Laborer prevailing wage in San Francisco County, California

$72.96an hour, base wage + fringe benefits · Group 1

$40.65 base wage + $32.31 fringe benefits

San Francisco County uses the same laborer rates as 5 other counties. See all of them on one page.

On California public works in San Francisco County, a Group 1 laborer must be paid at least $72.96 an hour in total: $40.65 in wages plus $32.31 in employer payments to health, pension, training and other funds. Daily overtime is $93.29 and Sunday and holiday work is $113.61. DIR puts 50 job titles in Group 1, biohazard cleanup worker and cut granite curb setter among them.

DIR general determination NC-23-102-1-2026-2, issued August 22, 2026. Expires June 27, 2027. Checked against dir.ca.gov on October 24, 2026.

DIR lists 17 laborer rates for San Francisco County, from $60.59 to $73.92 an hour. See all of them.

Base wage and fringe benefits: $40.65 + $32.31

The basic hourly rate is the taxable wage. The other lines, the fringe benefits DIR calls employer payments, are what DIR expects the employer to pay into health, pension and other plans for each hour worked. An employer can pay part of that as extra wages instead, as long as the total per hour stays at $72.96 or more.

Basic hourly rate (taxable wage) (footnote b)$40.65
Health and welfare$12.00
Pension$15.46
Vacation and holiday$4.00
Training$0.52
Other payments$0.33
Total straight-time hourly rate$72.96

Straight time covers an 8-hour day.

When does this rate change?

Scheduled increases

Current rate, DIR Aug 22, 2026Increases DIR has already set

DIR has already set these increases. Work on or after each date is paid the higher rate. DIR often leaves part of an increase "to be allocated to wages and/or employer payments" and confirms the split when it comes due, and it can reduce a scheduled increase in a later notice, so check DIR's increase page before you pay it.

Takes effectIncrease per hourTotal after increase
June 28, 2027+$3.62$76.58
June 26, 2028+$3.61$80.19
June 25, 2029+$3.51$83.70
July 1, 2030+$3.51$87.21

The double asterisk after DIR's expiration date means the next rate is already set. If the work runs past that date you have to pay the new rate, and DIR says to build it into contracts signed now (DIR FAQ, Q8).

Source: DIR increase PDF

Laborer Group 1 job titles

Work DIR classifies in Group 1, copied as printed. The other groups and their rates are in the table below.

Source: Group 1, page 5, Group 1 (B), page 6

Every laborer rate in San Francisco County

As DIR lists them. The highlighted row is the one this page leads with.

