Skip to content

Home / Indiana / St. Joseph County / Asbestos & Lead Abatement Laborer

St. Joseph County, IN · Asbestos & Lead Abatement Laborer

Asbestos & Lead Abatement Laborer prevailing wage in St. Joseph County, Indiana

$72.13an hour, base wage + fringe benefits (our sum)

$41.20 base wage + $30.93 fringe benefits · ASBE0075-001

St. Joseph County uses the same asbestos and lead abatement laborer rates as 1 other county. See all of them on one page.

On federally funded or assisted building, highway and heavy construction in St. Joseph County, an asbestos and lead abatement laborer must be paid at least $72.13 an hour: a $41.20 base wage plus $30.93 in fringe benefits, under wage determination IN20260001 (modification 3). DOL prints no total, so $72.13 is our sum of the two.

Wage determination IN20260001, modification 3, published May 18, 2026, for building, highway and heavy construction; rate identifier ASBE0075-001 (June 1, 2025). Checked against sam.gov on October 25, 2026.

Davis-Bacon is the only prevailing wage here (federally funded or assisted work). Indiana repealed its Common Construction Wage Act effective July 1, 2015, and IC 5-16-7.2-5 bars public agencies from setting wage scales (Indiana DOL).

Base wage and fringe benefits: $41.20 + $30.93

The base wage is the taxable hourly wage. DOL prints the fringe benefits as one hourly figure, not itemized; it can go to health, pension, vacation and training plans, or be paid as cash where the state allows.

Base wage (taxable)$41.20
Fringe benefits (one figure, not itemized)$30.93
Base + fringe benefits (our sum; DOL prints no total)$72.13

When does this rate change?

How St. Joseph County compares

The main asbestos and lead abatement laborer rate in every county that has one, and how the pay splits here and nearby. All bars use the same scale.

Every county in Indiana

$33.10Clark$72.13Elkhart
St. JosephNearby: Marshall $72.13, Elkhart $72.13, Fulton $67.69Each column is a group of counties with about the same main rate; its height is how many. 0 counties pay more than St. Joseph, 11 the same, 80 less.

Wage and fringe benefits, nearby

  1. St. Joseph Countybase $41.20$72.13
  2. Marshall Countybase $41.20$72.13
  3. Elkhart Countybase $41.20$72.13
  4. Fulton Countybase $39.50$67.69

Asbestos & Lead Abatement Laborer rates in nearby counties

Current DOL rates. Davis-Bacon rates are set for groups of counties, so neighbours often share them; the county where the work is done decides.

DOL's asbestos and lead abatement laborer rates for St. Joseph County are the same as in 1 other county: LaPorte.

CountyClassificationBase wageTotal ratevs St. Joseph County
St. Joseph CountyHAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACCUMING, BAGGING, AND DISPOSAL OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS (REMAINING COUNTIES)$41.20 $72.13 
Marshall CountyHAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACCUMING, BAGGING, AND DISPOSAL OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS (REMAINING COUNTIES)$41.20 $72.13 same
Elkhart CountyHAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACCUMING, BAGGING, AND DISPOSAL OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS (REMAINING COUNTIES)$41.20 $72.13 same
LaPorte CountyHAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACCUMING, BAGGING, AND DISPOSAL OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS (REMAINING COUNTIES)$41.20 $72.13 same
Starke CountyHAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACCUMING, BAGGING, AND DISPOSAL OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS (REMAINING COUNTIES)$41.20 $72.13 same
Kosciusko CountyHAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACCUMING, BAGGING, AND DISPOSAL OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS (REMAINING COUNTIES)$41.20 $72.13 same
Fulton CountyHAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACCUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS (CASS, FULTON AND WHITE COUNTIES)$39.50 $67.69 −$4.44

Indiana asbestos and lead abatement laborer prevailing wage by county, with a map

More from DOL on this rate

All St. Joseph County prevailing wage rates

Are you being paid this rate?

Add your base pay to the fringe your employer pays for you, in cash or into plans, and compare the sum with the total. The Department of Labor's Wage and Hour Division takes complaints: 1-866-487-9243, or dol.gov/agencies/whd/contact/complaints.

Source

U.S. Department of Labor, Wage and Hour Division (DOL), wage determination IN20260001 Mod 3, published May 18, 2026: sam.gov/wage-determination/IN20260001/3

We read every active Indiana Davis-Bacon wage determination from SAM.gov's own data and check every number with a second, independent read of the same file. DOL prints no total; ours is base plus fringe. How we check · Download St. Joseph County as CSV · Report an error