Home / New York / Putnam County / Operating Engineer
Putnam County, NY · Operating Engineer
Operating Engineer prevailing wage in Putnam County, New York
$96.62an hour, wage + supplements · GROUP I-A
$62.20 wage + $34.42 supplements
Putnam County uses the same operating engineer rates as 1 other county. See all of them on one page.
On New York public works in Putnam County, an operating engineer working as group i-a must be paid at least $96.62 an hour: a $62.20 base wage plus $34.42 in supplements. NYSDOL prints no total, so $96.62 is our sum of the two.
2026-27 schedules, with the October 1, 2026 updates; this rate, effective July 1, 2026. New York doesn't lock rates at bid: contractors pay the current prevailing rate, including the dated steps in the schedule, and monthly corrections retroactive to July 1 (NYSDOL). Checked against dol.ny.gov on October 25, 2026.
NYSDOL lists 50 operating engineer rates for Putnam County, from $74.22 to $129.46 an hour. See all of them.
NYSDOL's posted schedules are informational. An original schedule must be requested for each project (PRC number).
Base wage and supplements: $62.20 + $34.42
The base wage is the taxable hourly wage. NYSDOL prints the supplements as one hourly figure, not itemized; it can go to health, pension, vacation and training plans, or be paid as cash where the state allows.
| Base wage (taxable) | $62.20 |
| Fringe benefits (one figure, not itemized) | $34.42 |
| Base + supplements (our sum; NYSDOL prints no total) | $96.62 |
Davis-Bacon operating engineer rate in Putnam County
Federally funded or assisted construction here uses the U.S. Department of Labor's wage determinations. When a contract requires both the state rate and the Davis-Bacon rate, paying the higher of the two meets both. The contract documents say which apply.
We don't put a federal figure next to NYSDOL's here, because the federal determinations split this trade into groups that don't line up with NYSDOL's. The federal rows for this trade are below; match the classification to the work.
| Construction | Federal classification | Base + fringe | Base | WD |
|---|---|---|---|---|
| Building, Highway, Heavy | POWER EQUIPMENT OPERATORS: GROUP 6 (BUILDING CONSTRUCTION) WAREHOUSE MAN NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM .50 CRANE OPERATORS …ENGI0137-003 | $80.58 | $49.26 | NY20260025 Mod 2 |
| Building, Highway, Heavy | POWER EQUIPMENT OPERATORS: GROUP 5-B (BUILDING CONSTRUCTION) UTILITY MAN NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM .50 CRANE OPERATORS …ENGI0137-003 | $78.32 | $47.00 | NY20260025 Mod 2 |
| Building, Highway, Heavy | POWER EQUIPMENT OPERATORS: GROUP 5-A (BUILDING CONSTRUCTION) MASTER MECHANIC NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM .50 CRANE …ENGI0137-003 | $93.27 | $61.95 | NY20260025 Mod 2 |
| Building, Highway, Heavy | POWER EQUIPMENT OPERATORS: GROUP 5 (BUILDING CONSTRUCTION) MOTORIZED ROLLER (WALK BEHIND) NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM .50 …ENGI0137-003 | $80.85 | $49.53 | NY20260025 Mod 2 |
| Building, Highway, Heavy | POWER EQUIPMENT OPERATORS: GROUP 4-B (BUILDING CONSTRUCTION) COMPRESSOR TO 125 FEET; DUST; DUST COLLECTOR; HEATER ALL TYPES; PUMP; PUMP STATION (WATER AND …ENGI0137-003 | $77.26 | $45.94 | NY20260025 Mod 2 |
| Building, Highway, Heavy | POWER EQUIPMENT OPERATORS: GROUP 4-A (BUILDING CONSTRUCTION) AIR TRACTOR DRILL; BATCH PLANT; BENDING MACHINE; CONCRETE BREAKER; CONCRETE SPREADER; CURB CUTTER …ENGI0137-003 | $85.65 | $54.33 | NY20260025 Mod 2 |
| Building, Highway, Heavy | POWER EQUIPMENT OPERATORS: GROUP 3-B (BUILDING CONSTRUCTION) COMPRESSOR OVER 125 CU. FEET; CONVEYOR BELT MACHINE REGARDLESS OF SIZE; LIGHTING UNIT (PORTABLE & …ENGI0137-003 | $83.57 | $52.25 | NY20260025 Mod 2 |
