Home / Public works bids / GMP2
College Station - James-Puryear & Francis Drive (GMP#2)
City Of College Station - M0210
Work location to confirm
Source notice
The project includes a multi-component public infrastructure and park improvement project. Phase 2 (GMP#2) of this project includes: the redevelopment of James Parkway, Puryear Drive, and Francis Drive.
- Scope includes (but is not limited to): demolition, milling of existing asphalt, earthwork, subgrade stabilization, SWPPP, traffic control, tree protection, Water/Sanitary/Storm utilities & infrastructure upgrades, concrete paving, concrete curbs, concrete sidewalks, concrete driveways, stamped colored concrete, gravel driveways, asphalt transitions, paving sealants, pavement markings, signage, mailboxes, street lighting & power modifications, landscape/hardscape/irrigation repairs.
Trades mentioned
These matches come from the notice title or scope. They do not establish separate subcontract packages or an invitation to bid.
Why these trades matched
- Electrical — notice scope: “avement markings, signage, mailboxes, street lighting & power modifications, landscape/hardscape/irrigation repairs.”
- Concrete & masonry — notice scope: “y/Storm utilities & infrastructure upgrades, concrete paving, concrete curbs, concrete sidewalks, concrete driveways, stamped co”
- Paving & asphalt — notice scope: “limited to): demolition, milling of existing asphalt, earthwork, subgrade stabilization, SWPPP, traffic control, tree protectio”
- Earthwork & site preparation — notice scope: “o): demolition, milling of existing asphalt, earthwork, subgrade stabilization, SWPPP, traffic control, tree protection, Water/Sa”
- Demolition — notice scope: “. - Scope includes (but is not limited to): demolition, milling of existing asphalt, earthwork, subgrade stabilization, SWPPP, tr”
- Landscaping — notice scope: “oxes, street lighting & power modifications, landscape/hardscape/irrigation repairs.”
Requirements and eligibility
Review the complete solicitation for bonding, insurance, experience, licensing, registration and mandatory meetings. An item missing from this listing is not confirmation that the agency has no requirement.
Wages and labor
Check the solicitation for the applicable wage determination. A construction notice alone does not establish which federal or state wage requirements apply.
Documents and submission
Submit through the method specified by the agency. PWH does not accept bids. Check the official notice for the complete package and the latest addenda.
Open official noticeSource and dates
Texas ESBD · Reference GMP2
Last collected Nov 18, 2026. Dates and requirements can change; verify the agency’s current notice before responding.