Skip to content

Home / New Jersey / Burlington County / Operating Engineer

Burlington County, NJ · Operating Engineer

Operating Engineer prevailing wage in Burlington County, New Jersey

$104.08an hour, base wage + fringe benefits · Backhoe

$61.63 base wage + $42.45 fringe benefits · Statewide rate

Burlington County uses the same operating engineer rates as 20 other counties. See all of them on one page.

On New Jersey public works in Burlington County, an operating engineer working as backhoe must be paid at least $104.08 an hour: a $61.63 base wage plus $42.45 in fringe benefits.

NJDOL county packages of October 19, 2026; this rate, effective July 1, 2026. Rates are those in effect when the contract is awarded, plus every pre-determined increase listed then, from its date (NJDOL FAQ). Checked against nj.gov on October 25, 2026.

NJDOL lists 225 operating engineer rates for Burlington County, from $96.83 to $114.19 an hour. See all of them.

NJDOL's posted rates are informational. The public body obtains the project's official determination, and it goes in the contract.

Base wage and fringe benefits: $61.63 + $42.45

The base wage is the taxable hourly wage. NJDOL prints the fringe benefits as one hourly figure, not itemized; it can go to health, pension, vacation and training plans, or be paid as cash where the state allows.

Base wage (taxable)$61.63
Fringe benefits (one figure, not itemized)$42.45
Total hourly rate, as printed$104.08

When does this rate change?

Every operating engineer rate in Burlington County

As NJDOL lists them. The highlighted row is the one this page leads with.