| Building, Highway, Heavy | POWER EQUIPMENT OPERATORS: GROUP 2-A (BUILDING CONSTRUCTION) COMPACTOR SELF-PROPELLED; GRADER; BULLDOZE D7 AND SIMILAR TRACTORS WITH A DRAW BAR HORSEPOWER OF …ENGI0137-003 | $88.29 | $56.97 | NY20260025 Mod 2 |
| Building, Highway, Heavy | POWER EQUIPMENT OPERATORS: GROUP 1-B (BUILDING CONSTRUCTION) COMPRESSOR (STEEL ERECTION); PULSE METER AND PUSH BUTTON BUZZ BOX; ELEVATOR; MECHANIC (OUTSIDE) …ENGI0137-003 | $85.73 | $54.41 | NY20260025 Mod 2 |
| Building, Highway, Heavy | POWER EQUIPMENT OPERATORS: GROUP 1-A (BUILDING CONSTRUCTION) CARRIER- TRAILER HORSE; CONCRET-PORTABLE HOIST; CRANE & HOIST ENGINEER-STEEL (CONCRETE, MATERIAL, …ENGI0137-003 | $90.36 | $59.04 | NY20260025 Mod 2 |
| Building, Highway, Heavy | POWER EQUIPMENT OPERATORS: GROUP 5-A-5 JERSEY-SPREADER, PAVEMENT BREAKER (AIR RAM); POST HOLE DIGGER (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS) …ENGI0137-006 | $94.44 | $59.19 | NY20260025 Mod 2 |
| Building, Highway, Heavy | POWER EQUIPMENT OPERATORS: GROUP 5-A-4 HOIST ENGINEER- STEEL -SUB STRUCTURE (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER …ENGI0137-006 | $105.66 | $70.41 | NY20260025 Mod 2 |
| Building, Highway, Heavy | POWER EQUIPMENT OPERATORS: GROUP 5-A-2 ENGINEER - ALL TOWER CRANES, ALL CLIMBING CRANES AND ALL CRANES OF 100 TON CAPACITY OR GREATER (3900 MANITOWAC OR …ENGI0137-006 | $113.07 | $77.82 | NY20260025 Mod 2 |
| Building, Highway, Heavy | POWER EQUIPMENT OPERATORS: GROUP 5-A-1 MASTER MECHANIC (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT …ENGI0137-006 | $99.27 | $64.02 | NY20260025 Mod 2 |
| Building, Highway, Heavy | POWER EQUIPMENT OPERATORS: GROUP 5 OILER (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER …ENGI0137-006 | $99.27 | $64.02 | NY20260025 Mod 2 |
| Building, Highway, Heavy | POWER EQUIPMENT OPERATORS: GROUP 4-B OILER; COMPRESSOR - COMPRESSOR PLANT; PAINT COMPRESSOR-STEEL ERECTION; CONVEYOR BELT MACHINE; LIGHTING UNIT (PORTABLE & …ENGI0137-006 | $79.44 | $44.19 | NY20260025 Mod 2 |
| Building, Highway, Heavy | POWER EQUIPMENT OPERATORS: GROUP 3 A: AIR TRACTOR DRILL; ASPHALT PLANT; BATCH PLANT; BOILER (HIGH PRESSURE; CONCRETE BREAKER; CONCRETE PUMP CONCRETE SPREADER; …ENGI0137-006 | $92.06 | $56.81 | NY20260025 Mod 2 |
| Building, Highway, Heavy | POWER EQUIPMENT OPERATORS: GROUP 2-B MECHANIC (OUTSIDE) ALL TYPES (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) …ENGI0137-006 | $94.92 | $59.67 | NY20260025 Mod 2 |
| Building, Highway, Heavy | POWER EQUIPMENT OPERATORS: GROUP 2-A BALLAST REGULATORS; COMPACTOR SELF-PROPELLED; COW TRACKS; FUSION MACHINE; RAIL ANCHOR MACHINES; ROLLER 4 TON AND OVER; …ENGI0137-006 | $93.09 | $57.84 | NY20260025 Mod 2 |
| Building, Highway, Heavy | POWER EQUIPMENT OPERATORS: GROUP 1-B ROAD PAVER, ASPHALT (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 …ENGI0137-006 | $98.95 | $63.70 | NY20260025 Mod 2 |
| Residential | OPERATOR: LOADERSUNY2013-022 | $49.28 | $27.88 | NY20260094 Mod 1 |
| Residential | OPERATOR: BULLDOZERSUNY2013-022 | $21.20 | $21.20 | NY20260094 Mod 1 |
| Residential | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOESUNY2013-022 | $45.65 | $29.76 | NY20260094 Mod 1 |
Davis-Bacon rates from SAM.gov, read October 25, 2026. Our federal totals are base plus fringe; DOL prints no total. New York Davis-Bacon changes
Dated rates for this classification
NYSDOL prints more than one dated line for Operating Engineer - Building: GROUP I-A. The one in force on October 25, 2026 leads this page; scheduled lines take effect on their date.
