Home / Georgia / Sheet Metal Worker
Georgia · Sheet Metal Worker
Georgia sheet metal worker prevailing wage, county by county
A sheet metal worker's Davis-Bacon prevailing wage in Georgia runs from $18.62 an hour in Wayne County to $55.70 in Baldwin County. The median county is $55.69.
Sheet Metal Worker rate in each Georgia county, A to Z
| County | Base wage | Fringe benefits | Total rate | Effective | Source |
|---|---|---|---|---|---|
Appling CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Coffee County group | $15.09 | $3.53 | $18.62 | May 18, 2026 | GA20260166 Mod 2 |
Appling CountySHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION · Coffee County group | $9.31 | $0.00 | $9.31 | May 18, 2026 | GA20260017 Mod 1 |
Atkinson CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Pierce County group | $15.09 | $3.53 | $18.62 | May 18, 2026 | GA20260166 Mod 2 |
Atkinson CountySHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION · Pierce County group | $9.31 | $0.00 | $9.31 | May 18, 2026 | GA20260018 Mod 1 |
Bacon CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Pierce County group | $15.09 | $3.53 | $18.62 | May 18, 2026 | GA20260166 Mod 2 |
Bacon CountySHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION · Pierce County group | $9.31 | $0.00 | $9.31 | May 18, 2026 | GA20260018 Mod 1 |
Baker CountySHEET METAL WORKER | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260312 Mod 2 |
Baker CountySHEET METAL WORKER (BUILDINGS UP TO 100,000 SQUARE FEET) | $32.60 | $15.52 | $48.12 | Aug 1, 2023 | GA20260024 Mod 1 |
Baldwin CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $37.75 | $17.95 | $55.70 | Jul 1, 2025 | GA20260084 Mod 2 |
Baldwin CountySHEET METAL WORKER | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260019 Mod 1 |
Banks CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $24.89 | $9.09 | $33.98 | May 18, 2026 | GA20260104 Mod 1 |
Banks CountySHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $10.07 | $0.00 | $10.07 | May 18, 2026 | GA20260005 Mod 1 |
Barrow CountySHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260313 Mod 2 |
Barrow CountySHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION (Buildings up to 100,000 square feet) | $25.49 | $11.73 | $37.22 | Aug 1, 2023 | GA20260025 Mod 1 |
Bartow CountySHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260302 Mod 2 |
Bartow CountySHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION (Buildings up to 100,000 square feet) | $25.49 | $11.73 | $37.22 | Aug 1, 2023 | GA20260026 Mod 1 |
Ben Hill CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $15.09 | $3.53 | $18.62 | May 18, 2026 | GA20260085 Mod 2 |
Ben Hill CountySHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $9.31 | $0.00 | $9.31 | May 18, 2026 | GA20260006 Mod 1 |
Berrien CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Pierce County group | $15.09 | $3.53 | $18.62 | May 18, 2026 | GA20260166 Mod 2 |
Berrien CountySHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION · Pierce County group | $9.31 | $0.00 | $9.31 | May 18, 2026 | GA20260018 Mod 1 |
Bibb CountySHEET METAL WORKER | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260314 Mod 2 |
Bibb CountySHEET METAL: EXCLUDING HVAC DUCT INSTALLATION: (BUILDINGS OVER 100,000 SQUARE FEET) | $32.60 | $15.52 | $48.12 | Aug 1, 2023 | GA20260027 Mod 1 |
Bleckley CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $37.75 | $17.95 | $55.70 | Jul 1, 2025 | GA20260086 Mod 2 |
Bleckley CountySHEET METAL WORKER | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260019 Mod 1 |
Brantley CountySHEET METAL WORKER · Glynn County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260315 Mod 2 |
Brantley CountySHEET METAL WORKER · Glynn County group | $7.50 | $0.00 | $7.50 | May 18, 2026 | GA20260046 Mod 1 |
Brooks CountySHEET METAL WORKER · Lowndes County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260316 Mod 2 |
Brooks CountySHEET METAL WORKER (BUILDINGS UP TO 100,000 SQUARE FEET) · Lowndes County group | $32.60 | $15.52 | $48.12 | Aug 1, 2023 | GA20260047 Mod 1 |
Bryan CountySHEET METAL WORKER | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260317 Mod 2 |
Bryan CountySHEET METAL WORKER | $7.50 | $0.00 | $7.50 | May 18, 2026 | GA20260028 Mod 1 |
Bulloch CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Bulloch County group | $19.33 | $5.47 | $24.80 | May 18, 2026 | GA20260105 Mod 1 |
Bulloch CountySHEET METAL WORKER · Bulloch County group | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260020 Mod 1 |
Burke CountySHEET METAL WORKER · Columbia County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260318 Mod 2 |
Burke CountySHEET METAL WORKER (BUILDINGS UP TO 100,000 SQUARE FEET) · Columbia County group | $32.60 | $15.52 | $48.12 | Aug 1, 2023 | GA20260048 Mod 1 |
Butts CountySHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260313 Mod 2 |
Butts CountySHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION (Buildings up to 100,000 square feet) | $25.49 | $11.73 | $37.22 | Aug 1, 2023 | GA20260029 Mod 1 |
Calhoun CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Grady County group | $15.09 | $3.53 | $18.62 | May 18, 2026 | GA20260166 Mod 2 |
Calhoun CountySHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION · Grady County group | $9.31 | $0.00 | $9.31 | May 18, 2026 | GA20260018 Mod 1 |
Camden CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $15.09 | $3.53 | $18.62 | May 18, 2026 | GA20260087 Mod 1 |
Camden CountySHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $9.31 | $0.00 | $9.31 | May 18, 2026 | GA20260007 Mod 1 |
Candler CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Bulloch County group | $19.33 | $5.47 | $24.80 | May 18, 2026 | GA20260105 Mod 1 |
Candler CountySHEET METAL WORKER · Bulloch County group | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260020 Mod 1 |
Carroll CountySHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) · Cherokee County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260313 Mod 2 |
Carroll CountySHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION (Buildings up to 100,000 square feet) · Cherokee County group | $25.49 | $11.73 | $37.22 | Aug 1, 2023 | GA20260049 Mod 1 |
Catoosa CountySHEET METAL WORKER | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260319 Mod 2 |
Catoosa CountySHEET METAL WORKER | $23.96 | $8.93 | $32.89 | Jun 1, 2010 | GA20260030 Mod 1 |
Charlton CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $15.09 | $3.53 | $18.62 | May 18, 2026 | GA20260088 Mod 2 |
Charlton CountySHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $9.31 | $0.00 | $9.31 | May 18, 2026 | GA20260018 Mod 1 |
Chatham CountySHEET METAL WORKER | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260317 Mod 2 |