ClassificationBase wageFringe benefitsTotal rateEffective
OPERATING ENGINEERS: A-FrameStatewide rate$61.63 $42.45 $104.08 Jul 1, 2026
OPERATING ENGINEERS: Backhoe (combination)Statewide rate$61.63 $42.45 $104.08 Jul 1, 2026
OPERATING ENGINEERS: Boom Attachment on loaders (Except pipehook)Statewide rate$61.63 $42.45 $104.08 Jul 1, 2026
OPERATING ENGINEERS: Boring & Drilling MachineStatewide rate$61.63 $42.45 $104.08 Jul 1, 2026
OPERATING ENGINEERS: Brush Chopper, Brush Shredder, Tree Shredder, Tree ShearerStatewide rate$61.63 $42.45 $104.08 Jul 1, 2026
OPERATING ENGINEERS: Bulldozer, finish gradeStatewide rate$61.63 $42.45 $104.08 Jul 1, 2026
OPERATING ENGINEERS: CablewayStatewide rate$61.63 $42.45 $104.08 Jul 1, 2026
OPERATING ENGINEERS: CarryallStatewide rate$61.63 $42.45 $104.08 Jul 1, 2026
OPERATING ENGINEERS: Concrete PumpStatewide rate$61.63 $42.45 $104.08 Jul 1, 2026
OPERATING ENGINEERS: Concrete Pumping System (Pumpcrete & similar types)Statewide rate$61.63 $42.45 $104.08 Jul 1, 2026
OPERATING ENGINEERS: Conveyor, 125 feet or longerStatewide rate$61.63 $42.45 $104.08 Jul 1, 2026
OPERATING ENGINEERS: Drill Doctor (Duties include dust collector and maintenance)Statewide rate$61.63 $42.45 $104.08 Jul 1, 2026
OPERATING ENGINEERS: Front End Loader (2 cu. yds. but less than 5 cu. yds.)Statewide rate$61.63 $42.45 $104.08 Jul 1, 2026
OPERATING ENGINEERS: Grader, finishStatewide rate$61.63 $42.45 $104.08 Jul 1, 2026
OPERATING ENGINEERS: Groove Cutting Machine (ride-on type)Statewide rate$61.63 $42.45 $104.08 Jul 1, 2026
OPERATING ENGINEERS: Heater PlanerStatewide rate$61.63 $42.45 $104.08 Jul 1, 2026
OPERATING ENGINEERS: Hoist: Outside Material Tower Hoist (all types including steam, gas, diesel, electric, air hydraulic, single and double drum, concrete, brick shaft caisson, snorkle roof, and other similar types, Except Chicago-boom type) * receives an addtional $1.00 per hour on 100 ft. up to 199 ft. total height, and an additional $2.00 per hour on 200 ft. and over total height.Statewide rate$61.63 $42.45 $104.08 Jul 1, 2026
OPERATING ENGINEERS: Hydraulic Crane (10 tons & under)Statewide rate$61.63 $42.45 $104.08 Jul 1, 2026
OPERATING ENGINEERS: Hydraulic DredgeStatewide rate$61.63 $42.45 $104.08 Jul 1, 2026
OPERATING ENGINEERS: Hydro-AxeStatewide rate$61.63 $42.45 $104.08 Jul 1, 2026
OPERATING ENGINEERS: Hydro-BlasterStatewide rate$61.63 $42.45 $104.08 Jul 1, 2026
OPERATING ENGINEERS: Jack (screw, air hydraulic, power-operated unit, or console type, Except hand jack or pile load test type)Statewide rate$61.63 $42.45 $104.08 Jul 1, 2026
OPERATING ENGINEERS: Log SkidderStatewide rate$61.63 $42.45 $104.08 Jul 1, 2026
OPERATING ENGINEERS: PanStatewide rate$61.63 $42.45 $104.08 Jul 1, 2026
OPERATING ENGINEERS: Paver, concreteStatewide rate$61.63 $42.45 $104.08 Jul 1, 2026
OPERATING ENGINEERS: Plate & Frame Filter PressStatewide rate$61.63 $42.45 $104.08 Jul 1, 2026
OPERATING ENGINEERS: Pumpcrete (unit type)Statewide rate$61.63 $42.45 $104.08 Jul 1, 2026
OPERATING ENGINEERS: Pumpcrete, Squeezecrete, or Concrete Pumping machine (regardless of size)Statewide rate$61.63 $42.45 $104.08 Jul 1, 2026
OPERATING ENGINEERS: ScraperStatewide rate$61.63 $42.45 $104.08 Jul 1, 2026
OPERATING ENGINEERS: Side BoomStatewide rate$61.63 $42.45 $104.08 Jul 1, 2026
OPERATING ENGINEERS: Straddle Carrier (Ross and similar types)Statewide rate$61.63 $42.45 $104.08 Jul 1, 2026
OPERATING ENGINEERS: WhiphammerStatewide rate$61.63 $42.45 $104.08 Jul 1, 2026
OPERATING ENGINEERS: Winch Truck (hoisting)Statewide rate$61.63 $42.45 $104.08 Jul 1, 2026
OPERATING ENGINEERS: Asphalt Curbing MachineStatewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Asphalt Plant EngineerStatewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Asphalt SpreaderStatewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Autograde Curb Trimmer & Sidewalk Shoulder Slipform (CMI & similar types)Statewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Autograde Curecrete Machine (CMI & similar types)Statewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Autograde Tube Finisher & Texturing Machine (CMI & similar types)Statewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Bar Bending Machines (Power)Statewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Batcher, Batching Plant, & Crusher [On Site]Statewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Belt Conveyor SystemStatewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Boom-Type Skimmer MachineStatewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Bridge Deck FinisherStatewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Bulldozer (all sizes)Statewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Captain (Power Boats)Statewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Car Dumper (railroad)Statewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Compressor & Blower unit for loading/unloading of concrete, cement, fly ash, or similar type materials (used independently or truck-mounted)Statewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Compressor (2 or 3 battery)Statewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Concrete Breaking MachineStatewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Concrete Cleaning/Decontamination MachineStatewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Concrete Finishing MachineStatewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Concrete Saw or Cutter (ride-on type)Statewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Concrete Spreader (Hetzel, Rexomatic & similar types)Statewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Concrete VibratorStatewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Conveyors - under 125 feetStatewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Crane SignalmanStatewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Crushing MachineStatewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Directional Boring MachineStatewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Ditching Machine - Small (Ditchwitch, Vermeer or similar types)Statewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Dope Pot - Mechanical (with or without pump)Statewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: DumpsterStatewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: ElevatorStatewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: FiremanStatewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Fork Lift (Economobile, Lull & similar types)Statewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Front End Loader (1 cu. yd. and over but less than 2 cu. yds.)Statewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Generator (2 or 3 battery)Statewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Giraffe GrinderStatewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Goldhofer/Hydraulic Jacking TrailerStatewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Grader & Motor PatrolsStatewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Grout PumpStatewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Gunnite Machine (Excluding nozzle)Statewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Hammer - Vibratory (in conjunction with generator)Statewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Heavy Equipment Robotics - Operator/TechnicianStatewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Hoist (roof, tugger, aerial platform hoist, house car)Statewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: HopperStatewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Hopper Doors (power operated)Statewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Ladder (motorized)Statewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: LaddervatorStatewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Locomotive (Dinky-type)Statewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Maintenance Utility ManStatewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Master Environmental Maintenance TechnicianStatewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: MechanicStatewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Mixer (Except paving mixers)Statewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Pavement Breaker (truck-mounted or small self-propelled ride-on type)Statewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Pavement Breaker - maintenance of compressor or hydraulic unitStatewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Pipe Bending Machine (power)Statewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Pitch PumpStatewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Plaster Pump (regardless of size)Statewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Post Hole Digger (post pounder, auger)Statewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Rod Bending MachinesStatewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Roller (black top)Statewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Scale (power)Statewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Seamen Pulverizing MixerStatewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Shoulder WidenerStatewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: SiloStatewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Skimmmer Machine (boom type)Statewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Steel Cutting Machine (service & maintenance)Statewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Tamrock DrillStatewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: TractorStatewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Transfer MachinesStatewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Tug CaptainsStatewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Tug Master (Power Boats)Statewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Ultra High Pressure Waterjet Cutting Tool System - Operator/Maintenance TechnicianStatewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Vacuum Blasting Machine - Operator/Maintenance TechnicianStatewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Vibrating Plant (used with unloading)Statewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Welder & Repair MechanicStatewide rate$59.72 $42.45 $102.17 Jul 1, 2026
