Home / Iowa / Insulator (Heat & Frost / Asbestos Worker)
Iowa · Insulator (Heat & Frost / Asbestos Worker)
Iowa insulator prevailing wage, county by county
An insulator's Davis-Bacon prevailing wage in Iowa runs from $19.23 an hour in Wright County to $60.41 in Benton County. The median county is $22.76.
Insulator (Heat & Frost / Asbestos Worker) rate in each Iowa county, A to Z
| County | Base wage | Fringe benefits | Total rate | Effective | Source |
|---|---|---|---|---|---|
Adair CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $18.01 | $4.19 | $22.20 | May 18, 2026 | IA20260029 Mod 1 |
Adams CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $18.01 | $4.19 | $22.20 | May 18, 2026 | IA20260030 Mod 1 |
Allamakee CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $18.09 | $4.67 | $22.76 | May 18, 2026 | IA20260031 Mod 1 |
Appanoose CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $19.04 | $7.32 | $26.36 | May 18, 2026 | IA20260032 Mod 1 |
Audubon CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $18.01 | $4.19 | $22.20 | May 18, 2026 | IA20260033 Mod 1 |
Benton CountyASBESTOS WORKER/HEAT & FROST INSULATOR · Benton County group | $36.06 | $24.35 | $60.41 | Jun 1, 2025 | IA20260078 Mod 1 |
Black Hawk CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $23.28 | $8.91 | $32.19 | May 18, 2026 | IA20260062 Mod 1 |
Boone CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $18.01 | $4.19 | $22.20 | May 18, 2026 | IA20260034 Mod 1 |
Bremer CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $23.28 | $8.91 | $32.19 | May 18, 2026 | IA20260063 Mod 1 |
Buchanan CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Buchanan County group | $18.09 | $4.67 | $22.76 | May 18, 2026 | IA20260080 Mod 1 |
Buena Vista CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Plymouth County group | $16.35 | $2.88 | $19.23 | May 18, 2026 | IA20260057 Mod 1 |
Butler CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Buchanan County group | $18.09 | $4.67 | $22.76 | May 18, 2026 | IA20260080 Mod 1 |
Calhoun CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Plymouth County group | $16.35 | $2.88 | $19.23 | May 18, 2026 | IA20260057 Mod 1 |
Carroll CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $18.01 | $4.19 | $22.20 | May 18, 2026 | IA20260035 Mod 1 |
Cass CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Cass County group | $18.01 | $4.19 | $22.20 | May 18, 2026 | IA20260058 Mod 1 |
Cedar CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $19.04 | $7.32 | $26.36 | May 18, 2026 | IA20260036 Mod 1 |
Cerro Gordo CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $17.68 | $4.36 | $22.04 | May 18, 2026 | IA20260037 Mod 1 |
Cherokee CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Plymouth County group | $16.35 | $2.88 | $19.23 | May 18, 2026 | IA20260057 Mod 1 |
Chickasaw CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Buchanan County group | $18.09 | $4.67 | $22.76 | May 18, 2026 | IA20260080 Mod 1 |
Clarke CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Cass County group | $18.01 | $4.19 | $22.20 | May 18, 2026 | IA20260058 Mod 1 |
Clay CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Plymouth County group | $16.35 | $2.88 | $19.23 | May 18, 2026 | IA20260057 Mod 1 |
Clayton CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Delaware County group | $18.09 | $4.67 | $22.76 | May 18, 2026 | IA20260059 Mod 1 |
Clinton CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $19.04 | $7.32 | $26.36 | May 18, 2026 | IA20260038 Mod 1 |
Crawford CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $18.01 | $4.19 | $22.20 | May 18, 2026 | IA20260039 Mod 2 |
Dallas CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $18.45 | $4.04 | $22.49 | May 18, 2026 | IA20260064 Mod 1 |
Davis CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $19.04 | $7.32 | $26.36 | May 18, 2026 | IA20260040 Mod 1 |
Decatur CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Shelby County group | $18.01 | $4.19 | $22.20 | May 18, 2026 | IA20260060 Mod 1 |
Delaware CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Delaware County group | $18.09 | $4.67 | $22.76 | May 18, 2026 | IA20260059 Mod 1 |
Des Moines CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $19.04 | $7.32 | $26.36 | May 18, 2026 | IA20260041 Mod 1 |
Dickinson CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $16.35 | $2.88 | $19.23 | May 18, 2026 | IA20260042 Mod 1 |
Dubuque CountyASBESTOS WORKER/HEAT & FROST INSULATOR | $36.06 | $24.35 | $60.41 | Jun 1, 2025 | IA20260065 Mod 1 |