Chatham CountySHEET METAL WORKER | $7.50 | $0.00 | $7.50 | May 18, 2026 | GA20260031 Mod 1 |
Chattahoochee CountySHEET METAL WORKER · Harris County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260320 Mod 2 |
Chattahoochee CountySHEET METAL WORKER (BUILDINGS UP TO 100,000 SQUARE FEET) · Harris County group | $32.60 | $15.52 | $48.12 | Aug 1, 2023 | GA20260050 Mod 1 |
Chattooga CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $24.89 | $9.09 | $33.98 | May 18, 2026 | GA20260104 Mod 1 |
Chattooga CountySHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260008 Mod 1 |
Cherokee CountySHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) · Cherokee County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260313 Mod 2 |
Cherokee CountySHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION (Buildings up to 100,000 square feet) · Cherokee County group | $25.49 | $11.73 | $37.22 | Aug 1, 2023 | GA20260049 Mod 1 |
Clarke CountySHEET METAL WORKER · Clarke County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260321 Mod 2 |
Clarke CountySHEET METAL WORKER (BUILDINGS UP TO 100,000 SQUARE FEET) · Clarke County group | $32.60 | $15.52 | $48.12 | Aug 1, 2023 | GA20260048 Mod 1 |
Clay CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Pierce County group | $15.09 | $3.53 | $18.62 | May 18, 2026 | GA20260166 Mod 2 |
Clay CountySHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION · Pierce County group | $9.31 | $0.00 | $9.31 | May 18, 2026 | GA20260018 Mod 1 |
Clayton CountySHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260303 Mod 2 |
Clayton CountySHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION (Buildings up to 100,000 square feet) | $25.49 | $11.73 | $37.22 | Aug 1, 2023 | GA20260032 Mod 1 |
Clinch CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Pierce County group | $15.09 | $3.53 | $18.62 | May 18, 2026 | GA20260166 Mod 2 |
Clinch CountySHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION · Pierce County group | $9.31 | $0.00 | $9.31 | May 18, 2026 | GA20260018 Mod 1 |
Cobb CountySHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260304 Mod 2 |
Cobb CountySHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION (Buildings up to 100,000 square feet) | $25.49 | $11.73 | $37.22 | Aug 1, 2023 | GA20260033 Mod 1 |
Coffee CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Coffee County group | $15.09 | $3.53 | $18.62 | May 18, 2026 | GA20260166 Mod 2 |
Coffee CountySHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION · Coffee County group | $9.31 | $0.00 | $9.31 | May 18, 2026 | GA20260017 Mod 1 |
Colquitt CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $15.09 | $3.53 | $18.62 | May 18, 2026 | GA20260166 Mod 2 |
Colquitt CountySHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $9.31 | $0.00 | $9.31 | May 18, 2026 | GA20260009 Mod 1 |
Columbia CountySHEET METAL WORKER · Columbia County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260318 Mod 2 |
Columbia CountySHEET METAL WORKER (BUILDINGS UP TO 100,000 SQUARE FEET) · Columbia County group | $32.60 | $15.52 | $48.12 | Aug 1, 2023 | GA20260048 Mod 1 |
Cook CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Pierce County group | $15.09 | $3.53 | $18.62 | May 18, 2026 | GA20260166 Mod 2 |
Cook CountySHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION · Pierce County group | $9.31 | $0.00 | $9.31 | May 18, 2026 | GA20260018 Mod 1 |
Coweta CountySHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) · Cherokee County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260313 Mod 2 |
Coweta CountySHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION (Buildings up to 100,000 square feet) · Cherokee County group | $25.49 | $11.73 | $37.22 | Aug 1, 2023 | GA20260049 Mod 1 |
Crawford CountySHEET METAL WORKER | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260314 Mod 2 |
Crawford CountySHEET METAL: EXCLUDING HVAC DUCT INSTALLATION: (BUILDINGS OVER 100,000 SQUARE FEET) | $32.60 | $15.52 | $48.12 | Aug 1, 2023 | GA20260034 Mod 1 |
Crisp CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Sumter County group | $37.75 | $17.95 | $55.70 | Jul 1, 2025 | GA20260106 Mod 2 |
Crisp CountySHEET METAL WORKER · Sumter County group | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260019 Mod 1 |
Dade CountySHEET METAL WORKER · Walker County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260319 Mod 2 |
Dade CountySHEET METAL WORKER · Walker County group | $23.96 | $8.93 | $32.89 | Jun 1, 2010 | GA20260051 Mod 1 |
Dawson CountySHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) · Cherokee County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260313 Mod 2 |
Dawson CountySHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION (Buildings up to 100,000 square feet) · Cherokee County group | $25.49 | $11.73 | $37.22 | Aug 1, 2023 | GA20260049 Mod 1 |
Decatur CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $15.09 | $3.53 | $18.62 | May 18, 2026 | GA20260089 Mod 2 |
Decatur CountySHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $9.31 | $0.00 | $9.31 | May 18, 2026 | GA20260018 Mod 1 |
DeKalb CountySHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260305 Mod 2 |
DeKalb CountySHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION (Buildings up to 100,000 square feet) | $25.49 | $11.73 | $37.22 | Aug 1, 2023 | GA20260035 Mod 1 |
Dodge CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Sumter County group | $37.75 | $17.95 | $55.70 | Jul 1, 2025 | GA20260106 Mod 2 |
Dodge CountySHEET METAL WORKER · Sumter County group | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260019 Mod 1 |
Dooly CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Sumter County group | $37.75 | $17.95 | $55.70 | Jul 1, 2025 | GA20260106 Mod 2 |
Dooly CountySHEET METAL WORKER · Sumter County group | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260019 Mod 1 |
Dougherty CountySHEET METAL WORKER · Dougherty County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260312 Mod 2 |
Dougherty CountySHEET METAL WORKER (BUILDINGS UP TO 100,000 SQUARE FEET) · Dougherty County group | $32.60 | $15.52 | $48.12 | Aug 1, 2023 | GA20260052 Mod 1 |
Douglas CountySHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) · Cherokee County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260313 Mod 2 |
Douglas CountySHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION (Buildings up to 100,000 square feet) · Cherokee County group | $25.49 | $11.73 | $37.22 | Aug 1, 2023 | GA20260049 Mod 1 |
Early CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $15.09 | $3.53 | $18.62 | May 18, 2026 | GA20260090 Mod 2 |
Early CountySHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $9.31 | $0.00 | $9.31 | May 18, 2026 | GA20260018 Mod 1 |