| Effective | Rate | Status |
|---|---|---|
| Jul 1, 2026 | Wage $62.20 | In force |
| Mar 1, 2027 | Wage $63.80 | Scheduled |
When this rate changes
- New York rates aren't locked at bid. Each rate stays until its next printed effective date or the new annual determination on July 1, and contractors must pay the current rate (Article 8 schedules).
- NYSDOL posts error corrections and updates on the first business day of each month, and contractors pay them "retroactive to July 1" (NYSDOL). This page uses the 2026-27 schedules with the October 1, 2026 updates.
Every operating engineer rate in Putnam County
As NYSDOL lists them. The highlighted row is the one this page leads with.
| Classification | Wage + supplements | Base | Supplements | Effective |
|---|---|---|---|---|
| Operating Engineer - Building: GROUP I Cranes- up to 49 tons | $105.61 | $71.19 | $34.42 | Jul 1, 2026 |
| Operating Engineer - Building: Cranes- 50 tons to 99 tons (GROUP I) | $108.11 | $73.69 | $34.42 | Jul 1, 2026 |
| Operating Engineer - Building: Cranes- 100 tons and over (GROUP I) | $118.69 | $84.27 | $34.42 | Jul 1, 2026 |
| Operating Engineer - Building: GROUP I-A | $96.62 | $62.20 | $34.42 | Jul 1, 2026 |
| Operating Engineer - Building: GROUP I-B | $91.66 | $57.24 | $34.42 | Jul 1, 2026 |
| Operating Engineer - Building: GROUP II | $94.40 | $59.98 | $34.42 | Jul 1, 2026 |
| Operating Engineer - Building: GROUP III-A | $92.17 | $57.75 | $34.42 | Jul 1, 2026 |
| Operating Engineer - Building: GROUP III-B | $89.35 | $54.93 | $34.42 | Jul 1, 2026 |
| Operating Engineer - Building: GROUP IV-A | $91.58 | $57.16 | $34.42 | Jul 1, 2026 |
| Operating Engineer - Building: GROUP IV-B | $82.59 | $48.17 | $34.42 | Jul 1, 2026 |
| Operating Engineer - Building: GROUP V (GROUP I) | $86.43 | $52.01 | $34.42 | Jul 1, 2026 |
| Operating Engineer - Building: Group VI-A (GROUP I) | $95.47 | $61.05 | $34.42 | Jul 1, 2026 |
| Operating Engineer - Building: GROUP VI-B Utility Man (GROUP I) | $83.72 | $49.30 | $34.42 | Jul 1, 2026 |
| Operating Engineer - Building: Warehouse Man (GROUP I) | $86.14 | $51.72 | $34.42 | Jul 1, 2026 |
| Operating Engineer - Building: Party Chief (Building Construction) | $120.64 | $81.94 | $38.70 | — |
| Operating Engineer - Building: Instrument Man (Building Construction) | $99.19 | $60.49 | $38.70 | — |
| Operating Engineer - Building: Rodman (Building Construction) | $79.33 | $40.63 | $38.70 | — |
| Operating Engineer - Building: Party Chief (Steel Erection) | $124.53 | $84.04 | $40.49 | — |
| Operating Engineer - Building: Instrument Man (Steel Erection) | $103.68 | $63.19 | $40.49 | — |
| Operating Engineer - Building: Rodman (Steel Erection) | $83.80 | $43.31 | $40.49 | — |
| Operating Engineer - Building: (Foundation, Excavation.) Party Chief (Steel Erection) | $129.46 | $88.97 | $40.49 | — |
| Operating Engineer - Building: Instrument man (Steel Erection) | $106.53 | $66.04 | $40.49 | — |
