Skip to content
Independent · not a government sitePublic works opportunitiesHow we check · Corrections
JobNo rates saved
    Nothing saved yet

    Save a rate from any rate page. It lands here with its determination, ready for the rate sheet.

    Create account

    Home / Public works bids / 2027-crisi-rural-rail-rehabilitation-pv-hooper-branch-pcc

    Accepting bids · WSDOT

    2027 CRISI Rural Rail Rehabilitation - PV Hooper Branch - PCC

    Washington State Department of Transportation

    Adams County, Whitman County

    Source notice

    Improvement of railroad crossings and mainline track work along the PV/Hooper Branch of the PCC Railroad system by removing crossings, turnouts, rail, ties, cleanup and disposal of legacy material and roadway excavation, installing CSBC, CCP and HMA paving, pavement markings, culverts, ballast…

    Trades mentioned

    These matches come from the notice title or scope. They do not establish separate subcontract packages or an invitation to bid.

    Why these trades matched
    • Paving & asphalt — notice scope: “roadway excavation, installing CSBC, CCP and HMA paving, pavement markings, culverts, ballast…”
    • Earthwork & site preparation — notice scope: “ and disposal of legacy material and roadway excavation, installing CSBC, CCP and HMA paving, pavement markings, culverts, ballast”
    • General construction — title: “2027 CRISI Rural Rail Rehabilitation - PV Hooper Branch - PCC”

    Requirements and eligibility

    Review the complete solicitation for bonding, insurance, experience, licensing, registration and mandatory meetings. An item missing from this listing is not confirmation that the agency has no requirement.

    Wages and labor

    Check the solicitation for the applicable wage determination. A construction notice alone does not establish which federal or state wage requirements apply.

    Documents and submission

    Submit through the method specified by the agency. PWH does not accept bids. Check the official notice for the complete package and the latest addenda.

    Open official notice

    Source and dates

    WSDOT · Reference 2027-crisi-rural-rail-rehabilitation-pv-hooper-branch-pcc

    Last collected Nov 18, 2026. Dates and requirements can change; verify the agency’s current notice before responding.

    Create your free account

    Keep your jobs and rates together, on any device.

    No password. Rate alerts are optional.

    Already have an account?