OPERATING ENGINEERS: Assistant Engineer/OilerStatewide rate$54.38 $42.45 $96.83 Jul 1, 2026
OPERATING ENGINEERS: Driller's HelperStatewide rate$54.38 $42.45 $96.83 Jul 1, 2026
OPERATING ENGINEERS: Maintenance Apprentice (Deckhand)Statewide rate$54.38 $42.45 $96.83 Jul 1, 2026
OPERATING ENGINEERS: Maintenance Apprentice (Oiler)Statewide rate$54.38 $42.45 $96.83 Jul 1, 2026
OPERATING ENGINEERS: Mechanic's HelperStatewide rate$54.38 $42.45 $96.83 Jul 1, 2026
OPERATING ENGINEERS: Off Road Back DumpStatewide rate$54.38 $42.45 $96.83 Jul 1, 2026
OPERATING ENGINEERS: Tire Repair & MaintenanceStatewide rate$54.38 $42.45 $96.83 Jul 1, 2026
OPERATING ENGINEERS: Lead Engineer, Foreman Engineer, Safety Engineer (minimum)Statewide rate$61.96 $42.45 $104.41 Jul 1, 2026
OPERATING ENGINEERS: Autograde Pavement Profiler (CMI & similar types)Statewide rate$63.22 $42.45 $105.67 Jul 1, 2026
OPERATING ENGINEERS: Autograde Pavement Profiler - Recycle Type (CMI & similar types)Statewide rate$63.22 $42.45 $105.67 Jul 1, 2026
OPERATING ENGINEERS: Autograde Placer/Trimmer/Spreader Combination (CMI & similar types)Statewide rate$63.22 $42.45 $105.67 Jul 1, 2026
OPERATING ENGINEERS: Autograde Slipform Paver (CMI & similar types)Statewide rate$63.22 $42.45 $105.67 Jul 1, 2026
OPERATING ENGINEERS: Backhoe (Excavator)Statewide rate$63.22 $42.45 $105.67 Jul 1, 2026
OPERATING ENGINEERS: Central Power PlantStatewide rate$63.22 $42.45 $105.67 Jul 1, 2026
OPERATING ENGINEERS: Concrete Paving MachineStatewide rate$63.22 $42.45 $105.67 Jul 1, 2026
OPERATING ENGINEERS: Cranes, Derricks, Pile Drivers (all types), under 100 tons with a boom (including jib and/or leads) under 100 ft.Statewide rate$63.22 $42.45 $105.67 Jul 1, 2026
OPERATING ENGINEERS: DraglinesStatewide rate$63.22 $42.45 $105.67 Jul 1, 2026
OPERATING ENGINEERS: Drill, Bauer, AMI and similar typesStatewide rate$63.22 $42.45 $105.67 Jul 1, 2026
OPERATING ENGINEERS: Drillmaster, QuarrymasterStatewide rate$63.22 $42.45 $105.67 Jul 1, 2026
OPERATING ENGINEERS: Drillmaster/Quarrymaster (down-the-hole drill), rotary drill, self-propelled hydraulic drill, self-powered drillStatewide rate$63.22 $42.45 $105.67 Jul 1, 2026
OPERATING ENGINEERS: Elevator GraderStatewide rate$63.22 $42.45 $105.67 Jul 1, 2026
OPERATING ENGINEERS: Front End Loader (5 cu. yards or larger)Statewide rate$63.22 $42.45 $105.67 Jul 1, 2026
OPERATING ENGINEERS: GradallStatewide rate$63.22 $42.45 $105.67 Jul 1, 2026
OPERATING ENGINEERS: Grader, RagoStatewide rate$63.22 $42.45 $105.67 Jul 1, 2026
OPERATING ENGINEERS: Helicoptor Co-PilotStatewide rate$63.22 $42.45 $105.67 Jul 1, 2026
OPERATING ENGINEERS: Helicoptor Communications EngineerStatewide rate$63.22 $42.45 $105.67 Jul 1, 2026
OPERATING ENGINEERS: Juntann Pile DriverStatewide rate$63.22 $42.45 $105.67 Jul 1, 2026
OPERATING ENGINEERS: Locomotive (large)Statewide rate$63.22 $42.45 $105.67 Jul 1, 2026
OPERATING ENGINEERS: Mucking MachineStatewide rate$63.22 $42.45 $105.67 Jul 1, 2026
OPERATING ENGINEERS: Pavement & Concrete Breaker (Superhammer & Hoe Ram)Statewide rate$63.22 $42.45 $105.67 Jul 1, 2026
OPERATING ENGINEERS: Pile DriverStatewide rate$63.22 $42.45 $105.67 Jul 1, 2026
OPERATING ENGINEERS: Prentice TruckStatewide rate$63.22 $42.45 $105.67 Jul 1, 2026
OPERATING ENGINEERS: Roadway Surface GrinderStatewide rate$63.22 $42.45 $105.67 Jul 1, 2026
OPERATING ENGINEERS: Scooper (loader & shovel)Statewide rate$63.22 $42.45 $105.67 Jul 1, 2026
OPERATING ENGINEERS: Shovel (Excavator)Statewide rate$63.22 $42.45 $105.67 Jul 1, 2026
OPERATING ENGINEERS: Trackhoe (Excavator)Statewide rate$63.22 $42.45 $105.67 Jul 1, 2026
OPERATING ENGINEERS: Tree Chopper with boomStatewide rate$63.22 $42.45 $105.67 Jul 1, 2026
OPERATING ENGINEERS: Trenching Machine (cable plow)Statewide rate$63.22 $42.45 $105.67 Jul 1, 2026
OPERATING ENGINEERS: Tunnel Boring MachineStatewide rate$63.22 $42.45 $105.67 Jul 1, 2026
OPERATING ENGINEERS: Vacuum TruckStatewide rate$63.22 $42.45 $105.67 Jul 1, 2026
OPERATING ENGINEERS: ChipperStatewide rate$58.09 $42.45 $100.54 Jul 1, 2026
OPERATING ENGINEERS: Compressor (single)Statewide rate$58.09 $42.45 $100.54 Jul 1, 2026