| Operating Engineer - Building: Rodman (Steel Erection) | $96.34 | $55.85 | $40.49 | — |
| Operating Engineer - Heavy&Highway: Group I | $100.40 | $72.77 | $27.63 | — |
| Operating Engineer - Heavy&Highway: Group I-A | $91.60 | $63.97 | $27.63 | — |
| Operating Engineer - Heavy&Highway: Group I-B | $95.12 | $67.49 | $27.63 | — |
| Operating Engineer - Heavy&Highway: Group II-A | $88.84 | $61.21 | $27.63 | — |
| Operating Engineer - Heavy&Highway: Group II-B | $90.80 | $63.17 | $27.63 | — |
| Operating Engineer - Heavy&Highway: Group III | $87.75 | $60.12 | $27.63 | — |
| Operating Engineer - Heavy&Highway: Group IV | $82.12 | $54.49 | $27.63 | — |
| Operating Engineer - Heavy&Highway: Group IV-B Group V | $74.22 | $46.59 | $27.63 | — |
| Operating Engineer - Heavy&Highway: Engineer All Tower, Climbing and Cranes of 100 Tons | $110.24 | $82.61 | $27.63 | — |
| Operating Engineer - Heavy&Highway: Hoist Engineer(Steel) | $102.30 | $74.67 | $27.63 | — |
| Operating Engineer - Heavy&Highway: Engineer(Pile Driver) | $107.36 | $79.73 | $27.63 | — |
| Operating Engineer - Heavy&Highway: Ram)Post Hole Digger | $90.29 | $62.66 | $27.63 | — |
| Operating Engineer - Heavy&Highway: Party Chief | $110.04 | $87.02 | $23.02 | Oct 1, 2026 |
| Operating Engineer - Heavy&Highway: Instrument Man | $87.25 | $64.23 | $23.02 | Oct 1, 2026 |
| Operating Engineer - Heavy&Highway: Rodman | $77.07 | $54.05 | $23.02 | Oct 1, 2026 |
| Operating Engineer - Heavy&Highway - Tunnel: GROUP I | $100.40 | $72.77 | $27.63 | Jul 1, 2026 |
| Operating Engineer - Heavy&Highway - Tunnel: GROUP I-A | $91.60 | $63.97 | $27.63 | Jul 1, 2026 |
| Operating Engineer - Heavy&Highway - Tunnel: GROUP I-B | $95.12 | $67.49 | $27.63 | Jul 1, 2026 |
| Operating Engineer - Heavy&Highway - Tunnel: GROUP II-A | $88.84 | $61.21 | $27.63 | Jul 1, 2026 |
| Operating Engineer - Heavy&Highway - Tunnel: GROUP II-B | $90.80 | $63.17 | $27.63 | Jul 1, 2026 |
| Operating Engineer - Heavy&Highway - Tunnel: GROUP III | $87.75 | $60.12 | $27.63 | Jul 1, 2026 |
| Operating Engineer - Heavy&Highway - Tunnel: GROUP IV-A | $82.12 | $54.49 | $27.63 | Jul 1, 2026 |
| Operating Engineer - Heavy&Highway - Tunnel: GROUP IV-B | $74.22 | $46.59 | $27.63 | Jul 1, 2026 |
| Operating Engineer - Heavy&Highway - Tunnel: GROUP V-A Engineer-Cranes | $110.24 | $82.61 | $27.63 | Jul 1, 2026 |
| Operating Engineer - Heavy&Highway - Tunnel: Engineer-Pile Driver | $107.36 | $79.73 | $27.63 | Jul 1, 2026 |
| Operating Engineer - Heavy&Highway - Tunnel: Hoist Engineer | $102.30 | $74.67 | $27.63 | Jul 1, 2026 |
| Operating Engineer - Heavy&Highway - Tunnel: Jersey Spreader/Post Hole Digger | $90.29 | $62.66 | $27.63 | Jul 1, 2026 |
How Putnam County compares
The main operating engineer rate in every county that has one, and how the pay splits here and nearby. All bars use the same scale.
