Home / Ohio / Geauga County / Painter
Geauga County, OH · Painter
Painter prevailing wage in Geauga County, Ohio
$51.80an hour, base + fringe
$32.35 wage + $19.45 fringe benefits · Building · PAIN0707-002
On federally funded or assisted building construction in Geauga County, a painter must be paid at least $51.80 an hour: a $32.35 base wage plus $19.45 in fringe benefits, under wage determination OH20260080 (modification 1). DOL prints no total, so $51.80 is our sum of the two.
Wage determination OH20260080, modification 1, published May 18, 2026, for building construction; rate identifier PAIN0707-002 (May 1, 2024). Checked against sam.gov on October 25, 2026.
Ohio also sets its own rates (ORC 4115, Department of Commerce); on jobs covered by both, pay the higher. Ohio's rates sit behind an OHID login on its prevailing wage portal, so this site shows the Davis-Bacon rates only.
DOL lists 21 painter rates for Geauga County, from $24.11 to $58.54 an hour. See all of them.
Base wage and fringe benefits: $32.35 + $19.45
The base wage is the taxable hourly wage. DOL prints the fringe benefits as one hourly figure, not itemized; it can go to health, pension, vacation and training plans, or be paid as cash where the state allows.
| Base wage (taxable) | $32.35 |
| Fringe benefits (one figure, not itemized) | $19.45 |
| Base + fringe benefits (our sum; DOL prints no total) | $51.80 |
When this rate changes
- A contract keeps the wage determination in its bid documents. Modifications published before bid opening apply to it, though one published less than 10 days before can be left out if the agency finds there isn't time to tell bidders (29 CFR 1.6(c)).
- DOL changes a WD by publishing a numbered modification on SAM.gov. This page reads the modification named in the Source line; the Ohio change log lists what each one changed.
Every painter rate in Geauga County
As DOL lists them. The highlighted row is the one this page leads with.
- PAINTER: NEW COMMERCIAL WORK: GROUP 2- REFINERIES & REFINERY TANKS; SURFACES 30 FT. OR OVER WHERE MATERIAL IS APPLIED TO OR LABOR PERFORMED ON ABOVE GROUND LEVEL (EXTERIOR), FLOOR LEVEL (INTERIOR) (REPAINT IS 90% OF GROUP RATE) (FULTON, HENRY, LUCAS, OTTAWA (EXCLUDING ALLEN, BAY, BONO, CATAWBA ISLAND, CLAY CENTER, CURTICE, DANBURY, EAGLE BEACH, ELLISTON, ELMORE, ERIE, FISHBACK, GEM BEACH, & GENOVA) & WOOD COUNTIES)Highway, Heavy · PAIN0007-002$58.54