  1. Group 6$73.92
  2. Construction Specialist$73.66
  3. Group 6 (D)$73.54
  4. Group 1 (E)$73.51
  5. Group 6 (A)$73.42
  6. Group 1 (A)$73.18
  7. Group 1 (G)$73.16
  8. Group 1 (C)$73.01
  9. Group 1 and Group 1(B)$72.96
  10. Group 6 (C)$72.83
  11. Group 2$72.81
  12. Group 3 and Group 3 (A)$72.71
  13. Group 6 (E)$72.56
  14. Group 7 - Stage 3 (3rd 6 months)$68.67
  15. Group 4 and Group 6 (B)$66.40
  16. Group 7 - Stage 2 (2nd 6 months)$64.63
  17. Group 7 - Stage 1 (1st 6 months)$60.59
Total hourly rate of each laborer classification in San Francisco County, highest first, split into base wage and fringe benefits.
ClassificationBase wageFringe benefitsTotal rateDaily OTDetermination
Construction SpecialistArea 1$41.35 $32.31 $73.66 $94.34 NC-23-102-1-2026-2
Group 1 (A)Area 1
10 jobs in this group
  • All work of loading, placing and blasting of all powder & explosives of whatever type, regardless of method used for loading and placing
  • Joy drill model twm-2a
  • Gardener-denver model dh 143 and similar type drills
  • Track drillers
  • Jack leg drillers
  • Wagon drillers
  • Mechanical drillers-all types regardless of type or method of power
  • Blasters and powderman
  • Tree topper
  • Bit grinder
$40.87 $32.31 $73.18 $93.62 NC-23-102-1-2026-2
Group 1 (C)Area 1
2 jobs in this group
  • Burning and welding in connection with laborer's work
  • Synthetic thermoplastics and similar type welding
$40.70 $32.31 $73.01 $93.36 NC-23-102-1-2026-2
Group 1 (E)Area 1
2 jobs in this group
  • Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings (deep footings is a hole 15 feet or more in depth)
  • Shaft is an excavation over fifteen (15) feet deep of any type
$41.20 $32.31 $73.51 $94.11 NC-23-102-1-2026-2
Group 1 (G)Area 1
1 job in this group
  • Pipelayers (including grade checking in connection with pipelaying), caulkers, banders, pipewrappers, conduit layers, plastic pipe layer, pressure pipe tester, no joint pipe and stripping of same, including repair of voids, precast manhole setters, cast in place manhole form setters in Contra Costa county only
$40.85 $32.31 $73.16 $93.59 NC-23-102-1-2026-2
Group 1 and Group 1(B)Area 1$40.65 $32.31 $72.96 $93.29 NC-23-102-1-2026-2
Group 2Area 1
17 jobs in this group
  • Asphalt shovelers
  • Cement dumpers and handling dry cement or gypsum
  • Choke-setter and rigger (clearing work)
  • Concrete bucket dumper and chuteman
  • Concrete chipping and grinding
  • Concrete laborers (wet or dry)
  • Drillers helper, chuck tender, nipper (one chucktender on single machine operation with minimum of one chucktender for each two machines on multiple machine operation. Jackhammers in no way involved in this item.)
  • Guinea chaser (stakeman), grout crew
  • High pressure nozzleman, adductors
  • Hydraulic monitor (over 100 lbs. Pressure)
  • Loading and unloading, carrying and handling of all rods and materials for use in reinforcing concrete construction
  • Pittsburgh chipper, and similar type brush shredders
  • Semi-skilled wrecker (salvaging of other building materials) - see also skilled wrecker (group 1)
  • Sloper
  • Singlefoot, hand held, pneumatic tamper
  • All pneumatic, air, gas and electric tools not listed in groups 1 through 1 (f)
  • Jacking of pipe-under 12 inches
$40.50 $32.31 $72.81 $93.06 NC-23-102-1-2026-2
Group 3 and Group 3 (A)Area 1
19 jobs in this group