OPERATING ENGINEERS: Concrete Spreader (small type)Statewide rate$58.09 $42.45 $100.54 Jul 1, 2026
OPERATING ENGINEERS: Conveyor Loader (Except elevator graders)Statewide rate$58.09 $42.45 $100.54 Jul 1, 2026
OPERATING ENGINEERS: Engines, Large Diesel (1620 HP) & Staging PumpStatewide rate$58.09 $42.45 $100.54 Jul 1, 2026
OPERATING ENGINEERS: Farm TractorStatewide rate$58.09 $42.45 $100.54 Jul 1, 2026
OPERATING ENGINEERS: Fertilizing Equipment (operation & maintenance)Statewide rate$58.09 $42.45 $100.54 Jul 1, 2026
OPERATING ENGINEERS: Fine Grade Machine (small type)Statewide rate$58.09 $42.45 $100.54 Jul 1, 2026
OPERATING ENGINEERS: Form Line Grader (small type)Statewide rate$58.09 $42.45 $100.54 Jul 1, 2026
OPERATING ENGINEERS: Front End Loader (under 1 cubic yard)Statewide rate$58.09 $42.45 $100.54 Jul 1, 2026
OPERATING ENGINEERS: Generator (single)Statewide rate$58.09 $42.45 $100.54 Jul 1, 2026
OPERATING ENGINEERS: Grease, Gas, Fuel, & Oil Supply TrucksStatewide rate$58.09 $42.45 $100.54 Jul 1, 2026
OPERATING ENGINEERS: Heaters (Nelson or other type)Statewide rate$58.09 $42.45 $100.54 Jul 1, 2026
OPERATING ENGINEERS: Lights - portable generating light plantStatewide rate$58.09 $42.45 $100.54 Jul 1, 2026
OPERATING ENGINEERS: Mixer, Concrete (small)Statewide rate$58.09 $42.45 $100.54 Jul 1, 2026
OPERATING ENGINEERS: Mulching Equipment (operation & maintenance)Statewide rate$58.09 $42.45 $100.54 Jul 1, 2026
OPERATING ENGINEERS: Power Broom or SweeperStatewide rate$58.09 $42.45 $100.54 Jul 1, 2026
OPERATING ENGINEERS: Pump (diesel engine & hydraulic - regardless of power)Statewide rate$58.09 $42.45 $100.54 Jul 1, 2026
OPERATING ENGINEERS: Pump (larger than 2 inch suction, including submersible pumps)Statewide rate$58.09 $42.45 $100.54 Jul 1, 2026
OPERATING ENGINEERS: Road Finishing Machine (small type)Statewide rate$58.09 $42.45 $100.54 Jul 1, 2026
OPERATING ENGINEERS: Roller - grade, fill, or stone baseStatewide rate$58.09 $42.45 $100.54 Jul 1, 2026
OPERATING ENGINEERS: Seeding Equipment (operation & maintenance)Statewide rate$58.09 $42.45 $100.54 Jul 1, 2026
OPERATING ENGINEERS: Sprinkler & Water Pump TrucksStatewide rate$58.09 $42.45 $100.54 Jul 1, 2026
OPERATING ENGINEERS: Steam Generator or BoilerStatewide rate$58.09 $42.45 $100.54 Jul 1, 2026
OPERATING ENGINEERS: Stone SpreaderStatewide rate$58.09 $42.45 $100.54 Jul 1, 2026
OPERATING ENGINEERS: Tamping Machine (vibrating ride-on type)Statewide rate$58.09 $42.45 $100.54 Jul 1, 2026
OPERATING ENGINEERS: Temporary Heating Plant (Nelson or other type, including proprane, natural gas, and flow-type units)Statewide rate$58.09 $42.45 $100.54 Jul 1, 2026
OPERATING ENGINEERS: Water or Sprinkler TruckStatewide rate$58.09 $42.45 $100.54 Jul 1, 2026
OPERATING ENGINEERS: Welding Machine (gas, diesel, or electric convertor, of any type)Statewide rate$58.09 $42.45 $100.54 Jul 1, 2026
OPERATING ENGINEERS: Welding System - Multiple (rectifier transformer type)Statewide rate$58.09 $42.45 $100.54 Jul 1, 2026
OPERATING ENGINEERS: Wellpoint Systems (including installation by bull gang and maintenance)Statewide rate$58.09 $42.45 $100.54 Jul 1, 2026
OPERATING ENGINEERS: Helicoptor Pilot/EngineerStatewide rate$65.04 $42.45 $107.49 Jul 1, 2026
OPERATING ENGINEERS: Cranes, Derricks, Pile Driver (all types), 100 tons and over and TOWER CRANE with boom (including jib and/or leads) 140 ft. and overStatewide rate$69.72 $42.45 $112.17 Jul 1, 2026
OPERATING ENGINEERS: Cranes, Derricks, Pile Driver (all types), 100 tons and over and TOWER CRANE with boom (including jib and/or leads) from 100 ft. to 139 ft.Statewide rate$68.72 $42.45 $111.17 Jul 1, 2026
OPERATING ENGINEERS: Cranes, Derricks, Pile Driver (all types) , under 100 tons with a boom (including jib and/or leads) 140 ft. and overStatewide rate$65.22 $42.45 $107.67 Jul 1, 2026
OPERATING ENGINEERS: Cranes, Derricks, Pile Driver (all types), 100 tons and over and TOWER CRANE with a boom (including jib and/or leads) under 100 ft.Statewide rate$67.72 $42.45 $110.17 Jul 1, 2026
OPERATING ENGINEERS: Cranes, Derricks, Pile Driver (all types), under 100 tons with a boom (including jib and/or leads) from 100 ft. to 139 ft.Statewide rate$64.22 $42.45 $106.67 Jul 1, 2026
STRUCTURAL STEEL ERECTION: Helicopter Co-Pilot & Communications EngineerStatewide rate$66.85 $42.45 $109.30 Jul 1, 2026
STRUCTURAL STEEL ERECTION: A-FrameStatewide rate$62.79 $42.45 $105.24 Jul 1, 2026
STRUCTURAL STEEL ERECTION: Cherry Picker -10 tons or less (Over 10 tons use crane rate)Statewide rate$62.79 $42.45 $105.24 Jul 1, 2026
STRUCTURAL STEEL ERECTION: Hoist (all types Except Chicago-boom)Statewide rate$62.79 $42.45 $105.24 Jul 1, 2026
STRUCTURAL STEEL ERECTION: Jack (screw, air hydraulic, power-operated unit or console type, Except hand jack or pile load test type)Statewide rate$62.79 $42.45 $105.24 Jul 1, 2026
