Home / Indiana / Pike County / Painter
Pike County, IN · Painter
Painter prevailing wage in Pike County, Indiana
$49.69an hour, base + fringe
$30.37 wage + $19.32 fringe benefits · Building · PAIN0156-013
Pike County uses the same painter rates as 1 other county. See all of them on one page.
On federally funded or assisted building construction in Pike County, a painter must be paid at least $49.69 an hour: a $30.37 base wage plus $19.32 in fringe benefits, under wage determination IN20260014 (modification 2). DOL prints no total, so $49.69 is our sum of the two. The WD's footnote adds a benefit this total leaves out, so treat it as a floor.
Wage determination IN20260014, modification 2, published May 18, 2026, for building construction; rate identifier PAIN0156-013 (April 1, 2024). Checked against sam.gov on October 25, 2026.
Davis-Bacon is the only prevailing wage here (federally funded or assisted work). Indiana repealed its Common Construction Wage Act effective July 1, 2015, and IC 5-16-7.2-5 bars public agencies from setting wage scales (Indiana DOL).
DOL lists 12 painter rates for Pike County, from $12.00 to $53.32 an hour. See all of them.
- The footnote for this classification adds a dollar amount that the total here leaves out; read it on the WD.
Base wage and fringe benefits: $30.37 + $19.32
The base wage is the taxable hourly wage. DOL prints the fringe benefits as one hourly figure, not itemized; it can go to health, pension, vacation and training plans, or be paid as cash where the state allows.
| Base wage (taxable) | $30.37 |
| Fringe benefits (one figure, not itemized) | $19.32 |
| Base + fringe benefits (our sum; DOL prints no total) | $49.69 |
When this rate changes
- A contract keeps the wage determination in its bid documents. Modifications published before bid opening apply to it, though one published less than 10 days before can be left out if the agency finds there isn't time to tell bidders (29 CFR 1.6(c)).
- DOL changes a WD by publishing a numbered modification on SAM.gov. This page reads the modification named in the Source line; the Indiana change log lists what each one changed.
Every painter rate in Pike County
As DOL lists them. The highlighted row is the one this page leads with.
- PAINTERS:: SPRAY OF MASTICS CREOSOTES, KWINCH KOATE, COAL TAR EPOXY (DAVIESS, DUBOIS, GIBZSON, KNOX, PERRY, PIKE, POSSEY, SPENCER, VANDERBURGH, AND WARRICK COUNTIES) FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGEHighway, Heavy · PAIN0156-001$53.32
- PAINTERS:: SPRAY, SANDBLAST, POWER TOOLS, WATERBLAST & STEAM CLEANING (DAVIESS, DUBOIS, GIBZSON, KNOX, PERRY, PIKE, POSSEY, SPENCER, VANDERBURGH, AND WARRICK COUNTIES) FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGEHighway, Heavy · PAIN0156-001$53.32
- PAINTERS: DRYWALL FINISHERS (DAVIESS, DUBOIS, GIBZSON, KNOX, PERRY, PIKE, POSSEY, SPENCER, VANDERBURGH, AND WARRICK COUNTIES) FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGEHighway, Heavy · PAIN0156-001$53.07
- PAINTERS: BRUSH & ROLLER (DAVIESS, DUBOIS, GIBZSON, KNOX, PERRY, PIKE, POSSEY, SPENCER, VANDERBURGH, AND WARRICK COUNTIES) FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGEHighway, Heavy · PAIN0156-001$52.32
- PAINTERS: BRUSH & ROLLER OF MASTICS, CREOSOTES, KEWINCH KOATE, & COAL TAR EPOXY (DAVIESS, DUBOIS, GIBZSON, KNOX, PERRY, PIKE, POSSEY, SPENCER, VANDERBURGH, AND WARRICK COUNTIES) FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGEHighway, Heavy · PAIN0156-001$52.32
- PAINTERS: SPRAY FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGEBuilding · PAIN0156-013$49.94
- PAINTERS: DRYWALL FINISHERS FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGEBuilding · PAIN0156-013$49.69
- PAINTER BRUSH, ROLLER (NON-BRIDGE WORK)Highway, Heavy · PAIN0047-005$47.91
- PAINTER SPRAY AND SAND-BLASTING (NON-BRIDGE WORK)Highway, Heavy · PAIN0047-005$46.41
- PAINTER: SPRAYResidential · SUIN2012-007$12.00
- PAINTER: ROLLERResidential · SUIN2012-007$12.00
- PAINTER: BRUSH ONLYResidential · SUIN2012-007$12.00
| Classification | Base + fringe | Base | Fringe benefits | WD |
|---|---|---|---|---|
| PAINTERS: SPRAY FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGEBuildingPAIN0156-013 | $49.94 | $30.62 | $19.32 | IN20260014 Mod 2 |
| PAINTERS: DRYWALL FINISHERS FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGEBuildingPAIN0156-013 | $49.69 | $30.37 | $19.32 | IN20260014 Mod 2 |
| PAINTER BRUSH, ROLLER (NON-BRIDGE WORK)Highway, HeavyPAIN0047-005 | $47.91 | $31.02 | $16.89 | IN20260006 Mod 3 |