  • Construction laborers including bridge laborers, general laborers and cleanup laborers
  • Demolition worker
  • Dumpman, load spotter
  • Flagperson/pedestrian monitor
  • Fire watcher
  • Fence erectors, including temporary fencing
  • Guardrail erectors
  • Gardener, horticultural and landscape laborers (see group 4, for landscape maintenance on new construction during plant establishment period)
  • Jetting
  • Limbers, brush loaders, and pilers
  • Pavement markers (button setters)
  • Pavers/interlocking pavers (all types) and interlocking paver machines
  • Maintenance, repair trackmen and road beds
  • Streetcar and railroad construction track laborers
  • Temporary air and water lines, victaulic or similar
  • Tool room attendant (jobsite only)
  • Tree removal
  • Wheelbarrow, including power driven
  • Composite crew person (operation of vehicles, when in conjunction with laborer's duties)
$40.40 $32.31 $72.71 $92.91 NC-23-102-1-2026-2
Group 4 and Group 6 (B)Area 1
5 jobs in this group
  • All final cleanup of debris, grounds and buildings near the completion of the project including but not limited to street cleaners (not applicable to engineering or heavy highway projects)
  • Cleaning and washing windows (new construction only), service landscape laborers (such as gardener, horticulture, mowing, trimming, replanting, watering during plant establishment period) on new construction
  • Brick cleaners (job site only)
  • Material cleaners (job site only)
  • Gunite trainee (one gunite laborer shall be allowed for each three (3) journeyman (group 6, 6a, 6c, or general laborer) on a crew. In the absence of the journeyman, the gunite trainee receives the journeyman scale.).
$34.09 $32.31 $66.40 $83.45 NC-23-102-1-2026-2
Group 6Area 1
1 job in this group
  • Structural nozzleman
$41.61 $32.31 $73.92 $94.73 NC-23-102-1-2026-2
Group 6 (A)Area 1
3 jobs in this group
  • Nozzleman (including gunman, potman)
  • Rodman
  • Groundman
$41.11 $32.31 $73.42 $93.98 NC-23-102-1-2026-2
Group 6 (C)Area 1
1 job in this group
  • Reboundman
$40.52 $32.31 $72.83 $93.09 NC-23-102-1-2026-2
Group 6 (D)Area 1
1 job in this group
  • Aligner of wire winding machine in connection with guniting or shot crete
$41.23 $32.31 $73.54 $94.16 NC-23-102-1-2026-2
Group 6 (E)Area 1
1 job in this group
  • Aligner helper of wire winding machine in connection with guniting or shot crete
$40.25 $32.31 $72.56 $92.69 NC-23-102-1-2026-2
Group 7 - Stage 1 (1st 6 months)Area 1
1 job in this group
  • Entry level landscape laborer (ratio for entry level is one in three. At least one second period entry level and at least one third period entry level must be employed before employing another first period trainee).
$28.28 $32.31 $60.59 $74.73 NC-23-102-1-2026-2
Group 7 - Stage 2 (2nd 6 months)Area 1
1 job in this group
  • Entry level landscape laborer (ratio for entry level is one in three. At least one second period entry level and at least one third period entry level must be employed before employing another first period trainee).
$32.32 $32.31 $64.63 $80.79 NC-23-102-1-2026-2
Group 7 - Stage 3 (3rd 6 months)Area 1
1 job in this group
  • Entry level landscape laborer (ratio for entry level is one in three. At least one second period entry level and at least one third period entry level must be employed before employing another first period trainee).
$36.36 $32.31 $68.67 $86.85 NC-23-102-1-2026-2

