Skip to content

Home / Davis-Bacon changes / Rhode Island

Rhode Island Davis-Bacon wage determination changes, 2026

The U.S. Department of Labor published 6 modifications to 4 of Rhode Island's Davis-Bacon wage determinations between May 18, 2026 and October 1, 2026 that changed, added or removed a rate. Across them, 1 rates went up, 1 went down, 186 rows were added and 65 removed.

From every revision of each WD on SAM.gov, compared row by row (rate identifier and classification) and read twice. 4 of these modifications are dated May 18, 2026, when DOL reissued most WDs. Totals are base plus fringe. A contract keeps the modification in its bid documents, so a later one only reaches new bids. Rhode Island prevailing wage rates by county

Largest rate changes

The 20 biggest moves in the hourly total (base where the fringe isn't a dollar figure), one row per WD classification.

ClassificationWDBeforeAfterChange
CEMENT MASON/CONCRETE FINISHER (HEAVY AND HIGHWAY CONSTRUCTION)
Cement Mason · PLAS0040-002
RI20260001 mod 4, Jul 30, 2026
Providence, Newport, Washington and 2 more
$73.85$65.75−$8.10
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 5: Toxic waste remover
Laborer · LABO0271-002
RI20260001 mod 5, Oct 1, 2026
Providence, Newport, Washington and 2 more
$57.10$62.35+$5.25

Every modification, newest first

Each row links the new revision on SAM.gov; "before" links the one it replaced.

October 1, 2026 1 modification

WDConstructionCountiesUpDownAddedRemoved
RI20260001 mod 5 (before)
Largest: LABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 5: Toxic was +$5.25
building, highway and heavyProvidence, Newport, Washington and 2 more1

July 30, 2026 1 modification

WDConstructionCountiesUpDownAddedRemoved
RI20260001 mod 4 (before)
Largest: CEMENT MASON/CONCRETE FINISHER (HEAVY AND HIGHWAY CONSTRUCTI −$8.10
building, highway and heavyProvidence, Newport, Washington and 2 more16765

May 18, 2026 4 modifications

WDConstructionCountiesUpDownAddedRemoved
RI20260005 mod 2 (before)heavyProvidence, Newport, Washington and 2 more7
RI20260003 mod 2 (before)residentialNewport10
RI20260002 mod 2 (before)residentialProvidence, Washington, Bristol, Kent18
RI20260001 mod 3 (before)building, highway and heavyProvidence, Newport, Washington and 2 more84

Questions about Rhode Island's Davis-Bacon changes

How often do Davis-Bacon wage rates change in Rhode Island?

Whenever DOL modifies a wage determination. Between May 18, 2026 and October 1, 2026, DOL published 6 modifications to 4 Rhode Island wage determinations that changed, added or removed a rate; 4 of them are dated May 18, 2026, when DOL reissued most WDs.

Which Rhode Island Davis-Bacon rate changed the most in 2026?

CEMENT MASON/CONCRETE FINISHER (HEAVY AND HIGHWAY CONSTRUCTION) (cement mason) on RI20260001: $73.85 to $65.75 an hour in modification 4, published July 30, 2026, for building, highway and heavy construction.

Does a new modification change the rates on my contract?

A contract keeps the wage determination in its bid documents. Modifications published before bid opening apply to it, though one published less than 10 days before can be left out if the agency finds there isn't time to tell bidders (29 CFR 1.6(c)).

Where are the official Rhode Island wage determinations?

On SAM.gov. Each row on this page links the new revision there and the one it replaced, and every Rhode Island rate page names its WD and modification.

Davis-Bacon changes in every state · How we check · Report an error