STRUCTURAL STEEL ERECTION: Side BoomStatewide rate$62.79 $42.45 $105.24 Jul 1, 2026
STRUCTURAL STEEL ERECTION: Straddle CarrierStatewide rate$62.79 $42.45 $105.24 Jul 1, 2026
STRUCTURAL STEEL ERECTION: Aerial Platform Used On HoistsStatewide rate$60.13 $42.45 $102.58 Jul 1, 2026
STRUCTURAL STEEL ERECTION: Apprentice Engineer/Oiler with Compressor or Welding MachineStatewide rate$60.13 $42.45 $102.58 Jul 1, 2026
STRUCTURAL STEEL ERECTION: Captain (Power Boats)Statewide rate$60.13 $42.45 $102.58 Jul 1, 2026
STRUCTURAL STEEL ERECTION: Compressor (2 or 3 in battery)Statewide rate$60.13 $42.45 $102.58 Jul 1, 2026
STRUCTURAL STEEL ERECTION: Concrete Cleaning/Decontamination Machine OperatorStatewide rate$60.13 $42.45 $102.58 Jul 1, 2026
STRUCTURAL STEEL ERECTION: Conveyor or Tugger HoistStatewide rate$60.13 $42.45 $102.58 Jul 1, 2026
STRUCTURAL STEEL ERECTION: Directional Boring MachineStatewide rate$60.13 $42.45 $102.58 Jul 1, 2026
STRUCTURAL STEEL ERECTION: Elevator or House CarStatewide rate$60.13 $42.45 $102.58 Jul 1, 2026
STRUCTURAL STEEL ERECTION: FiremanStatewide rate$60.13 $42.45 $102.58 Jul 1, 2026
STRUCTURAL STEEL ERECTION: ForkliftStatewide rate$60.13 $42.45 $102.58 Jul 1, 2026
STRUCTURAL STEEL ERECTION: Generator (2 or 3)Statewide rate$60.13 $42.45 $102.58 Jul 1, 2026
STRUCTURAL STEEL ERECTION: Heavy Equipment Robotics, Operator/TechnicianStatewide rate$60.13 $42.45 $102.58 Jul 1, 2026
STRUCTURAL STEEL ERECTION: Maintenance Utility ManStatewide rate$60.13 $42.45 $102.58 Jul 1, 2026
STRUCTURAL STEEL ERECTION: Master Environmental Maintenance TechnicianStatewide rate$60.13 $42.45 $102.58 Jul 1, 2026
STRUCTURAL STEEL ERECTION: Tug Master (Power Boats)Statewide rate$60.13 $42.45 $102.58 Jul 1, 2026
STRUCTURAL STEEL ERECTION: Ultra High Pressure Waterjet Cutting Tool System Operator/Maintenance TechnicianStatewide rate$60.13 $42.45 $102.58 Jul 1, 2026
STRUCTURAL STEEL ERECTION: Vacuum Blasting Machine Operator/Maintenance TechnicianStatewide rate$60.13 $42.45 $102.58 Jul 1, 2026
STRUCTURAL STEEL ERECTION: Welding Machines, Gas or Electric Converters on any type-2 or 3 in battery including dieselsStatewide rate$60.13 $42.45 $102.58 Jul 1, 2026
STRUCTURAL STEEL ERECTION: Compressor (Single)Statewide rate$58.60 $42.45 $101.05 Jul 1, 2026
STRUCTURAL STEEL ERECTION: GeneratorsStatewide rate$58.60 $42.45 $101.05 Jul 1, 2026
STRUCTURAL STEEL ERECTION: Welding Machines, Gas, Diesel, Or Electric Converters of any type-singleStatewide rate$58.60 $42.45 $101.05 Jul 1, 2026
STRUCTURAL STEEL ERECTION: Welding System, Multiple (Rectifier Transformer Type)Statewide rate$58.60 $42.45 $101.05 Jul 1, 2026
STRUCTURAL STEEL ERECTION: Assistant Engineer/OilerStatewide rate$54.84 $42.45 $97.29 Jul 1, 2026
STRUCTURAL STEEL ERECTION: Drillers HelperStatewide rate$54.84 $42.45 $97.29 Jul 1, 2026
STRUCTURAL STEEL ERECTION: Maintenance Apprentice (Deckhand)Statewide rate$54.84 $42.45 $97.29 Jul 1, 2026
STRUCTURAL STEEL ERECTION: Maintenance Apprentice (Oiler)Statewide rate$54.84 $42.45 $97.29 Jul 1, 2026
STRUCTURAL STEEL ERECTION: Off Road Back DumpStatewide rate$54.84 $42.45 $97.29 Jul 1, 2026
STRUCTURAL STEEL ERECTION: Lead Engineer, Foreman Engineer, Safety Engineer (Minimum)Statewide rate$62.41 $42.45 $104.86 Jul 1, 2026
STRUCTURAL STEEL ERECTION: Vacuum TruckStatewide rate$63.55 $42.45 $106.00 Jul 1, 2026
STRUCTURAL STEEL ERECTION: Cranes (all cranes, land or floating with booms, including jib, 140 ft. and over, above ground). Derricks (all derricks, land, floating or Chicago Boom type with booms including jib, 140 ft. and over, above ground), and Pile Drivers (all types) 100 tons and over and Tower Cranes.Statewide rate$71.74 $42.45 $114.19 Jul 1, 2026
STRUCTURAL STEEL ERECTION: Cranes (all cranes, land or floating with booms including jib, less than 140 ft. abovr ground), Derricks (all derricks. land, floating or Chicago Boom type with booms including jib, less than 140 ft. above ground), Pile Drivers (all types), 100 tons and over and Tower Crane.Statewide rate$70.08 $42.45 $112.53 Jul 1, 2026
STRUCTURAL STEEL ERECTION: Cranes (all cranes, land or floating with booms including jib, 140 ft. and over, above ground), Derricks (all derricks, land, floating or Chicago Boom type with booms including jib, 140 ft. and over, above ground), Pile Drivers (all types), under 100 tons.Statewide rate$67.24 $42.45 $109.69 Jul 1, 2026
STRUCTURAL STEEL ERECTION: Cranes (all cranes, land or floating with booms including jib, less than 140 ft. above ground), Derricks (all derricks, land, floating or Chicago Boom type with booms including jib, less than 140 ft. above ground), Pile Drivers (all types), under 100 tons.Statewide rate$65.58 $42.45 $108.03 Jul 1, 2026
STRUCTURAL STEEL ERECTION: Helicopter Pilot & EngineerStatewide rate$67.24 $42.45 $109.69 Jul 1, 2026