Emmet CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Plymouth County group | $16.35 | $2.88 | $19.23 | May 18, 2026 | IA20260057 Mod 1 |
Fayette CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Buchanan County group | $18.09 | $4.67 | $22.76 | May 18, 2026 | IA20260080 Mod 1 |
Floyd CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $18.09 | $4.67 | $22.76 | May 18, 2026 | IA20260043 Mod 1 |
Franklin CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Buchanan County group | $18.09 | $4.67 | $22.76 | May 18, 2026 | IA20260080 Mod 1 |
Fremont CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Shelby County group | $18.01 | $4.19 | $22.20 | May 18, 2026 | IA20260060 Mod 1 |
Greene CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Shelby County group | $18.01 | $4.19 | $22.20 | May 18, 2026 | IA20260060 Mod 1 |
Grundy CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $23.28 | $8.91 | $32.19 | May 18, 2026 | IA20260066 Mod 1 |
Guthrie CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Madison County group | $18.45 | $4.04 | $22.49 | May 18, 2026 | IA20260079 Mod 1 |
Hamilton CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Plymouth County group | $16.35 | $2.88 | $19.23 | May 18, 2026 | IA20260057 Mod 1 |
Hancock CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Plymouth County group | $16.35 | $2.88 | $19.23 | May 18, 2026 | IA20260057 Mod 1 |
Hardin CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Buchanan County group | $18.09 | $4.67 | $22.76 | May 18, 2026 | IA20260080 Mod 1 |
Harrison CountyASBESTOS WORKER/HEAT & FROST INSULATOR | $38.26 | $20.54 | $58.80 | Jun 28, 2024 | IA20260067 Mod 1 |
Henry CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Mahaska County group | $19.04 | $7.32 | $26.36 | May 18, 2026 | IA20260061 Mod 1 |
Howard CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $18.09 | $4.67 | $22.76 | May 18, 2026 | IA20260044 Mod 1 |
Humboldt CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Plymouth County group | $16.35 | $2.88 | $19.23 | May 18, 2026 | IA20260057 Mod 1 |
Ida CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Plymouth County group | $16.35 | $2.88 | $19.23 | May 18, 2026 | IA20260057 Mod 1 |
Iowa CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $19.04 | $7.32 | $26.36 | May 18, 2026 | IA20260045 Mod 1 |
Jackson CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Mahaska County group | $19.04 | $7.32 | $26.36 | May 18, 2026 | IA20260061 Mod 1 |
Jasper CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $19.04 | $7.32 | $26.36 | May 18, 2026 | IA20260046 Mod 1 |
Jefferson CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Mahaska County group | $19.04 | $7.32 | $26.36 | May 18, 2026 | IA20260061 Mod 1 |
Johnson CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $16.20 | $8.14 | $24.34 | May 18, 2026 | IA20260068 Mod 1 |
Jones CountyASBESTOS WORKER/HEAT & FROST INSULATOR · Benton County group | $36.06 | $24.35 | $60.41 | Jun 1, 2025 | IA20260078 Mod 1 |
Keokuk CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Mahaska County group | $19.04 | $7.32 | $26.36 | May 18, 2026 | IA20260061 Mod 1 |
Kossuth CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Plymouth County group | $16.35 | $2.88 | $19.23 | May 18, 2026 | IA20260057 Mod 1 |
Lee CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $19.04 | $7.32 | $26.36 | May 18, 2026 | IA20260047 Mod 1 |
Linn CountyASBESTOS WORKER/HEAT & FROST INSULATOR | $36.06 | $24.35 | $60.41 | Jun 1, 2025 | IA20260069 Mod 1 |
Louisa CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Mahaska County group | $19.04 | $7.32 | $26.36 | May 18, 2026 | IA20260061 Mod 1 |
Lucas CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Shelby County group | $18.01 | $4.19 | $22.20 | May 18, 2026 | IA20260060 Mod 1 |
Lyon CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Plymouth County group | $16.35 | $2.88 | $19.23 | May 18, 2026 | IA20260057 Mod 1 |
Madison CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Madison County group | $18.45 | $4.04 | $22.49 | May 18, 2026 | IA20260079 Mod 1 |
Mahaska CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Mahaska County group | $19.04 | $7.32 | $26.36 | May 18, 2026 | IA20260061 Mod 1 |
Marion CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $19.04 | $7.32 | $26.36 | May 18, 2026 | IA20260048 Mod 1 |
Marshall CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $19.04 | $7.32 | $26.36 | May 18, 2026 | IA20260049 Mod 1 |
