Which kind of construction is the job?

The kind of construction decides the rate: each wage determination covers one. Residential covers homes and apartments up to four stories.

$21.03an hour, base wage + fringe benefits (our sum)

$21.03 base wage + $0.00 fringe benefits

OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE · SULA2012-025

$13.00an hour, base wage + fringe benefits (our sum)

$13.00 base wage + $0.00 fringe benefits

POWER EQUIPMENT OPERATOR: CRANE · SULA2004-012

$33.45an hour, base wage + fringe benefits (our sum)

$25.40 base wage + $8.05 fringe benefits

MECHANIC · ENGI0406-001

$11.38an hour, base wage + fringe benefits (our sum)

$11.38 base wage + $0.00 fringe benefits

POWER EQUIPMENT OPERATORS: WINCH · SULA2004-006

On federally funded or assisted building construction in Lafourche Parish, an operating engineer must be paid at least $21.03 an hour: a $21.03 base wage plus $0.00 in fringe benefits, under wage determination LA20260040 (modification 2). DOL prints no total, so $21.03 is our sum of the two.

Wage determination LA20260040, modification 2, published May 18, 2026, for building construction; rate identifier SULA2012-025 (September 22, 2014). Checked against sam.gov on October 25, 2026.

On federally funded or assisted residential construction in Lafourche Parish, an operating engineer must be paid at least $13.00 an hour: a $13.00 base wage plus $0.00 in fringe benefits, under wage determination LA20260001 (modification 2). DOL prints no total, so $13.00 is our sum of the two.

Wage determination LA20260001, modification 2, published May 18, 2026, for residential construction; rate identifier SULA2004-012 (June 15, 2004). Checked against sam.gov on October 25, 2026.

On federally funded or assisted highway construction in Lafourche Parish, an operating engineer must be paid at least $33.45 an hour: a $25.40 base wage plus $8.05 in fringe benefits, under wage determination LA20260012 (modification 1). DOL prints no total, so $33.45 is our sum of the two.

Wage determination LA20260012, modification 1, published May 18, 2026, for highway construction; rate identifier ENGI0406-001 (October 28, 2010). Checked against sam.gov on October 25, 2026.

On federally funded or assisted heavy construction in Lafourche Parish, an operating engineer must be paid at least $11.38 an hour: a $11.38 base wage plus $0.00 in fringe benefits, under wage determination LA20260002 (modification 2). DOL prints no total, so $11.38 is our sum of the two.

Wage determination LA20260002, modification 2, published May 18, 2026, for heavy construction; rate identifier SULA2004-006 (April 29, 2004). Checked against sam.gov on October 25, 2026.

Davis-Bacon is the only prevailing wage here (federally funded or assisted work). Louisiana has no state prevailing wage law (DOL state table).

DOL lists 25 operating engineer rates for Lafourche Parish, from $11.09 to $33.45 an hour. See all of them.

Base wage and fringe benefits: $21.03 + $0.00

The base wage is the taxable hourly wage. DOL prints the fringe benefits as one hourly figure, not itemized; it can go to health, pension, vacation and training plans, or be paid as cash where the state allows.

Base wage (taxable)$21.03
Base + fringe benefits (our sum; DOL prints no total)$21.03

Base wage and fringe benefits: $13.00 + $0.00

The base wage is the taxable hourly wage. DOL prints the fringe benefits as one hourly figure, not itemized; it can go to health, pension, vacation and training plans, or be paid as cash where the state allows.

Base wage (taxable)$13.00
Base + fringe benefits (our sum; DOL prints no total)$13.00

Base wage and fringe benefits: $25.40 + $8.05

The base wage is the taxable hourly wage. DOL prints the fringe benefits as one hourly figure, not itemized; it can go to health, pension, vacation and training plans, or be paid as cash where the state allows.

Base wage (taxable)$25.40
Fringe benefits (one figure, not itemized)$8.05
Base + fringe benefits (our sum; DOL prints no total)$33.45

Base wage and fringe benefits: $11.38 + $0.00

The base wage is the taxable hourly wage. DOL prints the fringe benefits as one hourly figure, not itemized; it can go to health, pension, vacation and training plans, or be paid as cash where the state allows.