Davis-Bacon laborer rate in San Francisco County

Federally funded or assisted construction here uses the U.S. Department of Labor's wage determinations. When a California awarding body runs a federally funded or assisted project, DIR's rates must be paid where they are higher than the Davis-Bacon rates (DIR public works FAQ).

We don't put a federal figure next to DIR's here, because the federal determination for this county has no matching classification. The federal rows for this trade are below; match the classification to the work.

ConstructionFederal classificationBase wageTotal rateWD
Building, Highway, HeavyOPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK- SHAFTS, STOPES, RAISES: AREA 1, GROUP 2- COMBINATION SLUSHER AND MOTOR OPERATOR; CONCRETE PUMP OR …ENGI0003-001$61.80 $94.33 CA20260018 Mod 8
Building, Highway, HeavyOPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK- UNDERGOUND: AREA 1, GROUP 2- COMBINATION SLUSHER AND MOTOR OPERATOR; CONCRETE PUMP OR PUMPCRETE GUN; …ENGI0003-001$61.70 $94.23 CA20260018 Mod 8
Building, Highway, HeavyLABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, …LABO0073-007
DOL prints this rate per day: $38.15 base, fringe “29.89”.
——CA20260018 Mod 8
Building, Highway, HeavyLABORER (CONSTRUCTION CRAFT LABORERS) GROUP 1-F- WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR SHOT CRETE.LABO0261-009
DOL prints this rate per day: $31.37 base, fringe “23.20”.
——CA20260018 Mod 8
Building, Highway, HeavyLABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST GROUP- ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- …LABO0261-009
DOL prints this rate per day: $37.20 base, fringe “27.30”.
——CA20260018 Mod 8
Building, Highway, HeavyLABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-A- JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; …LABO0261-009
DOL prints this rate per day: $36.72 base, fringe “27.30”.
——CA20260018 Mod 8
Building, Highway, HeavyLABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-C- BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING.LABO0261-009
DOL prints this rate per day: $36.55 base, fringe “27.30”.
——CA20260018 Mod 8
Building, Highway, HeavyLABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-E- WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS …LABO0261-009
DOL prints this rate per day: $37.05 base, fringe “27.30”.
——CA20260018 Mod 8
Building, Highway, HeavyLABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2- ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); …LABO0261-009
DOL prints this rate per day: $36.35 base, fringe “27.30”.
——CA20260018 Mod 8
Building, Highway, HeavyLABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4- FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND …LABO0261-009
DOL prints this rate per day: $29.94 base, fringe “27.30”.
——CA20260018 Mod 8
Building, Highway, HeavyLABORER, WRECKING: GROUP 1- SKILLED WRECKER (REMOVING AND SALVAGING OF SASH, WINDOWS, AND MATERIALS).LABO0261-009$36.50 $63.80 CA20260018 Mod 8
Building, Highway, HeavyLABORER, WRECKING: GROUP 2- SEMI-SKILLED WRECKER (SALVAGING OF OTHER BUILDING MATERIALS).LABO0261-009$36.35 $63.65 CA20260018 Mod 8
Building, Highway, HeavyLABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, …LABO0270-007
DOL prints this rate per day: $35.50 base, fringe “27.30”.
——CA20260018 Mod 8
Building, Highway, HeavyLABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, …LABO0270-010
DOL prints this rate per day: $36.50 base, fringe “27.30”.
——CA20260018 Mod 8
Building, Highway, HeavyLABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, …LABO0294-008
DOL prints this rate per day: $35.50 base, fringe “27.30”.
——CA20260018 Mod 8
Building, Highway, HeavyLABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, …LABO0304-004
DOL prints this rate per day: $36.50 base, fringe “27.30”.
——CA20260018 Mod 8
Building, Highway, HeavyLABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, …LABO0324-012
DOL prints this rate per day: $36.50 base, fringe “27.30”.
——CA20260018 Mod 8
Building, Highway, HeavyLABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, …LABO1130-007
DOL prints this rate per day: $35.50 base, fringe “27.30”.
——CA20260018 Mod 8
ResidentialLABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, …LABO0185-001$35.50 $62.80 CA20260019 Mod 6
ResidentialLABORERS: CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST: ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- …LABO0261-001
DOL prints this rate per day: $37.20 base, fringe “27.30”.
——CA20260019 Mod 6
ResidentialLABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-A: JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; …LABO0261-001
DOL prints this rate per day: $36.72 base, fringe “27.30”.
——CA20260019 Mod 6
ResidentialLABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-C: BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING …LABO0261-001
DOL prints this rate per day: $36.55 base, fringe “27.30”.
——CA20260019 Mod 6
ResidentialLABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-E: WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING …LABO0261-001
DOL prints this rate per day: $37.05 base, fringe “27.30”.
——CA20260019 Mod 6
ResidentialLABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 2: ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); …LABO0261-001
DOL prints this rate per day: $36.35 base, fringe “27.30”.
——CA20260019 Mod 6
ResidentialLABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 3: CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; …LABO0261-001
DOL prints this rate per day: $36.25 base, fringe “27.30”.
——CA20260019 Mod 6
ResidentialLABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 4: ALL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND …LABO0261-001
DOL prints this rate per day: $29.94 base, fringe “27.30”.
——CA20260019 Mod 6
ResidentialLABORERS:, WRECKING: GROUP 1 SKILLED WRECKER (REMOVING AND SALVAGING OF SASH, WINDOWS ADN MATERIALS (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES)LABO0261-001$36.50 $63.80 CA20260019 Mod 6
ResidentialLABORERS:, WRECKING: GROUP 2 SEMI-SKILLED WRECKER (SALVAGING OF OTHER BUILDING MATERIALS) (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES)LABO0261-001$36.35 $63.65 CA20260019 Mod 6
ResidentialLABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, …LABO0270-001
DOL prints this rate per day: $36.50 base, fringe “27.30”.
——CA20260019 Mod 6
ResidentialLABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, …LABO0270-001$35.50 $62.80 CA20260019 Mod 6
ResidentialLABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1 ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, …LABO0304-001
DOL prints this rate per day: $36.50 base, fringe “27.30”.
——CA20260019 Mod 6
ResidentialLABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, …LABO0324-001
DOL prints this rate per day: $36.50 base, fringe “27.30”.
——CA20260019 Mod 6
ResidentialLABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, …LABO0324-001$35.50 $62.80 CA20260019 Mod 6

