Home / North Dakota / Sargent County / Operating Engineer
Sargent County, ND · Operating Engineer
Operating Engineer prevailing wage in Sargent County, North Dakota
$65.45an hour, base wage + fringe benefits (our sum)
$40.20 base wage + $25.25 fringe benefits
POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR 180' BOOM OR JIB AND OVER ANY COMBINATION, ALL TYPES, CRANE OPERATOR 150 TONS & OVER, OVERHEAD CRANES 250 TONS & OVER, TOWER CRANES 200' AND UP, AN JIB CONFIGURATION 160' AND OVER · ENGI0049-008
$62.30an hour, base wage + fringe benefits (our sum)
$38.25 base wage + $24.05 fringe benefits
POWER EQUIPMENT OPERATOR: GROUP 1: ALL CRANES 60 TONS AND OVER; CRANES DOING PILING, SHEETING, DRAGLINE/CLAM WORK; DERRICK (GUY & STIFF); GENTRY CRANE OPERATOR, HELICOPTER OPERATOR; MOLE OPERATOR OR TUNNEL MUCKING MACHINE; POWER SHOVEL 3-1/2 CUBIC YARDS AND OVER (MACHINE STANDARD MFG. RATING); TRAVELING TOWER CRANE · ENGI0049-021
$57.30an hour, base wage + fringe benefits (our sum)
$34.85 base wage + $22.45 fringe benefits
POWER EQUIPMENT OPERATOR (ROLLER) · ENGI0049-090
Sargent County uses the same operating engineer rates as 5 other counties. See all of them on one page.
On federally funded or assisted building construction in Sargent County, an operating engineer must be paid at least $65.45 an hour: a $40.20 base wage plus $25.25 in fringe benefits, under wage determination ND20260036 (modification 2). DOL prints no total, so $65.45 is our sum of the two.
Wage determination ND20260036, modification 2, published May 18, 2026, for building construction; rate identifier ENGI0049-008 (May 1, 2025). Checked against sam.gov on October 25, 2026.
On federally funded or assisted highway construction in Sargent County, an operating engineer must be paid at least $62.30 an hour: a $38.25 base wage plus $24.05 in fringe benefits, under wage determination ND20260001 (modification 5). DOL prints no total, so $62.30 is our sum of the two.
Wage determination ND20260001, modification 5, published October 1, 2026, for highway construction; rate identifier ENGI0049-021 (October 1, 2026). Checked against sam.gov on October 25, 2026.
On federally funded or assisted heavy construction in Sargent County, an operating engineer must be paid at least $57.30 an hour: a $34.85 base wage plus $22.45 in fringe benefits, under wage determination ND20260048 (modification 2). DOL prints no total, so $57.30 is our sum of the two.
Wage determination ND20260048, modification 2, published May 18, 2026, for heavy construction; rate identifier ENGI0049-090 (October 1, 2025). Checked against sam.gov on October 25, 2026.
Davis-Bacon is the only prevailing wage here (federally funded or assisted work). North Dakota has no state prevailing wage law (DOL state table).
DOL lists 21 operating engineer rates for Sargent County, from $21.50 to $65.45 an hour. See all of them.
Base wage and fringe benefits: $40.20 + $25.25
The base wage is the taxable hourly wage. DOL prints the fringe benefits as one hourly figure, not itemized; it can go to health, pension, vacation and training plans, or be paid as cash where the state allows.
| Base wage (taxable) | $40.20 |
| Fringe benefits (one figure, not itemized) | $25.25 |
| Base + fringe benefits (our sum; DOL prints no total) | $65.45 |
Base wage and fringe benefits: $38.25 + $24.05
The base wage is the taxable hourly wage. DOL prints the fringe benefits as one hourly figure, not itemized; it can go to health, pension, vacation and training plans, or be paid as cash where the state allows.
| Base wage (taxable) | $38.25 |
| Fringe benefits (one figure, not itemized) | $24.05 |
| Base + fringe benefits (our sum; DOL prints no total) | $62.30 |
Base wage and fringe benefits: $34.85 + $22.45
The base wage is the taxable hourly wage. DOL prints the fringe benefits as one hourly figure, not itemized; it can go to health, pension, vacation and training plans, or be paid as cash where the state allows.
| Base wage (taxable) | $34.85 |
| Fringe benefits (one figure, not itemized) | $22.45 |
| Base + fringe benefits (our sum; DOL prints no total) | $57.30 |
When does this rate change?
