Home / Public works bids / 2031ZA26R00027
Cooling Tower, Roofing, and Structural Construction
TREASURY, DEPARTMENT OF THE
District Of Columbia
Source notice
11/12/2026 - Amendment 0003 is issued to reflect the following (see attachment titled "2031ZA26R00027 0003"): 1. Will there be another site visit held since the date was extended? Government Response: There will not be another site visit as the solicitation explicitly establish a fixed date and time which afforded an opportunity. 2. Is there a way for us to schedule a site visit? Government Response: No, however please submit technical questions in writing by the due date set in solicitation amendment 0002. 11/05/2026 - Amendment 0002 is issued to reflect the following: 1. Extend the due date to December 11, 2026. 2.
Replace Statement of Work, see "Attachment 3 - Statement of Work - Cooling Towers Revision 02 Amendment 0002." 3. Updated Request for Proposal (RFP), see changes highlighted in yellow, "2031ZA26R00027 Revision 01 11052026." 4.
Updated - "Attachment 4 - Pricing Table Revision 01 Amendment 0002." 5. Include attachments 8, 10,11,12 and 14-32. 10/08/2026 - Amendment 0001 is issued to extend the due date to November 9, 2026 to allow the government time to update the Statement of Work (SOW) and obtain authorization to include drawings and pictures. (See attached 2031ZA26R00027 0001). 09/16/2026 - See Request for Proposal with attachments.
Trades mentioned
These matches come from the notice title or scope. They do not establish separate subcontract packages or an invitation to bid.
Why these trades matched
- Roofing — title: “Cooling Tower, Roofing, and Structural Construction”
- General construction — title: “Cooling Tower, Roofing, and Structural Construction”
Requirements and eligibility
- Set-aside
- Small Business Set Aside - TotalSource listing
- NAICS
- 236220Source listing
- PSC
- Z2ECSource listing
Review the complete solicitation for bonding, insurance, experience, licensing, registration and mandatory meetings. An item missing from this listing is not confirmation that the agency has no requirement.
Wages and labor
Check the solicitation for the applicable wage determination. A construction notice alone does not establish which federal or state wage requirements apply.
Documents and submission
Submit through the method specified by the agency. PWH does not accept bids. Check the official notice for the complete package and the latest addenda.
Open official noticeSource and dates
SAM.gov · Reference 2031ZA26R00027
Last collected Nov 18, 2026. Dates and requirements can change; verify the agency’s current notice before responding.