Every county in New York
Wage and supplements, nearby
- Putnam Countybase $62.20$96.62
- Westchester Countybase $62.20$96.62
- Dutchess Countybase $62.20$96.62
- Rockland Countybase $68.72$105.47
Operating Engineer rates in nearby counties
Current NYSDOL rates. The rate is the one prevailing in the locality where the work is done; some job descriptions cover only part of a county (Labor Law §220(5)(d)).
NYSDOL's operating engineer rates for Putnam County are the same as in 1 other county: Westchester.
| County | Classification | Wage + supplements | Base | vs Putnam County |
|---|---|---|---|---|
| Bronx County | Operating Engineer - Building, Maintenance, Steel Erection & Heavy Construction: Group 1 | $122.77 | $83.44 | +$26.15 |
| Rockland County | Operating Engineer - Building / Heavy&Highway: Class A | $105.47 | $68.72 | +$8.85 |
| Orange County | Operating Engineer - Building / Heavy&Highway: Class A | $105.47 | $68.72 | +$8.85 |
| Ulster County | Operating Engineer - Building / Heavy&Highway: Class A | $105.47 | $68.72 | +$8.85 |
| Putnam County | Operating Engineer - Building: GROUP I-A | $96.62 | $62.20 | |
| Westchester County | Operating Engineer - Building: GROUP I-A | $96.62 | $62.20 | same |
| Dutchess County | Operating Engineer - Building: GROUP I-A | $96.62 | $62.20 | same |
New York operating engineer prevailing wage by county, with a map
Notes on this rate
NYSDOL's notes, in NYSDOL's words.
- Cranes (All Types up to 49 tons), Boom Trucks, Cherry Pickers (All Types), Clamshell Crane, Derrick (Stone and Steel), Dragline, Franki Pile Rig or similar, High Lift (Lull or similar) with crane attachment and winch used for hoisting or lifting, Hydraulic Cranes, Pile Drivers, Potain and similar.
- Cranes (All types 50-99 tons), Drill Rig Casa Grande (CAT or similar), Franki Pile Rig or similar, Hydraulic Cranes (All types including Crawler Cranes- No specific boom length).
- Cranes (All types 100 tons and over), All Tower Cranes, All Climbing Cranes irrespective of manufacturer and regardless of how the same is rigged, Franki Pile Rig or similar, Conventional Cranes (All types including Crawler Cranes-No specific boom length), Hydraulic Cranes.
- GROUP I-A: Barber Green Loader-Euclid Loader, Bulldozer, Carrier-Trailer Horse, Concrete Cleaning Decontamination Machine Operator, Concrete-Portable Hoist, Conway or Similar Mucking Machines, Elevator & Cage, Excavators all types, Front End Loaders, Gradall, Shovel, Backhoe, etc.(Crawler or Truck), Heavy Equipment Robotics Operator/Mechanic, Hoist Engineer-Material, Hoist Portable Mobile Unit, Hoist(Single, Double or Triple Drum), Horizontal Directional Drill Locator, Horizontal Directional Drill Operator and Jersey Spreader, Letourneau or Tournapull(Scrapers over 20 yards Struck), Lift Slab Console, etc., Lull HiLift or Similar, Master Environmental Maintenance Mechanics, Mucking Machines Operator/Mechanic or Similar Type, Overhead Crane, Pavement Breaker(Air Ram), Paver(Concrete), Post Hole Digger, Power House Plant, Road Boring Machine, Road Mix Machine, Ross Carrier and Similar Machines, Rubber tire double end backhoes and similar machines, Scoopmobile Tractor-Shovel Over 1.5 yards, Shovel (Tunnels), Spreader (Asphalt) Telephie(Cableway), Tractor Type Demolition Equipment, Trenching Machines-Vermeer Concrete Saw Trencher and Similar, Ultra High Pressure Waterjet Cutting Tool System, Vacuum Blasting Machine operator/mechanic, Winch Truck A Frame.