Echols CountySHEET METAL WORKER · Lowndes County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260316 Mod 2 |
Echols CountySHEET METAL WORKER (BUILDINGS UP TO 100,000 SQUARE FEET) · Lowndes County group | $32.60 | $15.52 | $48.12 | Aug 1, 2023 | GA20260047 Mod 1 |
Effingham CountySHEET METAL WORKER | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260317 Mod 2 |
Effingham CountySHEET METAL WORKER | $7.50 | $0.00 | $7.50 | May 18, 2026 | GA20260036 Mod 1 |
Elbert CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Hart County group | $24.89 | $9.09 | $33.98 | May 18, 2026 | GA20260104 Mod 1 |
Elbert CountySHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION · Hart County group | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260021 Mod 1 |
Emanuel CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Bulloch County group | $19.33 | $5.47 | $24.80 | May 18, 2026 | GA20260105 Mod 1 |
Emanuel CountySHEET METAL WORKER · Bulloch County group | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260020 Mod 1 |
Evans CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Bulloch County group | $19.33 | $5.47 | $24.80 | May 18, 2026 | GA20260105 Mod 1 |
Evans CountySHEET METAL WORKER · Bulloch County group | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260020 Mod 1 |
Fannin CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Gilmer County group | $24.89 | $9.09 | $33.98 | May 18, 2026 | GA20260107 Mod 1 |
Fannin CountySHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION · Gilmer County group | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260021 Mod 1 |
Fayette CountySHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260313 Mod 2 |
Fayette CountySHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION (Buildings up to 100,000 square feet) | $25.49 | $11.73 | $37.22 | Aug 1, 2023 | GA20260037 Mod 1 |
Floyd CountySHEET METAL WORKER | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260306 Mod 2 |
Floyd CountySHEET METAL WORKER (BUILDINGS UP TO 100,000 SQUARE FEET) | $32.60 | $15.52 | $48.12 | Aug 1, 2023 | GA20260053 Mod 1 |
Forsyth CountySHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260313 Mod 2 |
Forsyth CountySHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION (Buildings up to 100,000 square feet) | $25.49 | $11.73 | $37.22 | Aug 1, 2023 | GA20260038 Mod 1 |
Franklin CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $24.89 | $9.09 | $33.98 | May 18, 2026 | GA20260107 Mod 1 |
Franklin CountySHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260010 Mod 1 |
Fulton CountySHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260307 Mod 2 |
Fulton CountySHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION (Buildings up to 100,000 square feet) | $25.49 | $11.73 | $37.22 | Aug 1, 2023 | GA20260039 Mod 1 |
Gilmer CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Gilmer County group | $24.89 | $9.09 | $33.98 | May 18, 2026 | GA20260107 Mod 1 |
Gilmer CountySHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION · Gilmer County group | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260021 Mod 1 |
Glascock CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Bulloch County group | $19.33 | $5.47 | $24.80 | May 18, 2026 | GA20260105 Mod 1 |
Glascock CountySHEET METAL WORKER · Bulloch County group | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260020 Mod 1 |
Glynn CountySHEET METAL WORKER · Glynn County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260315 Mod 2 |
Glynn CountySHEET METAL WORKER · Glynn County group | $7.50 | $0.00 | $7.50 | May 18, 2026 | GA20260046 Mod 1 |
Gordon CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $24.89 | $9.09 | $33.98 | May 18, 2026 | GA20260091 Mod 1 |
Gordon CountySHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260022 Mod 1 |
Grady CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Grady County group | $15.09 | $3.53 | $18.62 | May 18, 2026 | GA20260166 Mod 2 |
Grady CountySHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION · Grady County group | $9.31 | $0.00 | $9.31 | May 18, 2026 | GA20260018 Mod 1 |
Greene CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Hart County group | $24.89 | $9.09 | $33.98 | May 18, 2026 | GA20260104 Mod 1 |
Greene CountySHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION · Hart County group | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260021 Mod 1 |
Gwinnett CountySHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260308 Mod 2 |
Gwinnett CountySHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION (Buildings up to 100,000 square feet) | $25.49 | $11.73 | $37.22 | Aug 1, 2023 | GA20260049 Mod 1 |
Habersham CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $24.89 | $9.09 | $33.98 | May 18, 2026 | GA20260092 Mod 1 |
Habersham CountySHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260011 Mod 1 |
Hall CountySHEET METAL WORKER | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260309 Mod 2 |
Hall CountySHEET METAL WORKER (BUILDINGS UP TO 100,000 SQUARE FEET) | $32.60 | $15.52 | $48.12 | Aug 1, 2023 | GA20260040 Mod 1 |
Hancock CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $19.33 | $5.47 | $24.80 | May 18, 2026 | GA20260105 Mod 1 |
Hancock CountySHEET METAL WORKER | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260023 Mod 1 |
Haralson CountySHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) · Cherokee County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260313 Mod 2 |
Haralson CountySHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION (Buildings up to 100,000 square feet) · Cherokee County group | $25.49 | $11.73 | $37.22 | Aug 1, 2023 | GA20260049 Mod 1 |
Harris CountySHEET METAL WORKER · Harris County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260320 Mod 2 |
Harris CountySHEET METAL WORKER (BUILDINGS UP TO 100,000 SQUARE FEET) · Harris County group | $32.60 | $15.52 | $48.12 | Aug 1, 2023 | GA20260050 Mod 1 |
Hart CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Hart County group | $24.89 | $9.09 | $33.98 | May 18, 2026 | GA20260104 Mod 1 |
Hart CountySHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION · Hart County group | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260021 Mod 1 |
Heard CountySHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) · Cherokee County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260313 Mod 2 |
Heard CountySHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION (Buildings up to 100,000 square feet) · Cherokee County group | $25.49 | $11.73 | $37.22 | Aug 1, 2023 | GA20260049 Mod 1 |
Henry CountySHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) · Cherokee County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260313 Mod 2 |
