Skip to content
Independent · not a government sitePublic works opportunitiesHow we check · Corrections
JobNo rates saved
    Nothing saved yet

    Save a rate from any rate page. It lands here with its determination, ready for the rate sheet.

    Create account

    Home / Public works bids / W9123626BA008

    Accepting bids · SAM.gov

    Fort Eustis Dredge Material Management Area (FEDMMA)

    DEPT OF DEFENSE

    Fort Eustis, VA

    Source notice

    Amendment 0006: An amendment has been made to Solicitation W9123626BA0008. Please see attachment SF30, Solicitation Amendment W9123626BA008_0006, extending the bid due date and bid opening date. The Norfolk District, Corps of Engineers is contemplating a firm-fixed-price contract for the Design-Bid-Build construction of maintenance requirements at the Fort Eustis Dredge Material Management Area (FEDMMA), located at JBLE - Eustis with provisions to include Regrading/raising the disposal site berms to an elevation of 36 ft. The berms are currently at elevation 34 ft and have settled in a few places to below 34 ft.

    The work will also include the relocation of two existing spill boxes 50 - 60 feet into the disposal site. The existing access dirt and stone access ramp will need to be regraded, as well, to meet the new top-of-berm elevation.

    Trades mentioned

    These matches come from the notice title or scope. They do not establish separate subcontract packages or an invitation to bid.

    Why these trades matched
    • General construction — notice scope: “ixed-price contract for the Design-Bid-Build construction of maintenance requirements at the Fort Eustis Dredge Material Management ”

    Requirements and eligibility

    Set-aside
    Small Business Set Aside - TotalSource listing
    NAICS
    237990Source listing
    PSC
    Z2KFSource listing

    Review the complete solicitation for bonding, insurance, experience, licensing, registration and mandatory meetings. An item missing from this listing is not confirmation that the agency has no requirement.

    Wages and labor

    Check the solicitation for the applicable wage determination. A construction notice alone does not establish which federal or state wage requirements apply.

    Documents and submission

    Submit through the method specified by the agency. PWH does not accept bids. Check the official notice for the complete package and the latest addenda.

    Open official notice

    Source and dates

    SAM.gov · Reference W9123626BA008

    Last collected Nov 18, 2026. Dates and requirements can change; verify the agency’s current notice before responding.

    Create your free account

    Keep your jobs and rates together, on any device.

    No password. Rate alerts are optional.

    Already have an account?