- A contract keeps the wage determination in its bid documents. Modifications published before bid opening apply to it, though one published less than 10 days before can be left out if the agency finds there isn't time to tell bidders (29 CFR 1.6(c)).
- DOL changes a WD by publishing a numbered modification on SAM.gov. This page reads the modification named in the Source line; the North Dakota change log lists what each one changed.
Every operating engineer rate in Sargent County
As DOL lists them. The highlighted row is the one this page leads with.
- POWER EQUIPMENT OPERATOR: GROUP 2 ALL CRANES UP TO 149 TONS, CRANE OPERATOR UP TO 179' OF BOOM OR JIB, ANY COMBINATION ALL TYPES, GENTRY CRANE OPERATOR, OVERHEAD CRANES UP TO 249 TONS, TOWER CRANES UP TO 199' AND ANY JIB CONFIGURATION 159' AND UNDERBuilding · ENGI0049-008$65.45
- POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR 180' BOOM OR JIB AND OVER ANY COMBINATION, ALL TYPES, CRANE OPERATOR 150 TONS & OVER, OVERHEAD CRANES 250 TONS & OVER, TOWER CRANES 200' AND UP, AN JIB CONFIGURATION 160' AND OVERBuilding · ENGI0049-008$65.45
- POWER EQUIPMENT OPERATOR: GROUP 3 FORKLIFTBuilding · ENGI0049-008$64.85
- POWER EQUIPMENT OPERATOR: GROUP 1: ALL CRANES 60 TONS AND OVER; CRANES DOING PILING, SHEETING, DRAGLINE/CLAM WORK; DERRICK (GUY & STIFF); GENTRY CRANE OPERATOR, HELICOPTER OPERATOR; MOLE OPERATOR OR TUNNEL MUCKING MACHINE; POWER SHOVEL 3-1/2 CUBIC YARDS AND OVER (MACHINE STANDARD MFG. RATING); TRAVELING TOWER CRANEHighway · ENGI0049-021$62.30
- POWER EQUIPMENT OPERATOR: GROUP 3: ASPHALT PAVING MACHINE OPERATOR; ASPHALT PLANT OPERATOR; AUTOMATED GRADE TRIMMER; BACKHOE OPERATOR 1 CUBIC YARD UP TO AND INCLUDING 2-1/2 CUBIC YARDS (MACHINE STANDARD MFG. RATING); BOOM TRUCK, HYDRAULIC (8 TONS & OVER); CABLEWAY OPERATOR; CONCRETE BATCH PLANT OPERATOR (ELECTRONIC OR MANUAL); CONCRETE MIXER PAVING MACHINE OPERATOR; CONCRETE PAVER � BRIDGE DECKS; CONCRETE PUMP; CONCRETE SPREADER OPERATOR & BELT PLACER; CRUSHING PLANT OPERATOR; DOZER OPERATOR; DREDGE OPERATOR OR ENGINEER 11'' AND UNDER; DRILL RIGS, HEAVY DUTY ROTARY OR CHUM OR CABLE DRILL; FRONT END LOADER - 3-1/2 CUBIC YARDS UP TO AND INCLUDING 7-1/2 CUBIC YARDS (MACHINE STANDARD MFG. RATING); GRAVEL WASHING & SCREENING PLANT OPERATOR; LAZER-SCREED OPERATOR; LOCOMOTIVE, ALL TYPES; MECHANIC OR WELDER (HEAVY DUTY); MOTOR GRADE OPERATOR; PAVING BREAKER � NON-HYDRO HAMMER TYPE; PIPELINE WRAPPING, CLEANING & BENDING MACHINE OPERATOR; POWER ACTUATED AUGER AND HORIZONTAL BORING MACHINE OPERATOR 6'' AND OVER; REFRIGERATION PLANT ENGINEER; ROTO MILLING MACHINE (SURFACE PLANER) 43'' & OVER; SCRAPER OPERATOR; SLIP FORM CONCRETE PAVING OPERATOR; TANDEM PUSHED QUAD 9 OR SIMILAR; TRACTOR WITH BOOM ATTACHMENT; TRENCHING MACHINE- 100 HP. AND OVERHighway · ENGI0049-021$60.65