Henry CountySHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION (Buildings up to 100,000 square feet) · Cherokee County group | $25.49 | $11.73 | $37.22 | Aug 1, 2023 | GA20260049 Mod 1 |
Houston CountySHEET METAL WORKER | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260322 Mod 2 |
Houston CountySHEET METAL WORKER (BUILDINGS UP TO 100,000 SQUARE FEET) | $32.60 | $15.52 | $48.12 | Aug 1, 2023 | GA20260041 Mod 1 |
Irwin CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Pierce County group | $15.09 | $3.53 | $18.62 | May 18, 2026 | GA20260166 Mod 2 |
Irwin CountySHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION · Pierce County group | $9.31 | $0.00 | $9.31 | May 18, 2026 | GA20260018 Mod 1 |
Jackson CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $24.89 | $9.09 | $33.98 | May 18, 2026 | GA20260093 Mod 1 |
Jackson CountySHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260021 Mod 1 |
Jasper CountySHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) · Cherokee County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260313 Mod 2 |
Jasper CountySHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION (Buildings up to 100,000 square feet) · Cherokee County group | $25.49 | $11.73 | $37.22 | Aug 1, 2023 | GA20260049 Mod 1 |
Jeff Davis CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Pierce County group | $15.09 | $3.53 | $18.62 | May 18, 2026 | GA20260166 Mod 2 |
Jeff Davis CountySHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION · Pierce County group | $9.31 | $0.00 | $9.31 | May 18, 2026 | GA20260018 Mod 1 |
Jefferson CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $19.33 | $5.47 | $24.80 | May 18, 2026 | GA20260094 Mod 1 |
Jefferson CountySHEET METAL WORKER | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260023 Mod 1 |
Jenkins CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Bulloch County group | $19.33 | $5.47 | $24.80 | May 18, 2026 | GA20260105 Mod 1 |
Jenkins CountySHEET METAL WORKER · Bulloch County group | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260020 Mod 1 |
Johnson CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Bulloch County group | $19.33 | $5.47 | $24.80 | May 18, 2026 | GA20260105 Mod 1 |
Johnson CountySHEET METAL WORKER · Bulloch County group | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260020 Mod 1 |
Jones CountySHEET METAL WORKER · Monroe County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260314 Mod 2 |
Jones CountySHEET METAL: EXCLUDING HVAC DUCT INSTALLATION: (BUILDINGS OVER 100,000 SQUARE FEET) · Monroe County group | $32.60 | $15.52 | $48.12 | Aug 1, 2023 | GA20260054 Mod 1 |
Lamar CountySHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260313 Mod 2 |
Lamar CountySHEET METAL WORKER (BUILDINGS UP TO 100,000 SQUARE FEET) | $32.60 | $15.52 | $48.12 | Aug 1, 2023 | GA20260042 Mod 1 |
Lanier CountySHEET METAL WORKER · Lowndes County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260316 Mod 2 |
Lanier CountySHEET METAL WORKER (BUILDINGS UP TO 100,000 SQUARE FEET) · Lowndes County group | $32.60 | $15.52 | $48.12 | Aug 1, 2023 | GA20260047 Mod 1 |
Laurens CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $37.75 | $17.95 | $55.70 | Jul 1, 2025 | GA20260095 Mod 2 |
Laurens CountySHEET METAL WORKER | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260019 Mod 1 |
Lee CountySHEET METAL WORKER · Dougherty County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260312 Mod 2 |
Lee CountySHEET METAL WORKER (BUILDINGS UP TO 100,000 SQUARE FEET) · Dougherty County group | $32.60 | $15.52 | $48.12 | Aug 1, 2023 | GA20260052 Mod 1 |
Liberty CountySHEET METAL WORKER · Liberty County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260323 Mod 2 |
Liberty CountySHEET METAL WORKER · Liberty County group | $7.50 | $0.00 | $7.50 | May 18, 2026 | GA20260046 Mod 1 |
Lincoln CountySHEET METAL WORKER | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260318 Mod 2 |
Lincoln CountySHEET METAL WORKER | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260020 Mod 1 |
Long CountySHEET METAL WORKER · Liberty County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260323 Mod 2 |
Long CountySHEET METAL WORKER · Liberty County group | $7.50 | $0.00 | $7.50 | May 18, 2026 | GA20260046 Mod 1 |
Lowndes CountySHEET METAL WORKER · Lowndes County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260316 Mod 2 |
Lowndes CountySHEET METAL WORKER (BUILDINGS UP TO 100,000 SQUARE FEET) · Lowndes County group | $32.60 | $15.52 | $48.12 | Aug 1, 2023 | GA20260047 Mod 1 |
Lumpkin CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $24.89 | $9.09 | $33.98 | May 18, 2026 | GA20260104 Mod 1 |
Lumpkin CountySHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260022 Mod 1 |
Macon CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Sumter County group | $37.75 | $17.95 | $55.70 | Jul 1, 2025 | GA20260106 Mod 2 |
Macon CountySHEET METAL WORKER · Sumter County group | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260019 Mod 1 |
Madison CountySHEET METAL WORKER · Clarke County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260321 Mod 2 |
Madison CountySHEET METAL WORKER (BUILDINGS UP TO 100,000 SQUARE FEET) · Clarke County group | $32.60 | $15.52 | $48.12 | Aug 1, 2023 | GA20260048 Mod 1 |
Marion CountySHEET METAL WORKER · Harris County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260320 Mod 2 |
Marion CountySHEET METAL WORKER (BUILDINGS UP TO 100,000 SQUARE FEET) · Harris County group | $32.60 | $15.52 | $48.12 | Aug 1, 2023 | GA20260050 Mod 1 |
McDuffie CountySHEET METAL WORKER · Columbia County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260318 Mod 2 |
McDuffie CountySHEET METAL WORKER (BUILDINGS UP TO 100,000 SQUARE FEET) · Columbia County group | $32.60 | $15.52 | $48.12 | Aug 1, 2023 | GA20260048 Mod 1 |
McIntosh CountySHEET METAL WORKER | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260315 Mod 2 |
McIntosh CountySHEET METAL WORKER | $7.50 | $0.00 | $7.50 | May 18, 2026 | GA20260043 Mod 1 |
Meriwether CountySHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) · Cherokee County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260313 Mod 2 |
Meriwether CountySHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION (Buildings up to 100,000 square feet) · Cherokee County group | $25.49 | $11.73 | $37.22 | Aug 1, 2023 | GA20260049 Mod 1 |
Miller CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Pierce County group | $15.09 | $3.53 | $18.62 | May 18, 2026 | GA20260166 Mod 2 |
Miller CountySHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION · Pierce County group | $9.31 | $0.00 | $9.31 | May 18, 2026 | GA20260018 Mod 1 |
