Home / Oklahoma / Operating Engineer / Pontotoc County group
Oklahoma · Operating Engineer · 4 counties
Operating Engineer prevailing wage, Pontotoc County group, Oklahoma (4 counties)
DOL sets the same operating engineer rates, row for row, in 4 counties: Coal, Garvin, Marshall and Pontotoc. Every figure on this page applies in each of them.
$57.14an hour, base + fringe
$38.09 wage + $19.05 fringe benefits · Building · ENGI0627-018
On federally funded or assisted building construction in each of these 4 counties, an operating engineer must be paid at least $57.14 an hour: a $38.09 base wage plus $19.05 in fringe benefits, under wage determination OK20260071 (modification 1). DOL prints no total, so $57.14 is our sum of the two.
Wage determination OK20260071, modification 1, published May 18, 2026, for building construction; rate identifier ENGI0627-018 (June 1, 2025). Checked against sam.gov on October 25, 2026.
Davis-Bacon is the only prevailing wage here (federally funded or assisted work). Oklahoma's law was invalidated in 1995 and its public-works wage rules are revoked (DOL state table).
DOL lists 44 operating engineer rates for each of these counties, from $7.25 to $57.14 an hour. See all of them.
Base wage and fringe benefits: $38.09 + $19.05
The base wage is the taxable hourly wage. DOL prints the fringe benefits as one hourly figure, not itemized; it can go to health, pension, vacation and training plans, or be paid as cash where the state allows.
| Base wage (taxable) | $38.09 |
| Fringe benefits (one figure, not itemized) | $19.05 |
| Base + fringe benefits (our sum; DOL prints no total) | $57.14 |
When this rate changes
- A contract keeps the wage determination in its bid documents. Modifications published before bid opening apply to it, though one published less than 10 days before can be left out if the agency finds there isn't time to tell bidders (29 CFR 1.6(c)).
- DOL changes a WD by publishing a numbered modification on SAM.gov. This page reads the modification named in the Source line; the Oklahoma change log lists what each one changed.
Every operating engineer rate in the Pontotoc County group
As DOL lists them. The highlighted row is the one this page leads with.
| Classification | Base + fringe | Base | Fringe benefits | WD |
|---|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZERBuildingENGI0627-018 | $53.12 | $34.07 | $19.05 | OK20260071 Mod 1 |
| POWER EQUIPMENT OPERATOR: GROUP 3 ALL CRANE TYPE EQUIPMENT 50 TON CAPACITY AND LARGER, AND LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT (AS RATED BY MFG.) 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER (WITH 30' AND LONGER MAST)BuildingENGI0627-018 | $54.45 | $35.40 | $19.05 | OK20260071 Mod 1 |
| POWER EQUIPMENT OPERATOR: GROUP 2 ALL CRANE TYPE EQUIPMENT 100 TON CAPACITY AND LARGER CRANES, AND LESS THAN 200 TON CAPACITYBuildingENGI0627-018 | $55.19 | $36.14 | $19.05 | OK20260071 Mod 1 |
| POWER EQUIPMENT OPERATOR: GROUP 10 OILERBuildingENGI0627-018 | $46.30 | $27.25 | $19.05 | OK20260071 Mod 1 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANESBuildingENGI0627-018 | $57.14 | $38.09 | $19.05 | OK20260071 Mod 1 |
| OPERATOR: FORKLIFTBuildingSUOK2012-051 | $18.02 | $18.02 | $0.00 | OK20260071 Mod 1 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOEBuildingSUOK2012-051 | $16.83 | $16.83 | $0.00 | OK20260071 Mod 1 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (REMAINING COUNTIES)HighwaySUOK2011-007 | $13.10 | $13.10 | $0.00 | OK20260020 Mod 1 |
| POWER EQUIPMENT OPERATOR: BULLDOZER (REMAINING COUNTIES)HighwaySUOK2011-007 | $14.34 | $14.34 | $0.00 | OK20260020 Mod 1 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (REMAINING COUNTIES)HighwaySUOK2011-007 | $14.05 | $14.05 | $0.00 | OK20260020 Mod 1 |
| POWER EQUIPMENT OPERATOR: (TRENCHER)HighwaySUOK2011-007 | $14.66 | $14.66 | $0.00 | OK20260020 Mod 1 |
| POWER EQUIPMENT OPERATOR: (TRANSFER MATERIAL MACHINE)HighwaySUOK2011-007 | $13.13 | $12.38 | $0.75 | OK20260020 Mod 1 |
| POWER EQUIPMENT OPERATOR: (TRACTOR/BOX BLADE)HighwaySUOK2011-007 | $12.46 | $12.46 | $0.00 | OK20260020 Mod 1 |