- POWER EQUIPMENT OPERATOR: CRANEHeavy · ENGI0049-091$57.70
- POWER EQUIPMENT OPERATOR: CRANEHeavy · ENGI0049-091$57.70
- POWER EQUIPMENT OPERATOR: BULLDOZERHeavy · ENGI0049-091$57.45
- POWER EQUIPMENT OPERATOR: BULLDOZERHeavy · ENGI0049-091$57.45
- POWER EQUIPMENT OPERATOR (ROLLER)Heavy · ENGI0049-090$57.30
- POWER EQUIPMENT OPERATOR: FORKLIFTHeavy · ENGI0049-091$57.30
- POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOEHeavy · ENGI0049-091$57.30
- POWER EQUIPMENT OPERATOR: FORKLIFTHeavy · ENGI0049-091$57.30
- POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOEHeavy · ENGI0049-091$57.30
- POWER EQUIPMENT OPERATOR: LOADERHeavy · ENGI0049-091$56.45
- POWER EQUIPMENT OPERATOR: LOADERHeavy · ENGI0049-091$56.45
- OPERATOR: GRADER/BLADEHeavy · SUND2017-011$38.06
- OPERATOR: BOBCAT/SKID STEER/SKID LOADERBuilding · SUND2012-025$33.88
- OPERATOR: LOADERBuilding · SUND2012-025$33.45
- OPERATOR: BACKHOE/EXCAVATOR/TRACKHOEBuilding · SUND2012-025$26.48
- OPERATOR: BOBCAT/SKID STEER/SKID LOADERHeavy · SUND2017-011$21.50
| Classification | Base wage | Fringe benefits | Total rate | WD |
|---|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 3 FORKLIFTBuildingENGI0049-008 | $39.60 | $25.25 | $64.85 | ND20260036 Mod 2 |
| POWER EQUIPMENT OPERATOR: GROUP 2 ALL CRANES UP TO 149 TONS, CRANE OPERATOR UP TO 179' OF BOOM OR JIB, ANY COMBINATION ALL TYPES, GENTRY CRANE OPERATOR, OVERHEAD CRANES UP TO 249 TONS, TOWER CRANES UP TO 199' AND ANY JIB CONFIGURATION 159' AND UNDERBuildingENGI0049-008 | $40.20 | $25.25 | $65.45 | ND20260036 Mod 2 |
| POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR 180' BOOM OR JIB AND OVER ANY COMBINATION, ALL TYPES, CRANE OPERATOR 150 TONS & OVER, OVERHEAD CRANES 250 TONS & OVER, TOWER CRANES 200' AND UP, AN JIB CONFIGURATION 160' AND OVERBuildingENGI0049-008 | $40.20 | $25.25 | $65.45 | ND20260036 Mod 2 |
| OPERATOR: LOADERBuildingSUND2012-025 | $21.00 | $12.45 | $33.45 | ND20260036 Mod 2 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADERBuildingSUND2012-025 | $21.23 | $12.65 | $33.88 | ND20260036 Mod 2 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOEBuildingSUND2012-025 | $22.48 | $4.00 | $26.48 | ND20260036 Mod 2 |
| POWER EQUIPMENT OPERATOR: GROUP 1: ALL CRANES 60 TONS AND OVER; CRANES DOING PILING, SHEETING, DRAGLINE/CLAM WORK; DERRICK (GUY & STIFF); GENTRY CRANE OPERATOR, HELICOPTER OPERATOR; MOLE OPERATOR OR TUNNEL MUCKING MACHINE; POWER SHOVEL 3-1/2 CUBIC YARDS AND OVER (MACHINE STANDARD MFG. RATING); TRAVELING TOWER CRANEHighwayENGI0049-021 | $38.25 | $24.05 | $62.30 | ND20260001 Mod 5 |