Mitchell CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Grady County group | $15.09 | $3.53 | $18.62 | May 18, 2026 | GA20260166 Mod 2 |
Mitchell CountySHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION · Grady County group | $9.31 | $0.00 | $9.31 | May 18, 2026 | GA20260018 Mod 1 |
Monroe CountySHEET METAL WORKER · Monroe County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260314 Mod 2 |
Monroe CountySHEET METAL: EXCLUDING HVAC DUCT INSTALLATION: (BUILDINGS OVER 100,000 SQUARE FEET) · Monroe County group | $32.60 | $15.52 | $48.12 | Aug 1, 2023 | GA20260054 Mod 1 |
Montgomery CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Bulloch County group | $19.33 | $5.47 | $24.80 | May 18, 2026 | GA20260105 Mod 1 |
Montgomery CountySHEET METAL WORKER · Bulloch County group | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260020 Mod 1 |
Morgan CountySHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260313 Mod 2 |
Morgan CountySHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260021 Mod 1 |
Murray CountySHEET METAL WORKER · Whitfield County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260324 Mod 2 |
Murray CountySHEET METAL WORKER (BUILDINGS UP TO 100,000 SQUARE FEET) · Whitfield County group | $32.60 | $15.52 | $48.12 | Aug 1, 2023 | GA20260053 Mod 1 |
Muscogee CountySHEET METAL WORKER | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260310 Mod 2 |
Muscogee CountySHEET METAL WORKER (BUILDINGS UP TO 100,000 SQUARE FEET) | $32.60 | $15.52 | $48.12 | Aug 1, 2023 | GA20260050 Mod 1 |
Newton CountySHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) · Cherokee County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260313 Mod 2 |
Newton CountySHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION (Buildings up to 100,000 square feet) · Cherokee County group | $25.49 | $11.73 | $37.22 | Aug 1, 2023 | GA20260049 Mod 1 |
Oconee CountySHEET METAL WORKER · Clarke County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260321 Mod 2 |
Oconee CountySHEET METAL WORKER (BUILDINGS UP TO 100,000 SQUARE FEET) · Clarke County group | $32.60 | $15.52 | $48.12 | Aug 1, 2023 | GA20260048 Mod 1 |
Oglethorpe CountySHEET METAL WORKER · Clarke County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260321 Mod 2 |
Oglethorpe CountySHEET METAL WORKER (BUILDINGS UP TO 100,000 SQUARE FEET) · Clarke County group | $32.60 | $15.52 | $48.12 | Aug 1, 2023 | GA20260048 Mod 1 |
Paulding CountySHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) · Cherokee County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260313 Mod 2 |
Paulding CountySHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION (Buildings up to 100,000 square feet) · Cherokee County group | $25.49 | $11.73 | $37.22 | Aug 1, 2023 | GA20260049 Mod 1 |
Peach CountySHEET METAL WORKER · Peach County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260322 Mod 2 |
Peach CountySHEET METAL WORKER · Peach County group | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260019 Mod 1 |
Pickens CountySHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) · Cherokee County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260313 Mod 2 |
Pickens CountySHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION (Buildings up to 100,000 square feet) · Cherokee County group | $25.49 | $11.73 | $37.22 | Aug 1, 2023 | GA20260049 Mod 1 |
Pierce CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Pierce County group | $15.09 | $3.53 | $18.62 | May 18, 2026 | GA20260166 Mod 2 |
Pierce CountySHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION · Pierce County group | $9.31 | $0.00 | $9.31 | May 18, 2026 | GA20260018 Mod 1 |
Pike CountySHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) · Cherokee County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260313 Mod 2 |
Pike CountySHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION (Buildings up to 100,000 square feet) · Cherokee County group | $25.49 | $11.73 | $37.22 | Aug 1, 2023 | GA20260049 Mod 1 |
Polk CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $24.89 | $9.09 | $33.98 | May 18, 2026 | GA20260097 Mod 1 |
Polk CountySHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260021 Mod 1 |
Pulaski CountySHEET METAL WORKER · Peach County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260322 Mod 2 |
Pulaski CountySHEET METAL WORKER · Peach County group | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260019 Mod 1 |
Putnam CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $37.75 | $17.95 | $55.70 | Jul 1, 2025 | GA20260098 Mod 2 |
Putnam CountySHEET METAL WORKER | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260019 Mod 1 |
Quitman CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $15.09 | $3.53 | $18.62 | May 18, 2026 | GA20260099 Mod 2 |
Quitman CountySHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $9.31 | $0.00 | $9.31 | May 18, 2026 | GA20260018 Mod 1 |
Rabun CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Hart County group | $24.89 | $9.09 | $33.98 | May 18, 2026 | GA20260104 Mod 1 |
Rabun CountySHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION · Hart County group | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260021 Mod 1 |
Randolph CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Grady County group | $15.09 | $3.53 | $18.62 | May 18, 2026 | GA20260166 Mod 2 |
Randolph CountySHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION · Grady County group | $9.31 | $0.00 | $9.31 | May 18, 2026 | GA20260018 Mod 1 |
Richmond CountySHEET METAL WORKER | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260311 Mod 2 |
Richmond CountySHEET METAL WORKER (BUILDINGS UP TO 100,000 SQUARE FEET) | $32.60 | $15.52 | $48.12 | Aug 1, 2023 | GA20260048 Mod 1 |
Rockdale CountySHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260313 Mod 2 |
Rockdale CountySHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION (Buildings up to 100,000 square feet) | $25.49 | $11.73 | $37.22 | Aug 1, 2023 | GA20260044 Mod 1 |
Schley CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Sumter County group | $37.75 | $17.95 | $55.70 | Jul 1, 2025 | GA20260106 Mod 2 |
Schley CountySHEET METAL WORKER · Sumter County group | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260019 Mod 1 |
Screven CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Bulloch County group | $19.33 | $5.47 | $24.80 | May 18, 2026 | GA20260105 Mod 1 |
Screven CountySHEET METAL WORKER · Bulloch County group | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260020 Mod 1 |
Seminole CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Pierce County group | $15.09 | $3.53 | $18.62 | May 18, 2026 | GA20260166 Mod 2 |