Davis-Bacon operating engineer rate in Burlington County

Federally funded or assisted construction here uses the U.S. Department of Labor's wage determinations. Where both Davis-Bacon and the New Jersey Act apply, "whichever rate is higher must be paid" (NJDOL FAQ).

We don't put a federal figure next to NJDOL's here, because the federal determinations split this trade into groups that don't line up with NJDOL's. The federal rows for this trade are below; match the classification to the work.

ConstructionFederal classificationBase wageTotal rateWD
BuildingPOWER EQUIPMENT OPERATORS: GROUP 5 OILER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN …ENGI0825-020$52.88 $90.38 NJ20260027 Mod 2
BuildingPOWER EQUIPMENT OPERATORS: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, …ENGI0825-020$56.59 $94.09 NJ20260027 Mod 2
BuildingPOWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER …ENGI0825-020$58.22 $95.72 NJ20260027 Mod 2
BuildingPOWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING …ENGI0825-020$61.72 $99.22 NJ20260027 Mod 2
HighwayPOWER EQUIPMENT OPERATORS: GROUP 6 HELICOPTER PILOT; HELICOPTER ENGINEER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE …ENGI0825-002$63.54 $101.04 NJ20260001 Mod 2
HighwayPOWER EQUIPMENT OPERATORS: GROUP 5 OILER; TIRE REPAIR AND MAINTENANCE HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE …ENGI0825-002$52.88 $90.38 NJ20260001 Mod 2
HighwayPOWER EQUIPMENT OPERATORS: GROUP 4 BROOM AND SWEEPER; CHIPPER; COMPRESSOR (SINGLE); CONCRETE SPREADER (SMALL TYPE); CONVEYOR LOADER (DOES NOT INCLUDE ELEVATING …ENGI0825-002$56.59 $94.09 NJ20260001 Mod 2
HighwayPOWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT CURBING MACHINE; ASPHALT PLANT ENGINEER; ASPHALT SPREADER; AUTOGRADE TUBE FINISHING AND TEXTURING MACHINE (CMI AND …ENGI0825-002$58.22 $95.72 NJ20260001 Mod 2
HighwayPOWER EQUIPMENT OPERATORS: GROUP 2 "A" FRAME/BACKHOE COMBINATION; BOOM ATTACHMENT ON LOADER (RATE BASED ON SIZE OF BUCKET, NOT APPLICABLE TO PIPEHOOK); BORING …ENGI0825-002$60.13 $97.63 NJ20260001 Mod 2
HighwayPOWER EQUIPMENT OPERATORS: GROUP 1 AUTOGRADE - COMBINATION SUBGRADER; BASE METAL SPREADER AND BASE TRIMMER (CMI AND SIMILAR TYPES); AUTOGRADE PLACER - TRIMMER …ENGI0825-002$61.72 $99.22 NJ20260001 Mod 2
HighwayPOWER EQUIPMENT OPERATORS:, STEEL ERECTION: (GROUP 6) COMPRESSOR, SINGLE; OFF-ROAD BACK DUMP; WELDING MACHINE (SINGLE, GAS, DIESEL AND ELECTRIC CONVERTERS OF …ENGI0825-004$53.34 $90.84 NJ20260001 Mod 2
HighwayPOWER EQUIPMENT OPERATORS:, STEEL ERECTION: (GROUP 5) AERIAL PLATFORM USED AS A HOIST; COMPRESSOR, TWO OR THREE IN BATTERY; DIRECTIONAL BORING MACHINE; …ENGI0825-004$57.10 $94.60 NJ20260001 Mod 2
HighwayPOWER EQUIPMENT OPERATORS:, STEEL ERECTION: (GROUP 4) "A" FRAME; CHERRY PICKER (10 TON AND UNDER); HOIST (ALL TYPES OF HOIST, INCLUDING STEAM, GAS, DIESEL, …ENGI0825-004$58.63 $96.13 NJ20260001 Mod 2
HighwayPOWER EQUIPMENT OPERATORS:, STEEL ERECTION: (GROUP 3) HELICOPTER PILOT HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE …ENGI0825-004$61.29 $98.79 NJ20260001 Mod 2
HighwayPOWER EQUIPMENT OPERATORS:, STEEL ERECTION: (GROUP 2) CRANES (ALL CRANES, LAND OR FLOATING WITH BOOM INCLUDING JIB, LESS THAN 140 FT. ABOVE GROUND); DERRICKS …ENGI0825-004$68.58 $106.08 NJ20260001 Mod 2
HighwayPOWER EQUIPMENT OPERATORS:, STEEL ERECTION: (GROUP 1) CRANES (ALL CRANES, LAND OR FLOATING WITH BOOM INCLUDING JIB, 140 FT. AND OVER, ABOVE GROUND); DERRICKS …ENGI0825-004$70.24 $107.74 NJ20260001 Mod 2
HeavyPOWER EQUIPMENT OPERATOR: GROUP 5 OILER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN …ENGI0825-021$52.88 $90.38 NJ20260048 Mod 3
HeavyPOWER EQUIPMENT OPERATOR: GROUP 4 BROOM; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); ROLLER, GRADE; PUMP (HAZARDOUS WASTE REMOVAL …ENGI0825-021$56.59 $94.09 NJ20260048 Mod 3
HeavyPOWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT SPREADER; BULLDOZER; COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); CRUSHER; FORKLIFT; FRONT END LOADER (1 CU. YD. …ENGI0825-021$58.22 $95.72 NJ20260048 Mod 3
HeavyPOWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING …ENGI0825-021$61.72 $99.22 NJ20260048 Mod 3
ResidentialPOWER EQUIPMENT OPERATORS: (3) BULLDOZER; ROLLER BLACKTOP; FRONT END LOADER 1 < 2 CU YD (PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, …ENGI0825-006$58.22 $95.72 NJ20260007 Mod 3
ResidentialPOWER EQUIPMENT OPERATORS: (4) ROLLER INCLUDING SUBGRADE ROLLER; FRONT END LOADER < 1 CU YD (PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, …ENGI0825-006$56.59 $94.09 NJ20260007 Mod 3
ResidentialPOWER EQUIPMENT OPERATORS: (1) BACKHOE INCLUDING BACKHOE TRACK; CRANE; FRONT END LOADER 5 CU YD AND OVER (PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY …ENGI0825-006$61.72 $99.22 NJ20260007 Mod 3
ResidentialPOWER EQUIPMENT OPERATORS: (2) BACKHOE LOADER COMBO; FRONT END LOADER 2 YD < 5 CU YD; HYDRAULIC CRANE < 10 CU YD (PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S …ENGI0825-006$60.13 $97.63 NJ20260007 Mod 3