| POWER EQUIPMENT OPERATOR: GROUP 3: ASPHALT PAVING MACHINE OPERATOR; ASPHALT PLANT OPERATOR; AUTOMATED GRADE TRIMMER; BACKHOE OPERATOR 1 CUBIC YARD UP TO AND INCLUDING 2-1/2 CUBIC YARDS (MACHINE STANDARD MFG. RATING); BOOM TRUCK, HYDRAULIC (8 TONS & OVER); CABLEWAY OPERATOR; CONCRETE BATCH PLANT OPERATOR (ELECTRONIC OR MANUAL); CONCRETE MIXER PAVING MACHINE OPERATOR; CONCRETE PAVER � BRIDGE DECKS; CONCRETE PUMP; CONCRETE SPREADER OPERATOR & BELT PLACER; CRUSHING PLANT OPERATOR; DOZER OPERATOR; DREDGE OPERATOR OR ENGINEER 11'' AND UNDER; DRILL RIGS, HEAVY DUTY ROTARY OR CHUM OR CABLE DRILL; FRONT END LOADER - 3-1/2 CUBIC YARDS UP TO AND INCLUDING 7-1/2 CUBIC YARDS (MACHINE STANDARD MFG. RATING); GRAVEL WASHING & SCREENING PLANT OPERATOR; LAZER-SCREED OPERATOR; LOCOMOTIVE, ALL TYPES; MECHANIC OR WELDER (HEAVY DUTY); MOTOR GRADE OPERATOR; PAVING BREAKER � NON-HYDRO HAMMER TYPE; PIPELINE WRAPPING, CLEANING & BENDING MACHINE OPERATOR; POWER ACTUATED AUGER AND HORIZONTAL BORING MACHINE OPERATOR 6'' AND OVER; REFRIGERATION PLANT ENGINEER; ROTO MILLING MACHINE (SURFACE PLANER) 43'' & OVER; SCRAPER OPERATOR; SLIP FORM CONCRETE PAVING OPERATOR; TANDEM PUSHED QUAD 9 OR SIMILAR; TRACTOR WITH BOOM ATTACHMENT; TRENCHING MACHINE- 100 HP. AND OVERHighwayENGI0049-021 | $36.60 | $24.05 | $60.65 | ND20260001 Mod 5 |
| POWER EQUIPMENT OPERATOR (ROLLER)HeavyENGI0049-090 | $34.85 | $22.45 | $57.30 | ND20260048 Mod 2 |
| POWER EQUIPMENT OPERATOR: LOADERHeavyENGI0049-091 | $34.00 | $22.45 | $56.45 | ND20260048 Mod 2 |
| POWER EQUIPMENT OPERATOR: FORKLIFTHeavyENGI0049-091 | $34.85 | $22.45 | $57.30 | ND20260048 Mod 2 |
| POWER EQUIPMENT OPERATOR: CRANEHeavyENGI0049-091 | $35.25 | $22.45 | $57.70 | ND20260048 Mod 2 |
| POWER EQUIPMENT OPERATOR: BULLDOZERHeavyENGI0049-091 | $35.00 | $22.45 | $57.45 | ND20260048 Mod 2 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOEHeavyENGI0049-091 | $34.85 | $22.45 | $57.30 | ND20260048 Mod 2 |
| POWER EQUIPMENT OPERATOR: LOADERHeavyENGI0049-091 | $34.00 | $22.45 | $56.45 | ND20260048 Mod 2 |
| POWER EQUIPMENT OPERATOR: FORKLIFTHeavyENGI0049-091 | $34.85 | $22.45 | $57.30 | ND20260048 Mod 2 |
| POWER EQUIPMENT OPERATOR: CRANEHeavyENGI0049-091 | $35.25 | $22.45 | $57.70 | ND20260048 Mod 2 |
| POWER EQUIPMENT OPERATOR: BULLDOZERHeavyENGI0049-091 | $35.00 | $22.45 | $57.45 | ND20260048 Mod 2 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOEHeavyENGI0049-091 | $34.85 | $22.45 | $57.30 | ND20260048 Mod 2 |
| OPERATOR: GRADER/BLADEHeavySUND2017-011 | $25.44 | $12.62 | $38.06 | ND20260048 Mod 2 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADERHeavySUND2017-011 | $21.50 | $0.00 | $21.50 | ND20260048 Mod 2 |
How Sargent County compares
The main operating engineer rate in every county that has one, and how the pay splits here and nearby. All bars use the same scale.
