SR 519, Seattle Trm - Terminal Electrification
Washington State Department of Transportation
King County
Source notice
Build the necessary infrastructure and power supply to enable charging of Hybrid Electric Ferries at Colman Dock Slips #1 and #3. The design build contractor will work closely and collaboratively with the Washington State Ferries, systems integrator, vessel charging system (VCS) supplier, and…
Trades mentioned
These matches come from the notice title or scope. They do not establish separate subcontract packages or an invitation to bid.
Why these trades matched
- General construction — notice scope: “ Ferries at Colman Dock Slips #1 and #3. The design build contractor will work closely and collaboratively with the Washington State”
Requirements and eligibility
Review the complete solicitation for bonding, insurance, experience, licensing, registration and mandatory meetings. An item missing from this listing is not confirmation that the agency has no requirement.
Wages and labor
Check the solicitation for the applicable wage determination. A construction notice alone does not establish which federal or state wage requirements apply.
Documents and submission
Submit through the method specified by the agency. PWH does not accept bids. Check the official notice for the complete package and the latest addenda.
Open official noticeSource and dates
WSDOT · Reference sr-519-seattle-trm-terminal-electrification
Last collected Nov 18, 2026. Dates and requirements can change; verify the agency’s current notice before responding.