- GROUP I-B: Compressor (Steel Erection), Mechanic (Outside All Types), Negative Air Machine (Asbestos Removal), Push Button (Buzz Box) Elevator.
- GROUP II: Compactor Self-Propelled, Concrete Pump, Crane Operator in Training (Over 100 Tons), Grader, Machines Pulling Sheep's Foot Roller, Roller (4 ton and over), Scrapers (20 yards Struck and Under), Vibratory Rollers, Welder.
- GROUP III-A: Asphalt Plant, Concrete Mixing Plants, Forklift (All power sources), Joy Drill or similar, Tractor Drilling Machine, Loader (1 1/2 yards and under), Portable Asphalt Plant, Portable Batch Plant, Portable Crusher, Skid Steer (Bobcat or similar), Stone Crusher, Well Drilling Machine, Well Point System.
- GROUP III-B: Compressor Over 125 cu. Feet, Conveyor Belt Machine regardless of size, Compressor Plant, Ladder Hoist, Stud Machine.
- GROUP IV-A: Batch Plant, Concrete Breaker, Concrete Spreader, Curb Cutter Machine, Finishing Machine-Concrete, Fine Grading Machine, Hepa Vac Clean Air Machine, Material Hopper(sand, stone, cement), Mulching Grass Spreader, Pump Gypsum etc, Pump-Plaster-Grout-Fireproofing. Roller(Under 4 Ton),Spreading and Fine Grading Machine, Steel Cutting Machine, Siphon Pump, Tar Joint Machine, Television Cameras for Water, Sewer, Gas etc. Turbo Jet Burner or Similar Equipment, Vibrator (1 to 5).
- GROUP IV-B: Compressor (all types), Heater (All Types), Fire Watchman, Lighting Unit (Portable & Generator) Pump, Pump Station(Water, Sewer, Portable, Temporary), Welding Machine (Steel Erection & Excavation).
- GROUP V: Mechanics Helper, Motorized Roller (walk behind), Stock Attendant, Welder's Helper, Maintenance Engineer Crane(75 ton and over).
- Group VI-A: Welder Certified
- GROUP VI-B: Utility Man, Warehouse Man.
- WAGES: (per hour)
- An additional 20% of wage to be paid when required to wear protective equipment on hazardous/toxic waste projects.
- Engineers operating cranes with booms 100 feet but less than 149 feet in length will be paid an additional $2.00 per hour.
- Engineers operating cranes with booms 149 feet or over in length will be paid an additional $3.00 per hour.
- Loader operators over 5 cubic yard capacity additional .50 per hour.
- Shovel operators over 4 cubic yard capacity additional $1.00 per hour.
More from NYSDOL on this rate
- NYSDOL NYSDOL schedule, page 27
- NYSDOL's Article 8 schedules
- These are journeyworker rates. Only apprentices individually registered in a NYSDOL-registered program may be paid apprentice rates (Labor Law §220(3-e)).
Are you being paid this rate?
Add your hourly wage to the supplements your employer pays for you (benefits or cash), and compare it with the total. Contractors need a Contractor Registry certificate and file certified payroll electronically with NYSDOL. NYSDOL Bureau of Public Work: dol.ny.gov/prevailing-wage.
Source
Department of Labor (NYSDOL), NYSDOL schedule NYSDOL-8-137B, issued October 1, 2026, effective July 1, 2026, page 27: apps.labor.ny.gov/wpp/publicViewWageSchedule.do
We read every NYSDOL job description and county schedule for 2026-27, with the monthly updates through October 1, 2026, and the NYC Comptroller's schedule, and check every number with a second read. Neither agency prints a total; ours is wage plus supplements. How we check · Download Putnam County as CSV · Report an error