Davis-Bacon rates from SAM.gov, read October 25, 2026. Our federal totals are base plus fringe; DOL prints no total. New Jersey Davis-Bacon changes

How Burlington County compares

The main operating engineer rate in every county that has one, and how the pay splits here and nearby. All bars use the same scale.

Every county in New Jersey

Wage and fringe benefits, nearby

  1. Burlington Countybase $61.63$104.08
  2. Camden Countybase $61.63$104.08
  3. Ocean Countybase $61.63$104.08
  4. Gloucester Countybase $61.63$104.08

Operating Engineer rates in nearby counties

Current NJDOL rates. Rates "are generally set for each of the State's twenty-one (21) counties", and some crafts are statewide (NJDOL FAQ).

NJDOL's operating engineer rates for Burlington County are the same as in 20 other counties: Atlantic, Bergen, Camden, Cape May, Cumberland, Essex, Gloucester, Hudson and 12 more.

CountyClassificationBase wageTotal ratevs Burlington County
Burlington CountyOPERATING ENGINEERS: Backhoe (combination)$61.63 $104.08 
Camden CountyOPERATING ENGINEERS: Backhoe (combination)$61.63 $104.08 same
Ocean CountyOPERATING ENGINEERS: Backhoe (combination)$61.63 $104.08 same
Gloucester CountyOPERATING ENGINEERS: Backhoe (combination)$61.63 $104.08 same
Atlantic CountyOPERATING ENGINEERS: Backhoe (combination)$61.63 $104.08 same
Mercer CountyOPERATING ENGINEERS: Backhoe (combination)$61.63 $104.08 same
Monmouth CountyOPERATING ENGINEERS: Backhoe (combination)$61.63 $104.08 same

New Jersey operating engineer prevailing wage by county, with a map

More from NJDOL on this rate

All Burlington County prevailing wage rates

Are you being paid this rate?

Add your wage to what your employer pays into benefits for you, or pays you in cash each payday, and compare it with the total. Rates for every craft, including future increases, must be posted on site, and certified payroll goes to NJDOL within 10 days of payday (N.J.S.A. 34:11-56.29). NJDOL Public Contracts: (609) 292-2259.

Source

Department of Labor and Workforce Development (NJDOL), NJDOL county package NJDOL-20261019-statewide, issued October 19, 2026, effective July 1, 2026, page 71: lwdwebpt.dol.state.nj.us/archivewages/292125119-atlantic-10-19-2026.pdf

We read every county package of October 19, 2026, including its statewide pages, and check every number with a second, separate reader. Wage plus benefit equals NJDOL's printed total on every step that prints both. How we check · Download Burlington County as CSV · Report an error