Home / Public works bids / 23-03922
Toepperwein Rd (Nacogdoches to Wenzel Rd) - 2022 Bond
City of San Antonio - M0152
Work location to confirm
Source notice
Project scope includes the widening and reconstruction of Toepperwein Road to a 3-lane section with a new underground storm sewer system, curbs, sidewalk, shared use path, driveways, and signal improvements at Nacogdoches Rd and Comanche Parkway. This project also includes SAWS water relocations & improvements, SAWS sewer relocations and surface adjustments, and CPS gas improvements.
Trades mentioned
These matches come from the notice title or scope. They do not establish separate subcontract packages or an invitation to bid.
Why these trades matched
- Concrete & masonry — notice scope: “a new underground storm sewer system, curbs, sidewalk, shared use path, driveways, and signal improvements at Nacogdoches Rd and”
- Utilities & drainage — notice scope: “ 3-lane section with a new underground storm sewer system, curbs, sidewalk, shared use path, driveways, and signal improvemen”
Requirements and eligibility
Review the complete solicitation for bonding, insurance, experience, licensing, registration and mandatory meetings. An item missing from this listing is not confirmation that the agency has no requirement.
Wages and labor
Check the solicitation for the applicable wage determination. A construction notice alone does not establish which federal or state wage requirements apply.
Documents and submission
Submit through the method specified by the agency. PWH does not accept bids. Check the official notice for the complete package and the latest addenda.
Open official noticeSource and dates
Texas ESBD · Reference 23-03922
Last collected Nov 18, 2026. Dates and requirements can change; verify the agency’s current notice before responding.