Prevailing wage overtime rules in California

On California public works, Labor Code section 1815 requires at least 1½ times the basic rate for hours over 8 in a day and 40 in a week. The DIR determination for each craft then sets the actual overtime rates, including Saturday, Sunday and holiday rates, and its footnotes decide how many hours are paid at 1½ times before the double-time rate starts.

Checked on October 24, 2026 against Labor Code sections 1810 to 1815, DIR's prevailing wage FAQ, the Labor Commissioner's Public Works Manual (October 2023) and DIR's 2026-2 determinations. Published October 25, 2026. Overtime is paid as written in the determination for your project.

What the Labor Code requires

SectionRule
1810"Eight hours labor constitutes a legal day's work" on work done under the authority of the state or a municipal corporation
1811Work on public works is limited to 8 hours a calendar day and 40 hours a calendar week, "except as hereinafter provided for under Section 1815"
1815Work over 8 hours a day and 40 hours a week is permitted "upon compensation for all hours worked in excess of 8 hours per day at not less than 1 1/2 times the basic rate of pay"
1813A $25 penalty "for each worker … for each calendar day" worked over 8 hours a day and 40 hours a week in violation of the article

DIR's FAQ restates it and points to the determinations: pay for hours over eight a day and 40 a week "should be not less than one-and-one-half times the basic rate of pay. For specific overtime requirements, please refer to the prevailing wage determinations" (FAQ, Q14). Most determinations go further than the statute. Of the 16,854 straight-time rows we track for DIR's 2026-2 period, 15,757 publish a Sunday and holiday overtime rate, and 503 publish a second daily overtime column at double time.

How prevailing wage overtime is calculated

The multiplier applies to the basic hourly rate. Employer payments are added on top at their straight-time amount unless a footnote says otherwise. The Public Works Manual (section 4.2.3) puts it this way: "the overtime rate (for example, time and one half) is based upon the Basic Hourly Rate only. The Employer Payment is therefore excluded from calculating the applicable overtime premium." Employer payments are still owed for every overtime hour.

The Fresno County carpenter rate (Area 4, NC-23-31-1-2026-1) shows the arithmetic. The base is $63.03 and the employer payments total $39.15:

ColumnArithmeticDIR's rate
Straight time$63.03 + $39.15$102.18
Daily and Saturday overtime, 1½×$63.03 × 1.5 + $39.15$133.70
Daily and Saturday overtime, 2×; Sunday and holiday$63.03 × 2 + $39.15$165.21

DIR prints these rates already worked out in the determination. Our Fresno carpenter page shows the full row.

Daily overtime: which hours get 1½× and which get 2×

The footnotes under the overtime headings set the hour limits. Carpenter footnote e says the 1½× daily rate "applies to the first 4 hours daily overtime," for building and for heavy, highway and engineering work. A 13-hour building day for the Fresno carpenter is paid like this:

Fresno carpenter, 13-hour weekday (building)
12345678910111213
Hours 1 to 8, straight time8 × $102.18$817.44
Hours 9 to 12, daily overtime 1½× (footnote e)4 × $133.70$534.80
Hour 13, daily overtime 2×1 × $165.21$165.21
Day total13 hours$1,517.45

Other crafts set a shorter 1½× window. The Alameda County bricklayer row (determination 018-3-4, ALA-2026-2) uses footnote E: the rate "applies to the first 2 daily overtime hours and the first 10 hours on Saturday; all other time is paid at the Sunday and holiday overtime hourly rate." So the eleventh hour on a weekday is already at $151.29:

Alameda bricklayer, 11-hour weekday
1234567891011
Hours 1 to 8, straight time8 × $90.95$727.60
Hours 9 and 10, first 2 daily overtime hours (footnote E)2 × $121.12$242.24
Hour 11, Sunday and holiday rate1 × $151.29$151.29
Day total11 hours$1,121.13

Overtime also counts by the week. Section 1815 sets 40 hours a week as the second trigger, and the manual (section 4.1.6) says that when Saturday, Sunday or holiday hours push the week past 40, "overtime rates (calculated from the premium rate) also applies." A few determinations set lower triggers, such as 7 hours a day or 35 a week, and then those govern (section 4.1.6.1). Four rows in the 2026-2 set we track use a 7-hour day.

Saturday overtime on prevailing wage

The manual says Saturday, Sunday and holiday premium rates "apply for the hours worked on each of those days as specified in the applicable determination" (section 4.1.6). In 14,677 of the 16,854 rows we track, DIR's Saturday rate equals the first daily overtime rate and sits below the Sunday and holiday rate. In another 1,288 it equals the Sunday and holiday rate (in 1,144 of those, all three columns are the same).

Footnotes set the Saturday window too, and they can depend on the type of work. Carpenter footnote g says the 1½× Saturday rate applies "to the first 8 hours for building construction and for the first 10 hours worked on heavy, highway and engineering construction." The same 10 hours on a Saturday pay differently:

Saturday, 10 hours, building
12345678910
First 8 hours at 1½× (footnote g)8 × $133.70$1,069.60
Hours 9 and 10 at 2×2 × $165.21$330.42
Day total10 hours$1,400.02
Saturday, 10 hours, heavy and highway
12345678910
All 10 hours at 1½× (footnote g)10 × $133.70$1,337.00
Day total10 hours$1,337.00

Some crafts pay Saturday at double time outright. The Alameda inside wireman row lists $214.13 for Saturday, the same as its Sunday and holiday rate, and footnote T makes an exception for maintenance, emergency and repair jobs, where "the daily overtime hourly rate shall apply to the first 8 hours on Saturday."