Every county in North Dakota
Wage and fringe benefits, nearby
- Sargent Countybase $40.20$65.45
- Ransom Countybase $40.20$65.45
- Richland Countybase $40.20$65.45
- Cass Countybase $26.00$29.82
Operating Engineer rates in nearby counties
Current DOL rates. Davis-Bacon rates are set for groups of counties, so neighbours often share them; the county where the work is done decides.
DOL's operating engineer rates for Sargent County are the same as in 5 other counties: Dickey, Emmons, Grant, Ransom, Richland.
| County | Classification | Base wage | Total rate | vs Sargent County |
|---|---|---|---|---|
| Sargent County | POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR 180' BOOM OR JIB AND OVER ANY COMBINATION, ALL TYPES, CRANE OPERATOR 150 TONS & OVER, OVERHEAD CRANES 250 TONS & OVER, TOWER CRANES 200' AND UP, AN JIB CONFIGURATION 160' AND OVER | $40.20 | $65.45 | |
| Ransom County | POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR 180' BOOM OR JIB AND OVER ANY COMBINATION, ALL TYPES, CRANE OPERATOR 150 TONS & OVER, OVERHEAD CRANES 250 TONS & OVER, TOWER CRANES 200' AND UP, AN JIB CONFIGURATION 160' AND OVER | $40.20 | $65.45 | same |
| Richland County | POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR 180' BOOM OR JIB AND OVER ANY COMBINATION, ALL TYPES, CRANE OPERATOR 150 TONS & OVER, OVERHEAD CRANES 250 TONS & OVER, TOWER CRANES 200' AND UP, AN JIB CONFIGURATION 160' AND OVER | $40.20 | $65.45 | same |
| Dickey County | POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR 180' BOOM OR JIB AND OVER ANY COMBINATION, ALL TYPES, CRANE OPERATOR 150 TONS & OVER, OVERHEAD CRANES 250 TONS & OVER, TOWER CRANES 200' AND UP, AN JIB CONFIGURATION 160' AND OVER | $40.20 | $65.45 | same |
| LaMoure County | POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR 180' BOOM OR JIB AND OVER ANY COMBINATION, ALL TYPES, CRANE OPERATOR 150 TONS & OVER, OVERHEAD CRANES 250 TONS & OVER, TOWER CRANES 200' AND UP, AN JIB CONFIGURATION 160' AND OVER | $40.20 | $65.45 | same |
| Barnes County | POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR 180' BOOM OR JIB AND OVER ANY COMBINATION, ALL TYPES, CRANE OPERATOR 150 TONS & OVER, OVERHEAD CRANES 250 TONS & OVER, TOWER CRANES 200' AND UP, AN JIB CONFIGURATION 160' AND OVER | $40.20 | $65.45 | same |
| Cass County | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $26.00 | $29.82 | −$35.63 |
North Dakota operating engineer prevailing wage by county, with a map
More from DOL on this rate
- DOL wage determination
- SAM.gov wage determinations
- Davis-Bacon determinations list journeyworker rates. Apprentices in a program registered with DOL or a recognized state agency can be paid the program's percentage of the rate, within its ratio; anyone else gets the full rate (29 CFR 5.5(a)(4)).
Are you being paid this rate?
Add your base pay to the fringe your employer pays for you, in cash or into plans, and compare the sum with the total. The Department of Labor's Wage and Hour Division takes complaints: 1-866-487-9243, or dol.gov/agencies/whd/contact/complaints.
Source
U.S. Department of Labor, Wage and Hour Division (DOL), wage determination ND20260036 Mod 2, published May 18, 2026: sam.gov/wage-determination/ND20260036/2
We read every active North Dakota Davis-Bacon wage determination from SAM.gov's own data and check every number with a second, independent read of the same file. DOL prints no total; ours is base plus fringe. How we check · Download Sargent County as CSV · Report an error