- PAINTER: NEW COMMERCIAL WORK: GROUP 3- SWING STAGE & CHAIR (REPAINT IS 90% OF GROUP RATE) (FULTON, HENRY, LUCAS, OTTAWA (EXCLUDING ALLEN, BAY, BONO, CATAWBA ISLAND, CLAY CENTER, CURTICE, DANBURY, EAGLE BEACH, ELLISTON, ELMORE, ERIE, FISHBACK, GEM BEACH, & GENOVA) & WOOD COUNTIES)Highway, Heavy · PAIN0007-002$58.54
- PAINTER: NEW COMMERCIAL WORK: GROUP 4- LEAD ABATEMENT (REPAINT IS 90% OF GROUP RATE) (FULTON, HENRY, LUCAS, OTTAWA (EXCLUDING ALLEN, BAY, BONO, CATAWBA ISLAND, CLAY CENTER, CURTICE, DANBURY, EAGLE BEACH, ELLISTON, ELMORE, ERIE, FISHBACK, GEM BEACH, & GENOVA) & WOOD COUNTIES)Highway, Heavy · PAIN0007-002$58.54
- PAINTER: NEW COMMERCIAL WORK: GROUP 5- ALL METHODS OF SPRAY (REPAINT IS 90% OF GROUP RATE) (FULTON, HENRY, LUCAS, OTTAWA (EXCLUDING ALLEN, BAY, BONO, CATAWBA ISLAND, CLAY CENTER, CURTICE, DANBURY, EAGLE BEACH, ELLISTON, ELMORE, ERIE, FISHBACK, GEM BEACH, & GENOVA) & WOOD COUNTIES)Highway, Heavy · PAIN0007-002$58.54
- PAINTER: NEW COMMERCIAL WORK: GROUP 6- SOLVENT-BASED CATALIZED EPOXY MATERIALS OF 2 OR MORE COMPONENT MATERIALS, TO INCLUDE SOLVENT-BASED CONVERSION VARNISH (EXCLUDING WATER BASED) (REPAINT IS 90% OF GROUP RATE) (FULTON, HENRY, LUCAS, OTTAWA (EXCLUDING ALLEN, BAY, BONO, CATAWBA ISLAND, CLAY CENTER, CURTICE, DANBURY, EAGLE BEACH, ELLISTON, ELMORE, ERIE, FISHBACK, GEM BEACH, & GENOVA) & WOOD COUNTIES)Highway, Heavy · PAIN0007-002$58.54
- PAINTER: NEW COMMERCIAL WORK: GROUP 7- SPRAY SOLVENT BASED MATERIAL; SAND & ABRASIVE BLASTING (REPAINT IS 90% OF GROUP RATE) (FULTON, HENRY, LUCAS, OTTAWA (EXCLUDING ALLEN, BAY, BONO, CATAWBA ISLAND, CLAY CENTER, CURTICE, DANBURY, EAGLE BEACH, ELLISTON, ELMORE, ERIE, FISHBACK, GEM BEACH, & GENOVA) & WOOD COUNTIES)Highway, Heavy · PAIN0007-002$58.54
- PAINTER: NEW COMMERCIAL WORK: GROUP 8- TOWERS; TANKS; BRIDGES; STACKS OVER 30 FEET (REPAINT IS 90% OF GROUP RATE) (FULTON, HENRY, LUCAS, OTTAWA (EXCLUDING ALLEN, BAY, BONO, CATAWBA ISLAND, CLAY CENTER, CURTICE, DANBURY, EAGLE BEACH, ELLISTON, ELMORE, ERIE, FISHBACK, GEM BEACH, & GENOVA) & WOOD COUNTIES)Highway, Heavy · PAIN0007-002$58.54
- PAINTER: NEW COMMERCIAL WORK: GROUP 9- EPOXY SPRAY (EXCLUDING WATER BASED) (REPAINT IS 90% OF GROUP RATE) (FULTON, HENRY, LUCAS, OTTAWA (EXCLUDING ALLEN, BAY, BONO, CATAWBA ISLAND, CLAY CENTER, CURTICE, DANBURY, EAGLE BEACH, ELLISTON, ELMORE, ERIE, FISHBACK, GEM BEACH, & GENOVA) & WOOD COUNTIES)Highway, Heavy · PAIN0007-002$58.54
- PAINTER: NEW COMMERCIAL WORK: GROUP 1- BRUSH; SPRAY & SANDBLASTING POT TENDER. (REPAINT IS 90% OF GROUP RATE) (FULTON, HENRY, LUCAS, OTTAWA (EXCLUDING ALLEN, BAY, BONO, CATAWBA ISLAND, CLAY CENTER, CURTICE, DANBURY, EAGLE BEACH, ELLISTON, ELMORE, ERIE, FISHBACK, GEM BEACH, & GENOVA) & WOOD COUNTIES)Highway, Heavy · PAIN0007-002$57.54