Saturday make-up days are the other common footnote. Carpenter footnote f allows a weekday lost to "inclement weather or major mechanical breakdown" to be made up on Saturday "at the applicable straight time rates," and the work is voluntary. The bricklayer's footnote D has a similar rule.

Sunday and holiday overtime

Sunday and holiday hours are paid from the Sunday/holiday column, which is double time in the three examples here ($165.21 for the Fresno carpenter, $151.29 for the Alameda bricklayer, $214.13 for the Alameda wireman). Which days count as holidays depends on the craft. Each determination links its own holiday PDF, based on the collective bargaining agreement on file with DIR, and the manual notes that the DIR website "identifies the particular Holidays covered by the premium rate requirements under each wage determination" (section 4.1.6).

Footnotes can change specific days. Carpenter footnote h pays 1½× instead of 2× "for the first eight (8) hours worked on the four (4) days of each year selected by the Union as designated off/holidays." The fire safety rows in 12 Southern California counties, from Imperial to San Luis Obispo, say no work is done on Labor Day except in emergencies, "and then only when triple (3) times is paid."

When a footnote multiplies a fringe benefit

A footnote that says a payment is "factored at the applicable overtime multiplier" means that payment is multiplied along with the base. About 3,000 rows in our 2026-2 data carry a footnote with that wording. The Alameda bricklayer's footnote B says "vacation is factored at the applicable overtime multiplier":

Alameda bricklayerArithmeticDIR's rate
Straight time$57.09 + $3.25 vacation + $30.61 other payments$90.95
Daily / Saturday 1½×($57.09 + $3.25) × 1.5 + $30.61$121.12
Sunday / holiday 2×($57.09 + $3.25) × 2 + $30.61$151.29

The Alameda inside wireman row (061-595-1) has two footnotes of this kind. Footnote R factors a Contract Administration Fund amount of 1.05% of the base, and footnote Q adds 3% for the National Employees Benefit Board "to the total hourly rate and overtime hourly rates." DIR's published 1½× rate of $172.90 matches this reconstruction: $118.875 wage, plus the straight-time payments ($21.16 health and welfare, $24.97 pension, $2.43 training, $1.48 other), plus $0.416 for the extra half of the CAF amount, plus 3% of the overtime wage ($3.566). Pay the rates as DIR prints them; the reconstruction is a cross-check. The fringe benefits guide explains these add-ons at straight time.

Exceptions to prevailing wage overtime

8 CCR 16200(a)(3)(F), as summarized in the Public Works Manual, section 4.1.7.

  1. If a workweek other than Monday to Friday is a fixed business practice or required by the awarding body, no overtime is owed for the first eight hours on Saturday or Sunday. The manual reads "fixed business practice" narrowly: the contractor has to show it on all its projects, public and private.
  2. If the collective bargaining agreement provides for Saturday and Sunday work at straight time, no overtime is owed for the first eight hours on those days.
  3. If the awarding body determines the work can't be done in normal hours, or must be done off-hours to avoid danger to life or property, no overtime is owed for the first eight hours a day and 40 a week.
  4. No overtime is owed for fewer than 40 hours in a standard week or 8 hours in a day, unless the collective bargaining agreement behind the determination says otherwise.

Two classifications, or a private job, in the same day

All hours in the workday count toward overtime. The manual's example (section 3.2.7.1) has a worker do four hours as an inside wireman and six as a painter: the pay is four hours at the wireman's straight-time rate, four at the painter's straight-time rate, and two at the painter's overtime rate, because overtime is paid at the rate "in effect for the type of work he or she is performing during those overtime hours." The same applies across two public works projects in one day.

Mixing public and private work in a day works the same way. In the manual's example (section 3.2.7.2), four private hours at $15.00 come first, then eight public hours at $30.00. The worker earns $15.00 for the private hours, $30.00 for the first four public hours, and the determination's overtime rate (the manual uses $45.00) for the last four, which are hours 9 to 12 of the day.

Underpaid overtime brings two penalties: $25 per worker per day under section 1813, and the section 1775 penalty of up to $200 per worker per day for paying less than the prevailing rate, which under section 1771 includes the rate "for holiday and overtime work" (see also manual section 4.1.6.1). The unpaid wages are owed on top.

Check overtime on a real rate

Quick answers

Does prevailing wage pay overtime in California?

Yes. Labor Code 1815 requires at least 1½ times the basic rate for hours over 8 in a day and 40 in a week on public works, and each DIR determination sets the actual daily, Saturday, Sunday and holiday overtime rates for its craft.

How is prevailing wage overtime calculated?

The multiplier applies to the basic hourly rate only. Employer payments are added on top at their straight-time amount, unless a footnote says a payment is factored at the overtime multiplier (Public Works Manual 4.2.3). DIR prints the overtime rates already worked out in the determination.

What is the penalty for not paying prevailing wage overtime?

$25 per worker per day under Labor Code 1813, plus the section 1775 penalty of up to $200 per worker per day for paying less than the prevailing rate. The unpaid wages are owed on top.