Home / Public works bids / 36C24226B0065
Y1DA--NRM-CONST 528-CSI-102 Urology Equipment Site Prep | FY27 NRM
VETERANS AFFAIRS, DEPARTMENT OF
Buffalo, NY
Source notice
The purpose of this project is to renovate two Cystoscopy rooms (214 and 215), Procedure Room (212), Procedure Room (211), Check-In area, Office, Control, Vestibule, Dressing, Toilet and Corridor. The two Cystoscopy rooms (214 and 215) will also receive new medical equipment. The Buffalo VAMC requires a Contractor to perform construction work necessary to accomplish this goal. The anticipated Construction Period of Performance is estimated to be 720 days. This effort intends to perform site preparation renovations to support the installation of new medical equipment. The Contractor shall prepare rooms 214 and 215 to receive new equipment.
A control room (215-1) is included and an electrical room (214-1) with new electrical panels and equipment is included in the design. In addition, Procedure Rooms 212 and 211, a stretch alcove, a check-in area, office, dressing area and restroom are included in this scope of work
Trades mentioned
These matches come from the notice title or scope. They do not establish separate subcontract packages or an invitation to bid.
Why these trades matched
- Electrical — notice scope: “t. A control room (215-1) is included and an electrical room (214-1) with new electrical panels and equipment is included in the d”
- Earthwork & site preparation — notice scope: “ be 720 days. This effort intends to perform site preparation renovations to support the installation of new medical equipment. The Cont”
- General construction — notice scope: “uffalo VAMC requires a Contractor to perform construction work necessary to accomplish this goal. The anticipated Construction Perio”
Requirements and eligibility
- Set-aside
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)Source listing
- NAICS
- 236220Source listing
- PSC
- Y1DASource listing
Review the complete solicitation for bonding, insurance, experience, licensing, registration and mandatory meetings. An item missing from this listing is not confirmation that the agency has no requirement.
Wages and labor
Check the solicitation for the applicable wage determination. A construction notice alone does not establish which federal or state wage requirements apply.
Documents and submission
Submit through the method specified by the agency. PWH does not accept bids. Check the official notice for the complete package and the latest addenda.
Open official noticeSource and dates
SAM.gov · Reference 36C24226B0065
Last collected Nov 18, 2026. Dates and requirements can change; verify the agency’s current notice before responding.