Davis-Bacon rates from SAM.gov, read October 25, 2026. Our federal totals are base plus fringe; DOL prints no total. California Davis-Bacon changes

How San Francisco County compares

The main laborer rate in every county that has one, and how the pay splits here and in the nearest counties. All bars use the same scale.

Every county in California

$71.96Alpine$78.65Imperial
San FranciscoNearby: San Mateo $72.96, Marin $72.96, Solano $71.96Each column is a group of counties with about the same main rate; its height is how many. 12 counties pay more than San Francisco, 5 the same, 40 less.

Base wage and fringe benefits, nearby

  1. San Francisco Countybase $40.65 · Area 1$72.96
  2. San Mateo Countybase $40.65 · Area 1$72.96
  3. Marin Countybase $40.65 · Area 1$72.96
  4. Solano Countybase $39.65 · Area 2$71.96

Laborer rates in nearby counties

Current DIR rates. You pay the rate for the county where the work is done, even if your shop is somewhere else.

DIR's laborer rates for San Francisco County are the same as in 5 other counties: Alameda, Contra Costa, Marin, San Mateo, Santa Clara.

CountyClassificationBase wageTotal ratevs San Francisco County
San Francisco CountyGroup 1 and Group 1(B) (Area 1)$40.65 $72.96 
San Mateo CountyGroup 1 and Group 1(B) (Area 1)$40.65 $72.96 same
Marin CountyGroup 1 and Group 1(B) (Area 1)$40.65 $72.96 same
Contra Costa CountyGroup 1 and Group 1(B) (Area 1)$40.65 $72.96 same
Alameda CountyGroup 1 and Group 1(B) (Area 1)$40.65 $72.96 same
Solano CountyGroup 1 and Group 1(B) (Area 2)$39.65 $71.96 −$1.00
Napa CountyGroup 1 and Group 1(B) (Area 2)$39.65 $71.96 −$1.00

California laborer prevailing wage by county, with a map

Footnotes on this rate

DIR's footnotes, in DIR's words. Several change the rate itself: zone pay, a percentage added to the total, or which overtime hours get which rate.

DIR's other marks: # means an apprenticeable craft, * means in effect until superseded, ** means the next rate is already set.

More from DIR on this rate

All San Francisco County prevailing wage rates

Are you being paid this rate?

Add your hourly wage to what your employer pays into health, pension and other plans for you, and compare it with $72.96. Plan payments only count if the money goes into the plan; your pay stub won't show them, but plan statements will. The training amount goes to the California Apprenticeship Council or an apprenticeship program, not to you. Check a week of pay.

Contractors on most public works jobs file certified payroll with the state, and anyone can look it up in DIR's CPR public search. If your total comes up short, you can file a public works complaint with the California Labor Commissioner.

Source

California Department of Industrial Relations, general prevailing wage determination NC-23-102-1-2026-2, page 1: www.dir.ca.gov/oprl/2026-2/PWD/Determinations/Northern/NC-023-102-1.pdf

Each figure is copied from DIR's file and checked by a second, separate reader. How we check · How to read a determination · Download San Francisco County as CSV · Report an error