| POWER EQUIPMENT OPERATOR: (SCRAPER)HighwaySUOK2011-007 | $14.62 | $14.62 | $0.00 | OK20260020 Mod 1 |
| POWER EQUIPMENT OPERATOR: (ROTOMILL)HighwaySUOK2011-007 | $17.33 | $17.33 | $0.00 | OK20260020 Mod 1 |
| POWER EQUIPMENT OPERATOR: (ROLLER (DIRT COMPACTION))HighwaySUOK2011-007 | $11.86 | $11.86 | $0.00 | OK20260020 Mod 1 |
| POWER EQUIPMENT OPERATOR: (ROLLER (ASPHALT))HighwaySUOK2011-007 | $12.61 | $12.61 | $0.00 | OK20260020 Mod 1 |
| POWER EQUIPMENT OPERATOR: (OILER)HighwaySUOK2011-007 | $16.06 | $16.06 | $0.00 | OK20260020 Mod 1 |
| POWER EQUIPMENT OPERATOR: (MIXER)HighwaySUOK2011-007 | $14.56 | $14.56 | $0.00 | OK20260020 Mod 1 |
| POWER EQUIPMENT OPERATOR: (MILLING MACHINE)HighwaySUOK2011-007 | $14.16 | $14.16 | $0.00 | OK20260020 Mod 1 |
| POWER EQUIPMENT OPERATOR: (MECHANIC)HighwaySUOK2011-007 | $17.37 | $17.37 | $0.00 | OK20260020 Mod 1 |
| POWER EQUIPMENT OPERATOR: (GRADER/BLADE)HighwaySUOK2011-007 | $17.04 | $17.04 | $0.00 | OK20260020 Mod 1 |
| POWER EQUIPMENT OPERATOR: (EXCAVATOR)HighwaySUOK2011-007 | $14.08 | $14.08 | $0.00 | OK20260020 Mod 1 |
| POWER EQUIPMENT OPERATOR: (CRANE)HighwaySUOK2011-007 | $16.17 | $16.17 | $0.00 | OK20260020 Mod 1 |
| POWER EQUIPMENT OPERATOR: (CONCRETE PAVING MACHINE)HighwaySUOK2011-007 | $14.42 | $14.42 | $0.00 | OK20260020 Mod 1 |
| POWER EQUIPMENT OPERATOR: (BROOM)HighwaySUOK2011-007 | $11.02 | $11.02 | $0.00 | OK20260020 Mod 1 |
| POWER EQUIPMENT OPERATOR: (BOBCAT/SKID LOADER)HighwaySUOK2011-007 | $12.62 | $12.62 | $0.00 | OK20260020 Mod 1 |
| POWER EQUIPMENT OPERATOR: (ASPHALT PLANT)HighwaySUOK2011-007 | $14.70 | $14.70 | $0.00 | OK20260020 Mod 1 |
| POWER EQUIPMENT OPERATOR: (ASPHALT PAVING MACHINE)HighwaySUOK2011-007 | $13.11 | $13.11 | $0.00 | OK20260020 Mod 1 |
| POWER EQUIPMENT OPERATOR: (ASPHALT PAVER SCREED)HighwaySUOK2011-007 | $13.99 | $13.99 | $0.00 | OK20260020 Mod 1 |
| POWER EQUIPMENT OPERATOR: GROUP 9 PUMPSHeavyENGI0627-017 | $47.30 | $28.25 | $19.05 | OK20260035 Mod 1 |
| POWER EQUIPMENT OPERATOR: GROUP 8 FORKLIFT;TRACTORHeavyENGI0627-017 | $47.82 | $28.77 | $19.05 | OK20260035 Mod 1 |
| POWER EQUIPMENT OPERATOR: GROUP 6 ROTARY DRILLING MACHINE WHEN OPERATED FROM CONSOLEHeavyENGI0627-017 | $49.92 | $30.87 | $19.05 | OK20260035 Mod 1 |
| POWER EQUIPMENT OPERATOR: GROUP 5 BOBCAT/SKID STEER/SKID LOADERHeavyENGI0627-017 | $51.76 | $32.71 | $19.05 | OK20260035 Mod 1 |
| POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE; MECHANIC; BACKHOE; TRACKHOE; GRADER/BLADE; POWER DRIVEN HOLE DIGGER WITH LESS THAN 30' MAST AND BULLDOZERHeavyENGI0627-017 | $53.12 | $34.07 | $19.05 | OK20260035 Mod 1 |
| POWER EQUIPMENT OPERATOR: GROUP 3 ALL CRANE TYPE EQUIPMENT 50 TON CAPACITY AND LARGER CRANES, AND LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT (AS RATED BY MFG.) 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER (WITH 30' AND LONGER MAST)HeavyENGI0627-017 | $54.45 | $35.40 | $19.05 | OK20260035 Mod 1 |
| POWER EQUIPMENT OPERATOR: GROUP 2 ALL CRANE TYPE EQUIPMENT 100 TON CAPACITY AND LARGER CRANES, AND LESS THAN 200 TON CAPACITYHeavyENGI0627-017 | $55.19 | $36.14 | $19.05 | OK20260035 Mod 1 |
| POWER EQUIPMENT OPERATOR: GROUP 10 OILERHeavyENGI0627-017 | $46.30 | $27.25 | $19.05 | OK20260035 Mod 1 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANESHeavyENGI0627-017 | $57.14 | $38.09 | $19.05 | OK20260035 Mod 1 |
| OPERATOR: SCRAPERHeavySUOK2012-013 | $14.00 | $14.00 | $0.00 | OK20260035 Mod 1 |
| POWER EQUIPMENT OPERATORS: SCRAPERSResidentialSUOK1997-009 | $7.25 | $7.25 | $0.00 | OK20260001 Mod 1 |
| POWER EQUIPMENT OPERATORS: BULLDOZERSResidentialSUOK1997-009 | $7.25 | $7.25 | $0.00 | OK20260001 Mod 1 |
| POWER EQUIPMENT OPERATORS: (FORK LIFT)ResidentialSUOK1997-009 | $7.25 | $7.25 | $0.00 | OK20260001 Mod 1 |
| POWER EQUIPMENT OPERATORS: (BACKHOE)ResidentialSUOK1997-009 | $7.25 | $7.25 | $0.00 | OK20260001 Mod 1 |
How the Pontotoc County group compares
The main operating engineer rate in every county that has one, and how the pay splits here and nearby. All bars use the same scale.
