official notice for the complete package and the latest addenda.

    Open official notice

    Source and dates

    SAM.gov · Reference N6660427Q0033

    Last collected Nov 18, 2026. Dates and requirements can change; verify the agency’s current notice before responding.

    Create your free account

    Keep your jobs and rates together, on any device.

    No password. Rate alerts are optional.

    Already have an account?