Seminole CountySHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION · Pierce County group | $9.31 | $0.00 | $9.31 | May 18, 2026 | GA20260018 Mod 1 |
Spalding CountySHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) · Cherokee County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260313 Mod 2 |
Spalding CountySHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION (Buildings up to 100,000 square feet) · Cherokee County group | $25.49 | $11.73 | $37.22 | Aug 1, 2023 | GA20260049 Mod 1 |
Stephens CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $24.89 | $9.09 | $33.98 | May 18, 2026 | GA20260104 Mod 1 |
Stephens CountySHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260012 Mod 1 |
Stewart CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Sumter County group | $37.75 | $17.95 | $55.70 | Jul 1, 2025 | GA20260106 Mod 2 |
Stewart CountySHEET METAL WORKER · Sumter County group | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260019 Mod 1 |
Sumter CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Sumter County group | $37.75 | $17.95 | $55.70 | Jul 1, 2025 | GA20260106 Mod 2 |
Sumter CountySHEET METAL WORKER · Sumter County group | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260019 Mod 1 |
Talbot CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $37.75 | $17.95 | $55.70 | Jul 1, 2025 | GA20260100 Mod 2 |
Talbot CountySHEET METAL WORKER | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260019 Mod 1 |
Taliaferro CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Bulloch County group | $19.33 | $5.47 | $24.80 | May 18, 2026 | GA20260105 Mod 1 |
Taliaferro CountySHEET METAL WORKER · Bulloch County group | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260020 Mod 1 |
Tattnall CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Bulloch County group | $19.33 | $5.47 | $24.80 | May 18, 2026 | GA20260105 Mod 1 |
Tattnall CountySHEET METAL WORKER · Bulloch County group | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260020 Mod 1 |
Taylor CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Sumter County group | $37.75 | $17.95 | $55.70 | Jul 1, 2025 | GA20260106 Mod 2 |
Taylor CountySHEET METAL WORKER · Sumter County group | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260019 Mod 1 |
Telfair CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $15.09 | $3.53 | $18.62 | May 18, 2026 | GA20260101 Mod 2 |
Telfair CountySHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $9.31 | $0.00 | $9.31 | May 18, 2026 | GA20260018 Mod 1 |
Terrell CountySHEET METAL WORKER · Dougherty County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260312 Mod 2 |
Terrell CountySHEET METAL WORKER (BUILDINGS UP TO 100,000 SQUARE FEET) · Dougherty County group | $32.60 | $15.52 | $48.12 | Aug 1, 2023 | GA20260052 Mod 1 |
Thomas CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $15.09 | $3.53 | $18.62 | May 18, 2026 | GA20260166 Mod 2 |
Thomas CountySHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $9.31 | $0.00 | $9.31 | May 18, 2026 | GA20260013 Mod 1 |
Tift CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $16.28 | $4.63 | $20.91 | May 18, 2026 | GA20260102 Mod 2 |
Tift CountySHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $9.31 | $0.00 | $9.31 | May 18, 2026 | GA20260014 Mod 1 |
Toombs CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Bulloch County group | $19.33 | $5.47 | $24.80 | May 18, 2026 | GA20260105 Mod 1 |
Toombs CountySHEET METAL WORKER · Bulloch County group | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260020 Mod 1 |
Towns CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Hart County group | $24.89 | $9.09 | $33.98 | May 18, 2026 | GA20260104 Mod 1 |
Towns CountySHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION · Hart County group | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260021 Mod 1 |
Treutlen CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Bulloch County group | $19.33 | $5.47 | $24.80 | May 18, 2026 | GA20260105 Mod 1 |
Treutlen CountySHEET METAL WORKER · Bulloch County group | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260020 Mod 1 |
Troup CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $37.75 | $17.95 | $55.70 | Jul 1, 2025 | GA20260103 Mod 2 |
Troup CountySHEET METAL WORKER | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260019 Mod 1 |
Turner CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $15.09 | $3.53 | $18.62 | May 18, 2026 | GA20260108 Mod 2 |
Turner CountySHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $9.31 | $0.00 | $9.31 | May 18, 2026 | GA20260018 Mod 1 |
Twiggs CountySHEET METAL WORKER · Monroe County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260314 Mod 2 |
Twiggs CountySHEET METAL: EXCLUDING HVAC DUCT INSTALLATION: (BUILDINGS OVER 100,000 SQUARE FEET) · Monroe County group | $32.60 | $15.52 | $48.12 | Aug 1, 2023 | GA20260054 Mod 1 |
Union CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Gilmer County group | $24.89 | $9.09 | $33.98 | May 18, 2026 | GA20260107 Mod 1 |
Union CountySHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION · Gilmer County group | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260021 Mod 1 |
Upson CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $37.75 | $17.95 | $55.70 | Jul 1, 2025 | GA20260106 Mod 2 |
Upson CountySHEET METAL WORKER | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260015 Mod 1 |
Walker CountySHEET METAL WORKER · Walker County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260319 Mod 2 |
Walker CountySHEET METAL WORKER · Walker County group | $23.96 | $8.93 | $32.89 | Jun 1, 2010 | GA20260051 Mod 1 |
Walton CountySHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260313 Mod 2 |
Walton CountySHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION (Buildings up to 100,000 square feet) | $25.49 | $11.73 | $37.22 | Aug 1, 2023 | GA20260045 Mod 1 |
Ware CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Ware County group | $15.09 | $3.53 | $18.62 | May 18, 2026 | GA20260108 Mod 2 |
Ware CountySHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION · Ware County group | $9.31 | $0.00 | $9.31 | May 18, 2026 | GA20260018 Mod 1 |
Warren CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Bulloch County group | $19.33 | $5.47 | $24.80 | May 18, 2026 | GA20260105 Mod 1 |
Warren CountySHEET METAL WORKER · Bulloch County group | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260020 Mod 1 |
Washington CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Bulloch County group | $19.33 | $5.47 | $24.80 | May 18, 2026 | GA20260105 Mod 1 |
Washington CountySHEET METAL WORKER · Bulloch County group | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260020 Mod 1 |