| PAINTER SPRAY AND SAND-BLASTING (NON-BRIDGE WORK)Highway, HeavyPAIN0047-005 | $46.41 | $30.52 | $15.89 | IN20260006 Mod 3 |
| PAINTERS: BRUSH & ROLLER (DAVIESS, DUBOIS, GIBZSON, KNOX, PERRY, PIKE, POSSEY, SPENCER, VANDERBURGH, AND WARRICK COUNTIES) FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGEHighway, HeavyPAIN0156-001 | $52.32 | $31.12 | $21.20 | IN20260006 Mod 3 |
| PAINTERS: BRUSH & ROLLER OF MASTICS, CREOSOTES, KEWINCH KOATE, & COAL TAR EPOXY (DAVIESS, DUBOIS, GIBZSON, KNOX, PERRY, PIKE, POSSEY, SPENCER, VANDERBURGH, AND WARRICK COUNTIES) FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGEHighway, HeavyPAIN0156-001 | $52.32 | $31.12 | $21.20 | IN20260006 Mod 3 |
| PAINTERS: DRYWALL FINISHERS (DAVIESS, DUBOIS, GIBZSON, KNOX, PERRY, PIKE, POSSEY, SPENCER, VANDERBURGH, AND WARRICK COUNTIES) FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGEHighway, HeavyPAIN0156-001 | $53.07 | $31.87 | $21.20 | IN20260006 Mod 3 |
| PAINTERS:: SPRAY OF MASTICS CREOSOTES, KWINCH KOATE, COAL TAR EPOXY (DAVIESS, DUBOIS, GIBZSON, KNOX, PERRY, PIKE, POSSEY, SPENCER, VANDERBURGH, AND WARRICK COUNTIES) FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGEHighway, HeavyPAIN0156-001 | $53.32 | $32.12 | $21.20 | IN20260006 Mod 3 |
| PAINTERS:: SPRAY, SANDBLAST, POWER TOOLS, WATERBLAST & STEAM CLEANING (DAVIESS, DUBOIS, GIBZSON, KNOX, PERRY, PIKE, POSSEY, SPENCER, VANDERBURGH, AND WARRICK COUNTIES) FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGEHighway, HeavyPAIN0156-001 | $53.32 | $32.12 | $21.20 | IN20260006 Mod 3 |
| PAINTER: SPRAYResidentialSUIN2012-007 | $12.00 | $12.00 | $0.00 | IN20260022 Mod 1 |
| PAINTER: ROLLERResidentialSUIN2012-007 | $12.00 | $12.00 | $0.00 | IN20260022 Mod 1 |
| PAINTER: BRUSH ONLYResidentialSUIN2012-007 | $12.00 | $12.00 | $0.00 | IN20260022 Mod 1 |
How Pike County compares
The main painter rate in every county that has one, and how the pay splits here and nearby. All bars use the same scale.
Every county in Indiana
Wage and fringe benefits, nearby
- Pike Countybase $30.37$49.69
- Dubois Countybase $30.37$49.69
- Gibson Countybase $31.12$52.32
- Warrick Countybase $31.12$52.32
Painter rates in nearby counties
Current DOL rates. Davis-Bacon rates are set for groups of counties, so neighbours often share them; the county where the work is done decides.
DOL's painter rates for Pike County are the same as in 1 other county: Dubois.
| County | Classification | Base + fringe | Base | vs Pike County |
|---|---|---|---|---|
| Gibson County | PAINTERS: BRUSH & ROLLER (GIBSON, POSEY, VANDERBURGH AND WARRICK COUNTIES) FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGE | $52.32 | $31.12 | +$2.63 |
| Warrick County | PAINTERS: BRUSH & ROLLER (GIBSON, POSEY, VANDERBURGH AND WARRICK COUNTIES) FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGE | $52.32 | $31.12 | +$2.63 |
| Knox County | PAINTERS: BRUSH, ROLLER & PAPERHANGERS FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGE | $52.32 | $31.12 | +$2.63 |
| Daviess County | PAINTER (DAVIESS COUNTY) FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGE | $52.32 | $31.12 | +$2.63 |
| Spencer County | PAINTER: SPRAY FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGE | $49.94 | $30.62 | +$0.25 |
| Pike County | PAINTERS: DRYWALL FINISHERS FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGE | $49.69 | $30.37 | |
| Dubois County | PAINTERS: DRYWALL FINISHERS FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGE | $49.69 | $30.37 | same |
Notes on this rate
DOL's notes, in DOL's words.
- FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGE
More from DOL on this rate
- DOL wage determination
- SAM.gov wage determinations
- Davis-Bacon determinations list journeyworker rates. Apprentices in a program registered with DOL or a recognized state agency can be paid the program's percentage of the rate, within its ratio; anyone else gets the full rate (29 CFR 5.5(a)(4)).
Are you being paid this rate?
Add your base pay to the fringe your employer pays for you, in cash or into plans, and compare the sum with the total. The Department of Labor's Wage and Hour Division takes complaints: 1-866-487-9243, or dol.gov/agencies/whd/contact/complaints.
Source
U.S. Department of Labor, Wage and Hour Division (DOL), wage determination IN20260014 Mod 2, published May 18, 2026: sam.gov/wage-determination/IN20260014/2
We read every active Indiana Davis-Bacon wage determination from SAM.gov's own data and check every number with a second, independent read of the same file. DOL prints no total; ours is base plus fringe. How we check · Download Pike County as CSV · Report an error