- PAINTER- COMMERCIAL NEW WORK; REMODELING; & RENOVATIONS: GROUP 4- BRIDGE BLASTER (ASHTABULA, CUYAHOGA, GEAUGA, LAKE, LORAIN, PORTAGE (N. OF THE EAST-WEST TURNPIKE) & SUMMIT (N. OF THE EAST-WEST TURNPIKE))Highway, Heavy · PAIN0006-002$55.96
- PAINTER: BRUSH AND ROLLERResidential · PAIN0707-001$54.15
- PAINTER: BRUSH AND ROLLERBuilding · PAIN0707-002$51.80
- PAINTER- COMMERCIAL NEW WORK; REMODELING; & RENOVATIONS: GROUP 3- SPRAY PAINTING; CLOSED STEEL ABOVE 55 FEET; BRIDGES & OPEN STRUCTURAL STEEL; TANKS - WATER TOWERS; BRIDGE PAINTERS; BRIDGE RIGGERS; CONTAINMENT BUILDERS (ASHTABULA, CUYAHOGA, GEAUGA, LAKE, LORAIN, PORTAGE (N. OF THE EAST-WEST TURNPIKE) & SUMMIT (N. OF THE EAST-WEST TURNPIKE))Highway, Heavy · PAIN0006-002$50.40
- PAINTER- COMMERCIAL NEW WORK; REMODELING; & RENOVATIONS: GROUP 2- SANDBLASTING & BUFFING (ASHTABULA, CUYAHOGA, GEAUGA, LAKE, LORAIN, PORTAGE (N. OF THE EAST-WEST TURNPIKE) & SUMMIT (N. OF THE EAST-WEST TURNPIKE))Highway, Heavy · PAIN0006-002$50.10
- PAINTER- COMMERCIAL NEW WORK; REMODELING; & RENOVATIONS: GROUP 1- BRUSH; & ROLLER (ASHTABULA, CUYAHOGA, GEAUGA, LAKE, LORAIN, PORTAGE (N. OF THE EAST-WEST TURNPIKE) & SUMMIT (N. OF THE EAST-WEST TURNPIKE))Highway, Heavy · PAIN0006-002$49.70
- PAINTER: GROUP 4- SPRAY, EXCEPT BAR JOIST/DECK (COLUMBIANA, MAHONING, AND TRUMBULL COUNITES)Highway, Heavy · PAIN0476-001$49.50
- PAINTER- COMMERCIAL REPAINT GROUP 3- SPRAY PAINTINGHighway, Heavy · PAIN0006-002$48.90
- PAINTER- COMMERCIAL REPAINT GROUP 2- SANDBLASTING & BUFFING (ASHTABULA, CUYAHOGA, GEAUGA, LAKE, LORAIN, PORTAGE (N. OF THE EAST-WEST TURNPIKE) & SUMMIT (N. OF THE EAST-WEST TURNPIKE))Highway, Heavy · PAIN0006-002$48.60
- PAINTER- COMMERCIAL REPAINT GROUP 1- BRUSH; & ROLLER (ASHTABULA, CUYAHOGA, GEAUGA, LAKE, LORAIN, PORTAGE (N. OF THE EAST-WEST TURNPIKE) & SUMMIT (N. OF THE EAST-WEST TURNPIKE))Highway, Heavy · PAIN0006-002$48.20
- PAINTER: SPRAYBuilding · SUOH2012-082$35.18
- SIGN PAINTER & ERECTORHighway, Heavy · PAIN0639-001$24.11
| Classification | Base + fringe | Base | Fringe benefits | WD |
|---|---|---|---|---|
| PAINTER: BRUSH AND ROLLERBuildingPAIN0707-002 | $51.80 | $32.35 | $19.45 | OH20260080 Mod 1 |
| PAINTER: SPRAYBuildingSUOH2012-082 | $35.18 | $22.78 | $12.40 | OH20260080 Mod 1 |
| PAINTER- COMMERCIAL NEW WORK; REMODELING; & RENOVATIONS: GROUP 1- BRUSH; & ROLLER (ASHTABULA, CUYAHOGA, GEAUGA, LAKE, LORAIN, PORTAGE (N. OF THE EAST-WEST TURNPIKE) & SUMMIT (N. OF THE EAST-WEST TURNPIKE))Highway, HeavyPAIN0006-002 | $49.70 | $30.75 | $18.95 | OH20260001 Mod 5 |