Wayne CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Ware County group | $15.09 | $3.53 | $18.62 | May 18, 2026 | GA20260108 Mod 2 |
Wayne CountySHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION · Ware County group | $9.31 | $0.00 | $9.31 | May 18, 2026 | GA20260018 Mod 1 |
Webster CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Sumter County group | $37.75 | $17.95 | $55.70 | Jul 1, 2025 | GA20260106 Mod 2 |
Webster CountySHEET METAL WORKER · Sumter County group | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260019 Mod 1 |
Wheeler CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Bulloch County group | $19.33 | $5.47 | $24.80 | May 18, 2026 | GA20260105 Mod 1 |
Wheeler CountySHEET METAL WORKER · Bulloch County group | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260020 Mod 1 |
White CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $24.89 | $9.09 | $33.98 | May 18, 2026 | GA20260107 Mod 1 |
White CountySHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260016 Mod 1 |
Whitfield CountySHEET METAL WORKER · Whitfield County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260324 Mod 2 |
Whitfield CountySHEET METAL WORKER (BUILDINGS UP TO 100,000 SQUARE FEET) · Whitfield County group | $32.60 | $15.52 | $48.12 | Aug 1, 2023 | GA20260053 Mod 1 |
Wilcox CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Sumter County group | $37.75 | $17.95 | $55.70 | Jul 1, 2025 | GA20260106 Mod 2 |
Wilcox CountySHEET METAL WORKER · Sumter County group | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260019 Mod 1 |
Wilkes CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Bulloch County group | $19.33 | $5.47 | $24.80 | May 18, 2026 | GA20260105 Mod 1 |
Wilkes CountySHEET METAL WORKER · Bulloch County group | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260020 Mod 1 |
Wilkinson CountySHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) · Sumter County group | $37.75 | $17.95 | $55.70 | Jul 1, 2025 | GA20260106 Mod 2 |
Wilkinson CountySHEET METAL WORKER · Sumter County group | $9.73 | $0.00 | $9.73 | May 18, 2026 | GA20260019 Mod 1 |
Worth CountySHEET METAL WORKER · Dougherty County group | $38.29 | $17.40 | $55.69 | Jul 1, 2025 | GA20260312 Mod 2 |
Worth CountySHEET METAL WORKER (BUILDINGS UP TO 100,000 SQUARE FEET) · Dougherty County group | $32.60 | $15.52 | $48.12 | Aug 1, 2023 | GA20260052 Mod 1 |
Main sheet metal worker classification in each county, Davis-Bacon wage determinations on SAM.gov, as of October 25, 2026. A contract keeps the wage determination in its bid documents. Modifications published before bid opening apply to it, though one published less than 10 days before can be left out if the agency finds there isn't time to tell bidders (29 CFR 1.6(c)). Checked October 25, 2026.
How much does a sheet metal worker make on prevailing wage in Georgia?
$18.62 to $55.70 an hour depending on the county; the median county pays $55.69. 20 groups of counties with identical rates and 58 with rates of their own, highest main rate first. The top 40 are drawn.
- Sumter County group11 counties$55.70
- Baldwin County1 county$55.70
- Bleckley County1 county$55.70
- Laurens County1 county$55.70
- Putnam County1 county$55.70
- Talbot County1 county$55.70
- Troup County1 county$55.70
- Upson County1 county$55.70
- Cherokee County group15 counties$55.69
- Clarke County group4 counties$55.69
- Dougherty County group4 counties$55.69
- Lowndes County group4 counties$55.69
- Columbia County group3 counties$55.69
- Harris County group3 counties$55.69
- Monroe County group3 counties$55.69
- Glynn County group2 counties$55.69
- Liberty County group2 counties$55.69
- Peach County group2 counties$55.69
- Walker County group2 counties$55.69
- Whitfield County group2 counties$55.69
- Baker County1 county$55.69
- Barrow County1 county$55.69
- Bartow County1 county$55.69
- Bibb County1 county$55.69
- Bryan County1 county$55.69
- Butts County1 county$55.69
- Catoosa County1 county$55.69
- Chatham County1 county$55.69
- Clayton County1 county$55.69
- Cobb County1 county$55.69
- Crawford County1 county$55.69
- DeKalb County1 county$55.69
- Effingham County1 county$55.69
- Fayette County1 county$55.69
- Floyd County1 county$55.69
- Forsyth County1 county$55.69
- Fulton County1 county$55.69
- Gwinnett County1 county$55.69
- Hall County1 county$55.69
- Houston County1 county$55.69
Which counties share a rate
| Counties | Main classification | Base wage | Total rate |
|---|---|---|---|
| Sumter County group, 11 localities: Crisp, Dodge, Dooly, Macon, Schley, Stewart, Sumter, Taylor, Webster, Wilcox, Wilkinson | SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $37.75 | $55.70 |
| Baldwin County | SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $37.75 | $55.70 |
| Bleckley County | SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $37.75 | $55.70 |
| Laurens County | SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $37.75 | $55.70 |
| Putnam County | SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $37.75 | $55.70 |
| Talbot County | SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $37.75 | $55.70 |
| Troup County | SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $37.75 | $55.70 |
| Upson County | SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $37.75 | $55.70 |
| Cherokee County group, 15 localities: Carroll, Cherokee, Coweta, Dawson, Douglas, Haralson, Heard, Henry, Jasper, Meriwether, Newton, Paulding, Pickens, Pike, Spalding | SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $38.29 | $55.69 |
| Clarke County group, 4 localities: Clarke, Madison, Oconee, Oglethorpe | SHEET METAL WORKER | $38.29 | $55.69 |
| Dougherty County group, 4 localities: Dougherty, Lee, Terrell, Worth | SHEET METAL WORKER | $38.29 | $55.69 |
| Lowndes County group, 4 localities: Brooks, Echols, Lanier, Lowndes | SHEET METAL WORKER | $38.29 | $55.69 |
| Columbia County group, 3 localities: Burke, Columbia, McDuffie | SHEET METAL WORKER | $38.29 | $55.69 |
| Harris County group, 3 localities: Chattahoochee, Harris, Marion | SHEET METAL WORKER | $38.29 | $55.69 |
| Monroe County group, 3 localities: Jones, Monroe, Twiggs | SHEET METAL WORKER | $38.29 | $55.69 |
| Glynn County group, 2 localities: Brantley, Glynn | SHEET METAL WORKER | $38.29 | $55.69 |
| Liberty County group, 2 localities: Liberty, Long | SHEET METAL WORKER | $38.29 | $55.69 |
| Peach County group, 2 localities: Peach, Pulaski | SHEET METAL WORKER | $38.29 | $55.69 |
| Walker County group, 2 localities: Dade, Walker | SHEET METAL WORKER | $38.29 | $55.69 |
| Whitfield County group, 2 localities: Murray, Whitfield | SHEET METAL WORKER | $38.29 | $55.69 |
| Baker County | SHEET METAL WORKER | $38.29 | $55.69 |
| Barrow County | SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $38.29 | $55.69 |
