Which Davis-Bacon wage determination applies?
The contracting agency picks the wage determinations and puts them in the bid documents: one for each area, and one for each construction type that makes up a substantial part of the job (29 CFR 1.6(b)). The modification that counts is generally the one current at contract award, with a 10-day cutoff before bid opening on sealed bids, and it then holds for the life of the contract. In Harris County, Texas, an electrician's minimum runs from $17.04 an hour (heavy) to $49.21 (building) depending on the type.
Checked on October 26, 2026 against eCFR (29 CFR 1.2, 1.3, 1.5 and 1.6), the 2023 final rule and the text of six SAM.gov determinations for Harris County, all at modification 1 of May 18, 2026. Published November 9, 2026.
What are building, residential, heavy and highway construction?
A type of construction is "the general category of construction, as established by the Administrator," and the types "may include, but are not limited to, building, residential, heavy, and highway" (29 CFR 1.2). The regulations don't define each type. DOL wrote in the 2023 rule that it "believes the definition of what falls under each type of construction is best addressed through subregulatory guidance," meaning All Agency Memorandum 130 from 1978, under which "apartment buildings of no more than four stories in height are classified as residential and apartment buildings of five or more stories are classified as building construction" (88 FR 57526).
The Harris County residential determination prints that line in its header: "RESIDENTIAL CONSTRUCTION PROJECTS (consisting of single family homes and apartments up to and including 4 stories)" (TX20260067).
Same county, four types: Harris County rates
Electrician and common laborer on each general determination for Harris County. Base + fringe, per hour.
| Type | Determination | Where the rates come from | Electrician | Common laborer |
|---|---|---|---|---|
| Building Harris County | TX20260253 mod 1 | Union (ELEC0716-005) / survey 2014 | $49.21 $38.50 + $10.71 | $11.76 $11.76 + $0.00 |
| Residential Harris County. Single family homes and apartments up to and including 4 stories | TX20260067 mod 1 | Survey, SUTX2005-030 12/15/2005 | $23.37 $17.05 + $6.32 | $9.98 $8.88 + $1.10 |
| Heavy Harris County. Excludes flood control | TX20260031 mod 1 | Survey, SUTX2005-019 10/01/1988 | $17.04 $17.00 + $0.04 | $8.94 $8.94 + $0.00 |
| Highway Harris and 12 other counties | TX20260299 mod 1 | State adopted, SATX2025-013 11/15/2023 | $31.46 $31.46 + $0.00 | $17.12 $17.12 + $0.00 |
Sources: SAM.gov determinations linked in the table. The building laborer rate is under SUTX2014-029 (survey completed 07/21/2014); the electrician's under the union identifier ELEC0716-005.
The spread comes from where each set of rates came from. The building electrician is a union rate, with the negotiated rate effective September 1, 2025. The residential and heavy rates are survey rates under identifiers dated December 15, 2005 and October 1, 1988, and the highway rates were adopted from the state under SATX2025-013. Data from federal and federally assisted projects is left out of building and residential surveys when there's enough other data, but "will be used in compiling wage rate data for heavy and highway wage determinations" (29 CFR 1.3(d)).
Several of the older rates sit below $13.65, the Executive Order 13658 minimum printed on each determination for contracts that order covers. The full set for each trade is on the Harris County page, for example the electrician and laborer rates.
What about specialty work and mixed jobs?
Some determinations cover a narrower kind of work. In Harris County, the heavy determination says "Excludes Flood Control," and flood control has its own, TX20260034, for Harris and seven other counties, "Flood Control Projects Only." Its common laborer is $15.63, against $8.94 on the general heavy determination. Dredging along the Gulf Coast has another, TX20260033.
When a job mixes types, "the solicitation and contract must incorporate the applicable wage determination for each type of construction involved that is anticipated to be substantial," and "the contracting agency is responsible for designating the specific work to which each incorporated wage determination applies" (29 CFR 1.6(b)(1)). A road contract that also includes a substantial amount of building work would carry both the highway and building determinations, with the contract saying which work falls under each.
Which county's determination applies?
The area is normally the county where the work is done (29 CFR 1.2). A contract spanning counties must incorporate "the applicable wage determination for each area" unless the agency gets a multi-county project wage determination (29 CFR 1.6(b)(1)). Highway areas can be larger: "For highway projects, the area may be State department of transportation highway districts or other similar State geographic subdivisions." Harris County's highway determination covers 13 counties, from Austin and Brazoria to San Jacinto and Waller (TX20260299).
Where no general determination fits, the agency can request a project wage determination on form SF-308 and "should anticipate that such processing by the Department of Labor will take at least 30 days" (29 CFR 1.5(b)). A project determination "will be effective for 180 calendar days" unless it's incorporated into a contract.
Which modification applies to your contract?
29 CFR 1.6(c)(2). "Issued" means the date the revision is published on SAM.gov.
| When the modification is published | Does it apply? |
|---|---|
| Before contract award (or start of construction with no award) | Yes, with the sealed-bid exception below |
| Sealed bids: at least 10 days before bid opening | Yes |
| Sealed bids: less than 10 days before bid opening | Yes, unless the agency finds "there is not a reasonable time still available before bid opening to notify bidders" and files a report |
| Sealed bids: after bid opening, but award takes more than 90 days | Yes, unless the agency gets an extension from DOL |
| After award | No, except when the contract is changed to add substantial work, an option extends its term, or it is an open-ended contract updated on each anniversary of award |
Once in the contract, "the wage determination generally applies for the duration of the contract or project" (29 CFR 1.6(a)(1)). In Harris County, modification 1 of all four general determinations was published on May 18, 2026. A sealed-bid job whose bids opened at least 10 days later uses modification 1. One whose bids opened within those 10 days uses it too, unless the agency made the finding. The Texas change log lists each 2026 modification by date.
If the wrong determination ends up in a contract, the agency has to add the right one, and "the incorporation of the correct wage determination(s) must be retroactive to the date of contract award or start of construction if there is no award," unless the Administrator directs otherwise (29 CFR 1.6(f)(3)(i)). The contractor still "has an affirmative obligation to ensure that its pay practices are in compliance" (1.6(b)(2)).
Next steps
- Read the determination you've got: how to read a Davis-Bacon wage determination.
- See every Harris County determination by trade: Harris County, or pick a county from any state.
- Put every trade on the bid on one sheet: the rate sheet.
Quick answers
Who decides which Davis-Bacon wage determination applies?
The contracting agency. It makes the initial determination and puts the right wage determinations in the bid documents and contract (29 CFR 1.6(b)(1)). Questions about which applies go to the Wage and Hour Administrator.
Which modification of a wage determination applies to my contract?
Generally the one current at contract award. On sealed bids, a modification published at least 10 days before bid opening applies; one published closer can still apply unless the agency finds there's no reasonable time to notify bidders. Modifications published after award don't apply unless the contract is extended or its scope grows (29 CFR 1.6(c)).
Is a 5-story apartment building residential or building construction?
Building. Under DOL's All Agency Memorandum 130, as the 2023 final rule describes it, apartment buildings of four stories or less are residential and those of five or more are building construction.