| PAINTER- COMMERCIAL NEW WORK; REMODELING; & RENOVATIONS: GROUP 2- SANDBLASTING & BUFFING (ASHTABULA, CUYAHOGA, GEAUGA, LAKE, LORAIN, PORTAGE (N. OF THE EAST-WEST TURNPIKE) & SUMMIT (N. OF THE EAST-WEST TURNPIKE))Highway, HeavyPAIN0006-002 | $50.10 | $31.15 | $18.95 | OH20260001 Mod 5 |
| PAINTER- COMMERCIAL NEW WORK; REMODELING; & RENOVATIONS: GROUP 3- SPRAY PAINTING; CLOSED STEEL ABOVE 55 FEET; BRIDGES & OPEN STRUCTURAL STEEL; TANKS - WATER TOWERS; BRIDGE PAINTERS; BRIDGE RIGGERS; CONTAINMENT BUILDERS (ASHTABULA, CUYAHOGA, GEAUGA, LAKE, LORAIN, PORTAGE (N. OF THE EAST-WEST TURNPIKE) & SUMMIT (N. OF THE EAST-WEST TURNPIKE))Highway, HeavyPAIN0006-002 | $50.40 | $31.45 | $18.95 | OH20260001 Mod 5 |
| PAINTER- COMMERCIAL NEW WORK; REMODELING; & RENOVATIONS: GROUP 4- BRIDGE BLASTER (ASHTABULA, CUYAHOGA, GEAUGA, LAKE, LORAIN, PORTAGE (N. OF THE EAST-WEST TURNPIKE) & SUMMIT (N. OF THE EAST-WEST TURNPIKE))Highway, HeavyPAIN0006-002 | $55.96 | $37.01 | $18.95 | OH20260001 Mod 5 |
| PAINTER- COMMERCIAL REPAINT GROUP 1- BRUSH; & ROLLER (ASHTABULA, CUYAHOGA, GEAUGA, LAKE, LORAIN, PORTAGE (N. OF THE EAST-WEST TURNPIKE) & SUMMIT (N. OF THE EAST-WEST TURNPIKE))Highway, HeavyPAIN0006-002 | $48.20 | $29.25 | $18.95 | OH20260001 Mod 5 |
| PAINTER- COMMERCIAL REPAINT GROUP 2- SANDBLASTING & BUFFING (ASHTABULA, CUYAHOGA, GEAUGA, LAKE, LORAIN, PORTAGE (N. OF THE EAST-WEST TURNPIKE) & SUMMIT (N. OF THE EAST-WEST TURNPIKE))Highway, HeavyPAIN0006-002 | $48.60 | $29.65 | $18.95 | OH20260001 Mod 5 |
| PAINTER- COMMERCIAL REPAINT GROUP 3- SPRAY PAINTINGHighway, HeavyPAIN0006-002 | $48.90 | $29.95 | $18.95 | OH20260001 Mod 5 |
| PAINTER: NEW COMMERCIAL WORK: GROUP 1- BRUSH; SPRAY & SANDBLASTING POT TENDER. (REPAINT IS 90% OF GROUP RATE) (FULTON, HENRY, LUCAS, OTTAWA (EXCLUDING ALLEN, BAY, BONO, CATAWBA ISLAND, CLAY CENTER, CURTICE, DANBURY, EAGLE BEACH, ELLISTON, ELMORE, ERIE, FISHBACK, GEM BEACH, & GENOVA) & WOOD COUNTIES)Highway, HeavyPAIN0007-002 | $57.54 | $33.66 | $23.88 | OH20260001 Mod 5 |
| PAINTER: NEW COMMERCIAL WORK: GROUP 2- REFINERIES & REFINERY TANKS; SURFACES 30 FT. OR OVER WHERE MATERIAL IS APPLIED TO OR LABOR PERFORMED ON ABOVE GROUND LEVEL (EXTERIOR), FLOOR LEVEL (INTERIOR) (REPAINT IS 90% OF GROUP RATE) (FULTON, HENRY, LUCAS, OTTAWA (EXCLUDING ALLEN, BAY, BONO, CATAWBA ISLAND, CLAY CENTER, CURTICE, DANBURY, EAGLE BEACH, ELLISTON, ELMORE, ERIE, FISHBACK, GEM BEACH, & GENOVA) & WOOD COUNTIES)Highway, HeavyPAIN0007-002 | $58.54 | $34.66 | $23.88 | OH20260001 Mod 5 |