Base wage (taxable)$11.38
Base + fringe benefits (our sum; DOL prints no total)$11.38

When does this rate change?

Every operating engineer rate in Lafourche Parish

As DOL lists them. The highlighted row is the one this page leads with.

ClassificationBase wageFringe benefitsTotal rateWD
POWER EQUIPMENT OPERATOR: CRANE CRANE PREMIUMS: 50-150 TONS $1.75 OVER 150 TONS $2.25BuildingENGI0406-002$23.46 $8.35 $31.81 LA20260040 Mod 2
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOEBuildingSULA2012-025$21.03 $0.00 $21.03 LA20260040 Mod 2
MECHANICHighwayENGI0406-001$25.40 $8.05 $33.45 LA20260012 Mod 1
POWER EQUIPMENT OPERATORS: TRENCHERHighwaySULA2011-004$14.38 $0.00 $14.38 LA20260012 Mod 1
POWER EQUIPMENT OPERATORS: ROLLER (ASPHALT AND DIRT COMPACTION)HighwaySULA2011-004$14.74 $4.23 $18.97 LA20260012 Mod 1
POWER EQUIPMENT OPERATORS: MILLING MACHINEHighwaySULA2011-004$16.63 $2.14 $18.77 LA20260012 Mod 1
POWER EQUIPMENT OPERATORS: GRADER/BLADEHighwaySULA2011-004$15.88 $0.00 $15.88 LA20260012 Mod 1
POWER EQUIPMENT OPERATORS: CRANEHighwaySULA2011-004$25.97 $0.00 $25.97 LA20260012 Mod 1
POWER EQUIPMENT OPERATORS: BULLDOZERHighwaySULA2011-004$16.40 $0.00 $16.40 LA20260012 Mod 1
POWER EQUIPMENT OPERATORS: BROOM/SWEEPERHighwaySULA2011-004$15.17 $5.15 $20.32 LA20260012 Mod 1
POWER EQUIPMENT OPERATORS: BACKHOE/EXCAVATOR/TRACKHOEHighwaySULA2011-004$20.03 $0.00 $20.03 LA20260012 Mod 1
POWER EQUIPMENT OPERATORS: ASPHALT PAVERHighwaySULA2011-004$17.20 $4.97 $22.17 LA20260012 Mod 1
POWER EQUIPMENT OPERATORS: WINCHHeavySULA2004-006$11.38 $0.00 $11.38 LA20260002 Mod 2
POWER EQUIPMENT OPERATORS: TRACKHOEHeavySULA2004-006$12.64 $0.00 $12.64 LA20260002 Mod 2
POWER EQUIPMENT OPERATORS: OILERHeavySULA2004-006$8.59 $2.50 $11.09 LA20260002 Mod 2
POWER EQUIPMENT OPERATORS: MOTOR GRADER/BLADEHeavySULA2004-006$11.75 $0.00 $11.75 LA20260002 Mod 2
POWER EQUIPMENT OPERATORS: FRONT END LOADERHeavySULA2004-006$11.50 $0.00 $11.50 LA20260002 Mod 2
POWER EQUIPMENT OPERATORS: DRAGLINEHeavySULA2004-006$15.16 $0.00 $15.16 LA20260002 Mod 2
POWER EQUIPMENT OPERATORS: CRANEHeavySULA2004-006$16.62 $3.28 $19.90 LA20260002 Mod 2
POWER EQUIPMENT OPERATORS: BULLDOZERHeavySULA2004-006$13.83 $0.00 $13.83 LA20260002 Mod 2
POWER EQUIPMENT OPERATORS: BACKHOE/EXCAVATORHeavySULA2004-006$13.01 $0.00 $13.01 LA20260002 Mod 2
POWER EQUIPMENT OPERATORS:UNIT OPERATOR - MINOR EQUIPMENT SUCH AS PUMPS, AIR COMPRESSORS, WELDING MACHINES, LIGHT PLANTS, WELL POINT SYSTEMS, ETC. (ASCENSION, LAFOURCHE, PLAQUEMINES, ST. JAMES, ST. MARY, AND TERREBONNE PARISHES)HeavyENGI0406-009$17.25 $6.95 $24.20 LA20260006 Mod 2
POWER EQUIPMENT OPERATORS: HEAVY EQUIPMENT OPERATOR - CRANE, ALL TYPES; DERRICKS; DECK WINCHES (2); HI-HO AND SIMILAR TYPE EQUIPMENT; THREE DRUM OR MORE STABILIZERS; PULLS, ALL TYPES; CONCRETE MIXER ON YARD AND OVER; ALL PAVERS; DITCHING OR TRENCHING MACHINES (TRACK TYPE); MECHANICS AND EQUIPMENT WELDERS; WELL POINT SYSTEMS; HOIST, TWO DRUMS OR MORE; HOIST, ONE DRUM FORTY VERTICAL FEET OR MORE; SCRAPERS; BULLDOZERS, RUBBER-TIRED OR TRACK, OTHER THAN FARM-TYPE; SCOOPMOBILES; MOTOR PATROL; GRADALL; ROLLERS ON HOT MIX; ASPHALT PAVING MACHINES; FRONT-END LOADERS OTHER THAN FARM-TYPE; ONE CUBIC YARD OR OVER; SHOVELS AND BACKHOES, ALL TYPES AND EQUIVALENT EQUIPMENT; PILEDRIVER; AND SIDE-BOOM CATS. (ASCENSION, LAFOURCHE, PLAQUEMINES, ST. JAMES, ST. MARY, AND TERREBONNE PARISHES)HeavyENGI0406-009$21.76 $6.95 $28.71 LA20260006 Mod 2
POWER EQUIPMENT OPERATORS OILER (ASCENSION, LAFOURCHE, PLAQUEMINES, ST. JAMES, ST. MARY, AND TERREBONNE PARISHES)HeavyENGI0406-009$13.99 $6.95 $20.94 LA20260006 Mod 2
POWER EQUIPMENT OPERATOR: CRANEResidentialSULA2004-012$13.00 $0.00 $13.00 LA20260001 Mod 2