| Bartow County | SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $38.29 | $55.69 |
| Bibb County | SHEET METAL WORKER | $38.29 | $55.69 |
| Bryan County | SHEET METAL WORKER | $38.29 | $55.69 |
| Butts County | SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $38.29 | $55.69 |
| Catoosa County | SHEET METAL WORKER | $38.29 | $55.69 |
| Chatham County | SHEET METAL WORKER | $38.29 | $55.69 |
| Clayton County | SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $38.29 | $55.69 |
| Cobb County | SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $38.29 | $55.69 |
| Crawford County | SHEET METAL WORKER | $38.29 | $55.69 |
| DeKalb County | SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $38.29 | $55.69 |
| Effingham County | SHEET METAL WORKER | $38.29 | $55.69 |
| Fayette County | SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $38.29 | $55.69 |
| Floyd County | SHEET METAL WORKER | $38.29 | $55.69 |
| Forsyth County | SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $38.29 | $55.69 |
| Fulton County | SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $38.29 | $55.69 |
| Gwinnett County | SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $38.29 | $55.69 |
| Hall County | SHEET METAL WORKER | $38.29 | $55.69 |
| Houston County | SHEET METAL WORKER | $38.29 | $55.69 |
| Lamar County | SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $38.29 | $55.69 |
| Lincoln County | SHEET METAL WORKER | $38.29 | $55.69 |
| McIntosh County | SHEET METAL WORKER | $38.29 | $55.69 |
| Morgan County | SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $38.29 | $55.69 |
| Muscogee County | SHEET METAL WORKER | $38.29 | $55.69 |
| Richmond County | SHEET METAL WORKER | $38.29 | $55.69 |
| Rockdale County | SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $38.29 | $55.69 |
| Walton County | SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $38.29 | $55.69 |
| Hart County group, 5 localities: Elbert, Greene, Hart, Rabun, Towns | SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $24.89 | $33.98 |
| Gilmer County group, 3 localities: Fannin, Gilmer, Union | SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $24.89 | $33.98 |
| Banks County | SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $24.89 | $33.98 |
| Chattooga County | SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $24.89 | $33.98 |
| Franklin County | SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $24.89 | $33.98 |
| Gordon County | SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $24.89 | $33.98 |
| Habersham County | SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $24.89 | $33.98 |
| Jackson County | SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $24.89 | $33.98 |
| Lumpkin County | SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $24.89 | $33.98 |
| Polk County | SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $24.89 | $33.98 |
| Stephens County | SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $24.89 | $33.98 |
| White County | SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $24.89 | $33.98 |
| Bulloch County group, 17 localities: Bulloch, Candler, Emanuel, Evans, Glascock, Jenkins, Johnson, Montgomery, Screven, Taliaferro, Tattnall, Toombs, Treutlen, Warren, Washington, Wheeler, Wilkes | SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $19.33 | $24.80 |
| Hancock County | SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $19.33 | $24.80 |
| Jefferson County | SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $19.33 | $24.80 |
| Tift County | SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $16.28 | $20.91 |
| Pierce County group, 11 localities: Atkinson, Bacon, Berrien, Clay, Clinch, Cook, Irwin, Jeff Davis, Miller, Pierce, Seminole | SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $15.09 | $18.62 |
| Grady County group, 4 localities: Calhoun, Grady, Mitchell, Randolph | SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $15.09 | $18.62 |
| Coffee County group, 2 localities: Appling, Coffee | SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $15.09 | $18.62 |
| Ware County group, 2 localities: Ware, Wayne | SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $15.09 | $18.62 |
| Ben Hill County | SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $15.09 | $18.62 |
| Camden County | SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $15.09 | $18.62 |
| Charlton County | SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $15.09 | $18.62 |
| Colquitt County | SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $15.09 | $18.62 |
| Decatur County | SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $15.09 | $18.62 |
| Early County | SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $15.09 | $18.62 |
| Quitman County | SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $15.09 | $18.62 |
| Telfair County | SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $15.09 | $18.62 |
| Thomas County | SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $15.09 | $18.62 |
| Turner County | SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $15.09 | $18.62 |
20 groups of counties with identical DOL rates, and 58 counties with rates of their own.
Questions about Georgia sheet metal worker pay
What is the sheet metal worker prevailing wage in Fulton County?
$55.69 an hour: a $38.29 base wage plus $17.40 in fringe benefits, under wage determination GA20260307, modification 2. Overtime and every sheet metal worker classification in Fulton County.
Does sheet metal worker prevailing wage include fringe benefits?
Yes. In Fulton County the $55.69 total is a $38.29 base wage plus $17.40 in fringe benefits, about 31% of the total. The employer owes the full amount for every hour worked.
Does sheet metal worker prevailing wage pay overtime in Georgia?
Davis-Bacon rates are straight time. On contracts over $100,000, the Contract Work Hours and Safety Standards Act requires 1½ times the basic rate for hours over 40 in a workweek (40 U.S.C. 3702). The fringe is owed for every hour at its straight-time amount.
Do apprentice sheet metal workers get this rate?
Davis-Bacon determinations list journeyworker rates. Apprentices in a program registered with DOL or a recognized state agency can be paid the program's percentage of the rate, within its ratio; anyone else gets the full rate (29 CFR 5.5(a)(4)).
Why do some counties have the same sheet metal worker rate?
DOL often publishes the same sheet metal worker rates for several counties. Across Georgia, the 159 counties with a sheet metal worker rate fall into 78 distinct sets of rates, and 20 of those sets are shared by more than one county; the largest covers 17 counties (the Bulloch County group).