| PAINTER: NEW COMMERCIAL WORK: GROUP 3- SWING STAGE & CHAIR (REPAINT IS 90% OF GROUP RATE) (FULTON, HENRY, LUCAS, OTTAWA (EXCLUDING ALLEN, BAY, BONO, CATAWBA ISLAND, CLAY CENTER, CURTICE, DANBURY, EAGLE BEACH, ELLISTON, ELMORE, ERIE, FISHBACK, GEM BEACH, & GENOVA) & WOOD COUNTIES)Highway, HeavyPAIN0007-002 | $58.54 | $34.66 | $23.88 | OH20260001 Mod 5 |
| PAINTER: NEW COMMERCIAL WORK: GROUP 4- LEAD ABATEMENT (REPAINT IS 90% OF GROUP RATE) (FULTON, HENRY, LUCAS, OTTAWA (EXCLUDING ALLEN, BAY, BONO, CATAWBA ISLAND, CLAY CENTER, CURTICE, DANBURY, EAGLE BEACH, ELLISTON, ELMORE, ERIE, FISHBACK, GEM BEACH, & GENOVA) & WOOD COUNTIES)Highway, HeavyPAIN0007-002 | $58.54 | $34.66 | $23.88 | OH20260001 Mod 5 |
| PAINTER: NEW COMMERCIAL WORK: GROUP 5- ALL METHODS OF SPRAY (REPAINT IS 90% OF GROUP RATE) (FULTON, HENRY, LUCAS, OTTAWA (EXCLUDING ALLEN, BAY, BONO, CATAWBA ISLAND, CLAY CENTER, CURTICE, DANBURY, EAGLE BEACH, ELLISTON, ELMORE, ERIE, FISHBACK, GEM BEACH, & GENOVA) & WOOD COUNTIES)Highway, HeavyPAIN0007-002 | $58.54 | $34.66 | $23.88 | OH20260001 Mod 5 |
| PAINTER: NEW COMMERCIAL WORK: GROUP 6- SOLVENT-BASED CATALIZED EPOXY MATERIALS OF 2 OR MORE COMPONENT MATERIALS, TO INCLUDE SOLVENT-BASED CONVERSION VARNISH (EXCLUDING WATER BASED) (REPAINT IS 90% OF GROUP RATE) (FULTON, HENRY, LUCAS, OTTAWA (EXCLUDING ALLEN, BAY, BONO, CATAWBA ISLAND, CLAY CENTER, CURTICE, DANBURY, EAGLE BEACH, ELLISTON, ELMORE, ERIE, FISHBACK, GEM BEACH, & GENOVA) & WOOD COUNTIES)Highway, HeavyPAIN0007-002 | $58.54 | $34.66 | $23.88 | OH20260001 Mod 5 |
| PAINTER: NEW COMMERCIAL WORK: GROUP 7- SPRAY SOLVENT BASED MATERIAL; SAND & ABRASIVE BLASTING (REPAINT IS 90% OF GROUP RATE) (FULTON, HENRY, LUCAS, OTTAWA (EXCLUDING ALLEN, BAY, BONO, CATAWBA ISLAND, CLAY CENTER, CURTICE, DANBURY, EAGLE BEACH, ELLISTON, ELMORE, ERIE, FISHBACK, GEM BEACH, & GENOVA) & WOOD COUNTIES)Highway, HeavyPAIN0007-002 | $58.54 | $34.66 | $23.88 | OH20260001 Mod 5 |
| PAINTER: NEW COMMERCIAL WORK: GROUP 8- TOWERS; TANKS; BRIDGES; STACKS OVER 30 FEET (REPAINT IS 90% OF GROUP RATE) (FULTON, HENRY, LUCAS, OTTAWA (EXCLUDING ALLEN, BAY, BONO, CATAWBA ISLAND, CLAY CENTER, CURTICE, DANBURY, EAGLE BEACH, ELLISTON, ELMORE, ERIE, FISHBACK, GEM BEACH, & GENOVA) & WOOD COUNTIES)Highway, HeavyPAIN0007-002 | $58.54 | $34.66 | $23.88 | OH20260001 Mod 5 |
| PAINTER: NEW COMMERCIAL WORK: GROUP 9- EPOXY SPRAY (EXCLUDING WATER BASED) (REPAINT IS 90% OF GROUP RATE) (FULTON, HENRY, LUCAS, OTTAWA (EXCLUDING ALLEN, BAY, BONO, CATAWBA ISLAND, CLAY CENTER, CURTICE, DANBURY, EAGLE BEACH, ELLISTON, ELMORE, ERIE, FISHBACK, GEM BEACH, & GENOVA) & WOOD COUNTIES)Highway, HeavyPAIN0007-002 | $58.54 | $34.66 | $23.88 | OH20260001 Mod 5 |