How Lafourche Parish compares

The main operating engineer rate in every parish that has one, and how the pay splits here and nearby. All bars use the same scale.

Every parish in Louisiana

$19.07Acadia$22.92Orleans
LafourcheNearby: Jefferson $21.03, St. Charles $21.03, Assumption $21.90Each column is a group of counties with about the same main rate; its height is how many. 13 counties pay more than Lafourche, 9 the same, 41 less.

Wage and fringe benefits, nearby

  1. Lafourche Parishbase $21.03$21.03
  2. Jefferson Parishbase $21.03$21.03
  3. St. Charles Parishbase $21.03$21.03
  4. Assumption Parishbase $18.50$21.90

Operating Engineer rates in nearby localities

Current DOL rates. Davis-Bacon rates are set for groups of parishes, so neighbours often share them; the parish where the work is done decides.

ParishClassificationBase wageTotal ratevs Lafourche Parish
Assumption ParishOPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$18.50 $21.90 +$0.87
Lafourche ParishOPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$21.03 $21.03 
Jefferson ParishOPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$21.03 $21.03 same
St. Charles ParishOPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$21.03 $21.03 same
Terrebonne ParishOPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$21.03 $21.03 same
St. John the Baptist ParishOPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$21.03 $21.03 same
St. James ParishOPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$21.03 $21.03 same

Louisiana operating engineer prevailing wage by parish, with a map

More from DOL on this rate

All Lafourche Parish prevailing wage rates

Are you being paid this rate?

Add your base pay to the fringe your employer pays for you, in cash or into plans, and compare the sum with the total. The Department of Labor's Wage and Hour Division takes complaints: 1-866-487-9243, or dol.gov/agencies/whd/contact/complaints.

Source

U.S. Department of Labor, Wage and Hour Division (DOL), wage determination LA20260040 Mod 2, published May 18, 2026: sam.gov/wage-determination/LA20260040/2

We read every active Louisiana Davis-Bacon wage determination from SAM.gov's own data and check every number with a second, independent read of the same file. DOL prints no total; ours is base plus fringe. How we check · Download Lafourche Parish as CSV · Report an error