Every county in Oklahoma
Wage and fringe benefits, nearby
- Pontotoc County groupbase $38.09$57.14
- Coal Countybase $38.09$57.14
- Murray Countybase $38.09$57.14
- Johnston Countybase $38.09$57.14
Which county is in which operating engineer group
Every Oklahoma county with a operating engineer rate. Counties DOL treats alike share one page; the rest have their own.
| Counties | Main classification | Base + fringe | Base |
|---|---|---|---|
| Woodward County group, 12 localities: Alfalfa, Beaver, Blaine, Cimarron, Dewey, Ellis, Grant, Harper, Kingfisher, Major, Noble, Woodward | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Kiowa County group, 4 localities: Greer, Harmon, Kiowa, Tillman | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Pontotoc County group, 4 localities: Coal, Garvin, Marshall, Pontotoc | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Delaware County group, 3 localities: Craig, Delaware, Nowata | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Haskell County group, 3 localities: Haskell, Latimer, Pushmataha | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Bryan County group, 2 localities: Atoka, Bryan | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| McIntosh County group, 2 localities: McIntosh, Okfuskee | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Washita County group, 2 localities: Roger Mills, Washita | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Adair County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Beckham County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Caddo County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Canadian County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Carter County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Cherokee County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Choctaw County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Cleveland County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Comanche County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Cotton County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Creek County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Custer County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Garfield County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Grady County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Hughes County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Jackson County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Jefferson County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Johnston County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Kay County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Le Flore County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Lincoln County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Logan County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Love County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Mayes County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| McClain County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| McCurtain County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Murray County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Muskogee County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Oklahoma County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. INCLUDUNG ALL OVERHEAD CRANE TYPES. #CRANCES OVER 400 TONS UP TO AND INCLUDING 500 TONS ADD ADDITIONAL $.75 PER HOUR. CRANES OVER 500 TONS AND UP TO AND INCLUDING 700 TONS ASS AN ADDITIONAL $1.50 PER HOUR. CRANES OVER 700 TONS SHALL ADD ADDITIONAL $3.00 PER HOUR. ALL TOWER CRANES | $57.14 | $38.09 |
| Okmulgee County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Osage County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Ottawa County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Pawnee County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Payne County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Pittsburg County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Pottawatomie County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Rogers County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Seminole County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Sequoyah County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Stephens County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Texas County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Tulsa County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Wagoner County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Washington County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
| Woods County | POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $57.14 | $38.09 |
8 groups of counties with identical DOL rates, and 45 counties with rates of their own.
Oklahoma operating engineer prevailing wage by county, with a map
More from DOL on this rate
- SAM.gov wage determinations
- Davis-Bacon determinations list journeyworker rates. Apprentices in a program registered with DOL or a recognized state agency can be paid the program's percentage of the rate, within its ratio; anyone else gets the full rate (29 CFR 5.5(a)(4)).
Every trade's rates, county by county: Coal · Garvin · Marshall · Pontotoc
Are you being paid this rate?
Add your base pay to the fringe your employer pays for you, in cash or into plans, and compare the sum with the total. The Department of Labor's Wage and Hour Division takes complaints: 1-866-487-9243, or dol.gov/agencies/whd/contact/complaints.
Source
U.S. Department of Labor, Wage and Hour Division (DOL), Davis-Bacon wage determinations on SAM.gov, as of October 25, 2026. For the row this page leads with:
- Coal: OK20260071 Mod 1
- Garvin: OK20260071 Mod 1
- Marshall: OK20260071 Mod 1
- Pontotoc: OK20260071 Mod 1
We read every active Oklahoma Davis-Bacon wage determination from SAM.gov's own data and check every number with a second, independent read of the same file. DOL prints no total; ours is base plus fringe. How we check · Download every Oklahoma rate as CSV · Report an error