Mills CountyASBESTOS WORKER/HEAT & FROST INSULATOR | $38.26 | $20.54 | $58.80 | Jun 28, 2024 | IA20260070 Mod 1 |
Mitchell CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Buchanan County group | $18.09 | $4.67 | $22.76 | May 18, 2026 | IA20260080 Mod 1 |
Monona CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Shelby County group | $18.01 | $4.19 | $22.20 | May 18, 2026 | IA20260060 Mod 1 |
Monroe CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Mahaska County group | $19.04 | $7.32 | $26.36 | May 18, 2026 | IA20260061 Mod 1 |
Montgomery CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Shelby County group | $18.01 | $4.19 | $22.20 | May 18, 2026 | IA20260060 Mod 1 |
Muscatine CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $24.80 | $10.17 | $34.97 | May 18, 2026 | IA20260050 Mod 1 |
O'Brien CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Plymouth County group | $16.35 | $2.88 | $19.23 | May 18, 2026 | IA20260057 Mod 1 |
Osceola CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Plymouth County group | $16.35 | $2.88 | $19.23 | May 18, 2026 | IA20260057 Mod 1 |
Page CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $18.01 | $4.19 | $22.20 | May 18, 2026 | IA20260051 Mod 1 |
Palo Alto CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Plymouth County group | $16.35 | $2.88 | $19.23 | May 18, 2026 | IA20260057 Mod 1 |
Plymouth CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Plymouth County group | $16.35 | $2.88 | $19.23 | May 18, 2026 | IA20260057 Mod 1 |
Pocahontas CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Plymouth County group | $16.35 | $2.88 | $19.23 | May 18, 2026 | IA20260057 Mod 1 |
Polk CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $18.17 | $4.01 | $22.18 | May 18, 2026 | IA20260071 Mod 1 |
Pottawattamie CountyASBESTOS WORKER/HEAT & FROST INSULATOR | $38.26 | $20.54 | $58.80 | Jun 28, 2024 | IA20260072 Mod 1 |
Poweshiek CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $19.04 | $7.32 | $26.36 | May 18, 2026 | IA20260052 Mod 1 |
Ringgold CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Shelby County group | $18.01 | $4.19 | $22.20 | May 18, 2026 | IA20260060 Mod 1 |
Sac CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Plymouth County group | $16.35 | $2.88 | $19.23 | May 18, 2026 | IA20260057 Mod 1 |
Scott CountyASBESTOS WORKER/HEAT & FROST INSULATOR | $36.06 | $24.35 | $60.41 | Jun 1, 2025 | IA20260073 Mod 1 |
Shelby CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Shelby County group | $18.01 | $4.19 | $22.20 | May 18, 2026 | IA20260060 Mod 1 |
Sioux CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $16.35 | $2.88 | $19.23 | May 18, 2026 | IA20260053 Mod 1 |
Story CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $18.16 | $3.94 | $22.10 | May 18, 2026 | IA20260074 Mod 1 |
Tama CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Mahaska County group | $19.04 | $7.32 | $26.36 | May 18, 2026 | IA20260061 Mod 1 |
Taylor CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Shelby County group | $18.01 | $4.19 | $22.20 | May 18, 2026 | IA20260060 Mod 1 |
Union CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $18.01 | $4.19 | $22.20 | May 18, 2026 | IA20260054 Mod 1 |
Van Buren CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Mahaska County group | $19.04 | $7.32 | $26.36 | May 18, 2026 | IA20260061 Mod 1 |
Wapello CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $19.04 | $7.32 | $26.36 | May 18, 2026 | IA20260055 Mod 1 |
Warren CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $18.45 | $4.04 | $22.49 | May 18, 2026 | IA20260075 Mod 1 |
Washington CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $16.70 | $8.12 | $24.82 | May 18, 2026 | IA20260076 Mod 1 |
Wayne CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Shelby County group | $18.01 | $4.19 | $22.20 | May 18, 2026 | IA20260060 Mod 1 |
Webster CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $16.35 | $2.88 | $19.23 | May 18, 2026 | IA20260056 Mod 1 |
Winnebago CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Plymouth County group | $16.35 | $2.88 | $19.23 | May 18, 2026 | IA20260057 Mod 1 |
Winneshiek CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Buchanan County group | $18.09 | $4.67 | $22.76 | May 18, 2026 | IA20260080 Mod 1 |
Woodbury CountyINSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $23.50 | $8.25 | $31.75 | May 18, 2026 | IA20260077 Mod 1 |
