Home / Public works bids / 2026-PTG-FACPR
Fire Alarm Control Panel Replacement Project (FACPR)
ENERGY, DEPARTMENT OF
California
Source notice
The University of California, Lawrence Berkeley National Laboratory requests proposals for design-build services for the design and construction of the Fire Alarm Control Panel Replacement Project ("FACPR" or "the Project"). The Project covers Buildings 2, 26, 33, and 76. Under this subcontract, the Design-Build Subcontractor will provide all professional design, engineering, procurement, installation, changeover, and commissioning services needed to replace the fire alarm control panels and backup battery systems.
The Siemens Desigo system has been selected as LBNL's campus-standard fire alarm platform for this Project, no substitutions will be considered. Using one common platform supports compatibility with the existing mix of field devices, loops, and conventional circuits, and simplifies maintenance, training, and future parts availability across the site.
The existing fire alarm wiring in the four buildings will generally remain in place. This Project replaces the central control equipment, not the complete building fire alarm systems. Fire alarm annunciation and notification devices and the StarLink cabinets themselves are not being replaced under this Project; StarLink cabinets will be relocated only as needed to follow the panels.
Trades mentioned
These matches come from the notice title or scope. They do not establish separate subcontract packages or an invitation to bid.
Why these trades matched
- General construction — notice scope: “y National Laboratory requests proposals for design-build services for the design and construction of the Fire Alarm Control Panel R”
Requirements and eligibility
- Set-aside
- No Set aside usedSource listing
- NAICS
- 238210Source listing
- PSC
- 1230Source listing
Review the complete solicitation for bonding, insurance, experience, licensing, registration and mandatory meetings. An item missing from this listing is not confirmation that the agency has no requirement.
Wages and labor
Check the solicitation for the applicable wage determination. A construction notice alone does not establish which federal or state wage requirements apply.
Documents and submission
Submit through the method specified by the agency. PWH does not accept bids. Check the official notice for the complete package and the latest addenda.
Open official noticeSource and dates
SAM.gov · Reference 2026-PTG-FACPR
Last collected Nov 18, 2026. Dates and requirements can change; verify the agency’s current notice before responding.