| PAINTER: GROUP 4- SPRAY, EXCEPT BAR JOIST/DECK (COLUMBIANA, MAHONING, AND TRUMBULL COUNITES)Highway, HeavyPAIN0476-001 | $49.50 | $31.14 | $18.36 | OH20260001 Mod 5 |
| SIGN PAINTER & ERECTORHighway, HeavyPAIN0639-001 | $24.11 | $20.61 | $3.50 | OH20260001 Mod 5 |
| PAINTER: BRUSH AND ROLLERResidentialPAIN0707-001 | $54.15 | $33.95 | $20.20 | OH20260024 Mod 1 |
How Geauga County compares
The main painter rate in every county that has one, and how the pay splits here and nearby. All bars use the same scale.
Every county in Ohio
Wage and fringe benefits, nearby
- Geauga Countybase $32.35$51.80
- Lake Countybase $32.35$51.80
- Portage Countybase $21.55$23.76
- Trumbull Countybase $20.52$30.58
Painter rates in nearby counties
Current DOL rates. Davis-Bacon rates are set for groups of counties, so neighbours often share them; the county where the work is done decides.
| County | Classification | Base + fringe | Base | vs Geauga County |
|---|---|---|---|---|
| Geauga County | PAINTER: BRUSH AND ROLLER | $51.80 | $32.35 | |
| Lake County | PAINTER: BRUSH AND ROLLER | $51.80 | $32.35 | same |
| Cuyahoga County | PAINTER: BRUSH AND ROLLER | $51.80 | $32.35 | same |
| Ashtabula County | PAINTER (BRUSH AND ROLLER) | $31.40 | $20.91 | −$20.40 |
| Trumbull County | PAINTER (BRUSH AND ROLLER) | $30.58 | $20.52 | −$21.22 |
| Portage County | PAINTER (BRUSH AND ROLLER) | $23.76 | $21.55 | −$28.04 |
| Summit County | PAINTER (BRUSH AND ROLLER) | $22.43 | $20.55 | −$29.37 |
More from DOL on this rate
- DOL wage determination
- SAM.gov wage determinations
- Davis-Bacon determinations list journeyworker rates. Apprentices in a program registered with DOL or a recognized state agency can be paid the program's percentage of the rate, within its ratio; anyone else gets the full rate (29 CFR 5.5(a)(4)).
Are you being paid this rate?
Add your base pay to the fringe your employer pays for you, in cash or into plans, and compare the sum with the total. The Department of Labor's Wage and Hour Division takes complaints: 1-866-487-9243, or dol.gov/agencies/whd/contact/complaints.
Source
U.S. Department of Labor, Wage and Hour Division (DOL), wage determination OH20260080 Mod 1, published May 18, 2026: sam.gov/wage-determination/OH20260080/1
We read every active Ohio Davis-Bacon wage determination from SAM.gov's own data and check every number with a second, independent read of the same file. DOL prints no total; ours is base plus fringe. How we check · Download Geauga County as CSV · Report an error