Worth CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Buchanan County group | $18.09 | $4.67 | $22.76 | May 18, 2026 | IA20260080 Mod 1 |
Wright CountyINSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) · Plymouth County group | $16.35 | $2.88 | $19.23 | May 18, 2026 | IA20260057 Mod 1 |
Main insulator classification in each county, Davis-Bacon wage determinations on SAM.gov, as of October 25, 2026. A contract keeps the wage determination in its bid documents. Modifications published before bid opening apply to it, though one published less than 10 days before can be left out if the agency finds there isn't time to tell bidders (29 CFR 1.6(c)). Checked October 25, 2026.
How much does an insulator make on prevailing wage in Iowa?
$19.23 to $60.41 an hour depending on the county; the median county pays $22.76. 8 groups of counties with identical rates and 44 with rates of their own, highest main rate first. The top 40 are drawn.
- Benton County group2 counties$60.41
- Dubuque County1 county$60.41
- Linn County1 county$60.41
- Scott County1 county$60.41
- Harrison County1 county$58.80
- Mills County1 county$58.80
- Pottawattamie County1 county$58.80
- Muscatine County1 county$34.97
- Black Hawk County1 county$32.19
- Bremer County1 county$32.19
- Grundy County1 county$32.19
- Woodbury County1 county$31.75
- Mahaska County group9 counties$26.36
- Appanoose County1 county$26.36
- Cedar County1 county$26.36
- Clinton County1 county$26.36
- Davis County1 county$26.36
- Des Moines County1 county$26.36
- Iowa County1 county$26.36
- Jasper County1 county$26.36
- Lee County1 county$26.36
- Marion County1 county$26.36
- Marshall County1 county$26.36
- Poweshiek County1 county$26.36
- Wapello County1 county$26.36
- Washington County1 county$24.82
- Johnson County1 county$24.34
- Buchanan County group9 counties$22.76
- Delaware County group2 counties$22.76
- Allamakee County1 county$22.76
- Floyd County1 county$22.76
- Howard County1 county$22.76
- Madison County group2 counties$22.49
- Dallas County1 county$22.49
- Warren County1 county$22.49
- Shelby County group10 counties$22.20
- Cass County group2 counties$22.20
- Adair County1 county$22.20
- Adams County1 county$22.20
- Audubon County1 county$22.20
Which counties share a rate
| Counties | Main classification | Base wage | Total rate |
|---|---|---|---|
| Benton County group, 2 localities: Benton, Jones | ASBESTOS WORKER/HEAT & FROST INSULATOR | $36.06 | $60.41 |
| Dubuque County | ASBESTOS WORKER/HEAT & FROST INSULATOR | $36.06 | $60.41 |
| Linn County | ASBESTOS WORKER/HEAT & FROST INSULATOR | $36.06 | $60.41 |
| Scott County | ASBESTOS WORKER/HEAT & FROST INSULATOR | $36.06 | $60.41 |
| Harrison County | ASBESTOS WORKER/HEAT & FROST INSULATOR | $38.26 | $58.80 |
| Mills County | ASBESTOS WORKER/HEAT & FROST INSULATOR | $38.26 | $58.80 |
| Pottawattamie County | ASBESTOS WORKER/HEAT & FROST INSULATOR | $38.26 | $58.80 |
| Muscatine County | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $24.80 | $34.97 |
| Black Hawk County | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $23.28 | $32.19 |
| Bremer County | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $23.28 | $32.19 |
| Grundy County | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $23.28 | $32.19 |
| Woodbury County | INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $23.50 | $31.75 |
| Mahaska County group, 9 localities: Henry, Jackson, Jefferson, Keokuk, Louisa, Mahaska, Monroe, Tama, Van Buren | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $19.04 | $26.36 |
| Appanoose County | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $19.04 | $26.36 |
| Cedar County | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $19.04 | $26.36 |
| Clinton County | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $19.04 | $26.36 |
| Davis County | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $19.04 | $26.36 |
| Des Moines County | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $19.04 | $26.36 |
| Iowa County | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $19.04 | $26.36 |
| Jasper County | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $19.04 | $26.36 |
| Lee County | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $19.04 | $26.36 |
| Marion County | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $19.04 | $26.36 |
| Marshall County | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $19.04 | $26.36 |
| Poweshiek County | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $19.04 | $26.36 |
