Home / Public works bids / W912WJ26RA008
Construction of Chilled Water Plant and Site Utility Upgrades at VA Medical Center in West Haven, CT
DEPT OF DEFENSE
West Haven, CT
Source notice
The scope of the chilled water plant replacement consists of the demolition of the existing chilled water plant (building 16a) and construction of a new multi-story chilled water plant to include chillers, cooling towers, pumps, and all associated mechanical and electrical equipment. Due to the close proximity of the existing fuel tank farm adjacent to the existing chilled water plant, a new fuel tank farm will need to be constructed as part of the project, which primarily serves the central boiler plant, requiring close coordination with the medical center and ongoing related projects.The scope of the site utility upgrades consists of the replacement and upgrade of the existing fire protection water main and the domestic water main from Campbell Avenue to Building 15.
Site utility upgrades also include providing utility main loops of chilled water supply and return, steam supply, condensate return, domestic water supply, and fire protection water supply which will originate from the new chilled water plant and back-feed to Building 1. The work also includes the installation of redundant electrical feeder from the utility demarcation point to Building 19 and coordination with the local electrical utility provider to provide further electrical redundancy offsite as well. In addition, new water storage tanks will be constructed.
This project involves civil/site, mechanical, electrical, plumbing, structural, geotechnical, and architectural disciplines. The project must also comply with the DVAs Physical Security Resiliency Design Requirements (PSRDM). It is expected that the chilled water plant will be constructed to meet USGBC LEED Silver certification.
The work is located adjacent to and within an active Medical Center campus which will be operational at all times. Impact to on-going operations must be kept to a minimum and carefully coordinated with the Contracting Officer and VAMC staff. In addition, the work area is constrained due to the active medical center operations which will limit laydown and storage areas during construction.
Trades mentioned
These matches come from the notice title or scope. They do not establish separate subcontract packages or an invitation to bid.
Why these trades matched
- Electrical — notice scope: “rs, pumps, and all associated mechanical and electrical equipment. Due to the close proximity of the existing fuel tank farm adjac”
- Plumbing — notice scope: “involves civil/site, mechanical, electrical, plumbing, structural, geotechnical, and architectural disciplines. The project must”
- HVAC & mechanical — notice scope: “ project, which primarily serves the central boiler plant, requiring close coordination with the medical center and ongoing re”
- Demolition — notice scope: “lled water plant replacement consists of the demolition of the existing chilled water plant (building 16a) and construction of a n”
- Utilities & drainage — notice scope: “ and upgrade of the existing fire protection water main and the domestic water main from Campbell Avenue to Building 15. Site uti”
- General construction — title: “Construction of Chilled Water Plant and Site Utility Upgrades at VA Medical Center in W”
Requirements and eligibility
- NAICS
- 236220Source listing
- PSC
- Y1NBSource listing
Review the complete solicitation for bonding, insurance, experience, licensing, registration and mandatory meetings. An item missing from this listing is not confirmation that the agency has no requirement.
Wages and labor
Check the solicitation for the applicable wage determination. A construction notice alone does not establish which federal or state wage requirements apply.
Documents and submission
Submit through the method specified by the agency. PWH does not accept bids. Check the official notice for the complete package and the latest addenda.
Open official noticeSource and dates
SAM.gov · Reference W912WJ26RA008
Last collected Nov 18, 2026. Dates and requirements can change; verify the agency’s current notice before responding.