| Wapello County | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $19.04 | $26.36 |
| Washington County | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $16.70 | $24.82 |
| Johnson County | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $16.20 | $24.34 |
| Buchanan County group, 9 localities: Buchanan, Butler, Chickasaw, Fayette, Franklin, Hardin, Mitchell, Winneshiek, Worth | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $18.09 | $22.76 |
| Delaware County group, 2 localities: Clayton, Delaware | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $18.09 | $22.76 |
| Allamakee County | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $18.09 | $22.76 |
| Floyd County | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $18.09 | $22.76 |
| Howard County | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $18.09 | $22.76 |
| Madison County group, 2 localities: Guthrie, Madison | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $18.45 | $22.49 |
| Dallas County | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $18.45 | $22.49 |
| Warren County | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $18.45 | $22.49 |
| Shelby County group, 10 localities: Decatur, Fremont, Greene, Lucas, Monona, Montgomery, Ringgold, Shelby, Taylor, Wayne | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $18.01 | $22.20 |
| Cass County group, 2 localities: Cass, Clarke | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $18.01 | $22.20 |
| Adair County | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $18.01 | $22.20 |
| Adams County | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $18.01 | $22.20 |
| Audubon County | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $18.01 | $22.20 |
| Boone County | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $18.01 | $22.20 |
| Carroll County | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $18.01 | $22.20 |
| Crawford County | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $18.01 | $22.20 |
| Page County | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $18.01 | $22.20 |
| Union County | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $18.01 | $22.20 |
| Polk County | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $18.17 | $22.18 |
| Story County | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $18.16 | $22.10 |
| Cerro Gordo County | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $17.68 | $22.04 |
| Plymouth County group, 19 localities: Buena Vista, Calhoun, Cherokee, Clay, Emmet, Hamilton, Hancock, Humboldt, Ida, Kossuth, Lyon, O'Brien, Osceola, Palo Alto, Plymouth, Pocahontas, Sac, Winnebago, Wright | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $16.35 | $19.23 |
| Dickinson County | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $16.35 | $19.23 |
| Sioux County | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $16.35 | $19.23 |
| Webster County | INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $16.35 | $19.23 |
8 groups of counties with identical DOL rates, and 44 counties with rates of their own.
Questions about Iowa insulator pay
What is the insulator prevailing wage in Polk County?
$22.18 an hour: a $18.17 base wage plus $4.01 in fringe benefits, under wage determination IA20260071, modification 1. Overtime and every insulator classification in Polk County.
Does insulator prevailing wage include fringe benefits?
Yes. In Polk County the $22.18 total is a $18.17 base wage plus $4.01 in fringe benefits, about 18% of the total. The employer owes the full amount for every hour worked.
Does insulator prevailing wage pay overtime in Iowa?
Davis-Bacon rates are straight time. On contracts over $100,000, the Contract Work Hours and Safety Standards Act requires 1½ times the basic rate for hours over 40 in a workweek (40 U.S.C. 3702). The fringe is owed for every hour at its straight-time amount.
Do apprentice insulators get this rate?
Davis-Bacon determinations list journeyworker rates. Apprentices in a program registered with DOL or a recognized state agency can be paid the program's percentage of the rate, within its ratio; anyone else gets the full rate (29 CFR 5.5(a)(4)).
Why do some counties have the same insulator rate?
DOL often publishes the same insulator rates for several counties. Across Iowa, the 99 counties with an insulator rate fall into 52 distinct sets of rates, and 8 of those sets are shared by more than one county; the largest covers 19 counties (the Plymouth County group).