Skip to content

Home / Wisconsin / Cement Mason / Burnett County group

Wisconsin · Cement Mason · 3 counties

Cement Mason prevailing wage, Burnett County group, Wisconsin (3 counties)

DOL sets the same cement mason rates, row for row, in 3 counties: Burnett, Iron and Washburn. Every figure on this page applies in each of them.

Which kind of construction is the job?

The kind of construction decides the rate: each wage determination covers one. Residential covers homes and apartments up to four stories.

$79.12an hour, base wage + fringe benefits (our sum)

$47.22 base wage + $31.90 fringe benefits

CEMENT MASON/CONCRETE FINISHER AREA A: ASHLAND, BURNETT, BAYFIELD, DOUGLAS, IRON, PRICE, SAWYER, AND WASHBURN COUNTIES · PLAS0599-002

$25.60an hour, base wage + fringe benefits (our sum)

$24.11 base wage + $1.49 fringe benefits

CEMENT MASON/CONCRETE FINISHER · SUWI2012-005

$79.12an hour, base wage + fringe benefits (our sum)

$47.22 base wage + $31.90 fringe benefits

CEMENT MASON/CONCRETE FINISHER AREA A: ASHLAND, BURNETT, BAYFIELD, DOUGLAS, IRON, PRICE, SAWYER, AND WASHBURN COUNTIES · PLAS0599-002

On federally funded or assisted highway construction in each of these 3 counties, a cement mason must be paid at least $79.12 an hour: a $47.22 base wage plus $31.90 in fringe benefits, under wage determination WI20260010 (modification 1). DOL prints no total, so $79.12 is our sum of the two.

Wage determination WI20260010, modification 1, published May 18, 2026, for highway construction; rate identifier PLAS0599-002 (June 1, 2025). Checked against sam.gov on October 25, 2026.

On federally funded or assisted residential construction in each of these 3 counties, a cement mason must be paid at least $25.60 an hour: a $24.11 base wage plus $1.49 in fringe benefits, under wage determination WI20260021 (modification 1). DOL prints no total, so $25.60 is our sum of the two.

Wage determination WI20260021, modification 1, published May 18, 2026, for residential construction; rate identifier SUWI2012-005 (April 4, 2012). Checked against sam.gov on October 25, 2026.

On federally funded or assisted heavy construction in each of these 3 counties, a cement mason must be paid at least $79.12 an hour: a $47.22 base wage plus $31.90 in fringe benefits, under wage determination WI20260015 (modification 1). DOL prints no total, so $79.12 is our sum of the two.

Wage determination WI20260015, modification 1, published May 18, 2026, for heavy construction; rate identifier PLAS0599-002 (June 1, 2025). Checked against sam.gov on October 25, 2026.

Davis-Bacon is the only prevailing wage here (federally funded or assisted work). Wisconsin repealed its local law from January 1, 2017 and its state law for projects bid after September 23, 2017 (2017 Act 59; WisDOT).

DOL lists 3 cement mason rates for each of these counties, from $25.60 to $79.12 an hour. See all of them.

Base wage and fringe benefits: $47.22 + $31.90

The base wage is the taxable hourly wage. DOL prints the fringe benefits as one hourly figure, not itemized; it can go to health, pension, vacation and training plans, or be paid as cash where the state allows.

Base wage (taxable)$47.22
Fringe benefits (one figure, not itemized)$31.90
Base + fringe benefits (our sum; DOL prints no total)$79.12

Base wage and fringe benefits: $24.11 + $1.49

The base wage is the taxable hourly wage. DOL prints the fringe benefits as one hourly figure, not itemized; it can go to health, pension, vacation and training plans, or be paid as cash where the state allows.

Base wage (taxable)$24.11
Fringe benefits (one figure, not itemized)$1.49
Base + fringe benefits (our sum; DOL prints no total)$25.60

Base wage and fringe benefits: $47.22 + $31.90

The base wage is the taxable hourly wage. DOL prints the fringe benefits as one hourly figure, not itemized; it can go to health, pension, vacation and training plans, or be paid as cash where the state allows.

Base wage (taxable)$47.22
Fringe benefits (one figure, not itemized)$31.90
Base + fringe benefits (our sum; DOL prints no total)$79.12

When does this rate change?

Every cement mason rate in the Burnett County group

As DOL lists them. The highlighted row is the one this page leads with.

  1. CEMENT MASON/CONCRETE FINISHER AREA A: ASHLAND, BURNETT, BAYFIELD, DOUGLAS, IRON, PRICE, SAWYER, AND WASHBURN COUNTIESHighway · PLAS0599-002$79.12
  2. CEMENT MASON/CONCRETE FINISHER AREA A: ASHLAND, BURNETT, BAYFIELD, DOUGLAS, IRON, PRICE, SAWYER, AND WASHBURN COUNTIESHeavy · PLAS0599-002$79.12
  3. CEMENT MASON/CONCRETE FINISHERResidential · SUWI2012-005$25.60
Hourly rate of each cement mason classification in the Burnett County group, highest first, split into wage and fringe benefits.
ClassificationBase wageFringe benefitsTotal rateWD
CEMENT MASON/CONCRETE FINISHER AREA A: ASHLAND, BURNETT, BAYFIELD, DOUGLAS, IRON, PRICE, SAWYER, AND WASHBURN COUNTIESHighwayPLAS0599-002$47.22 $31.90 $79.12 WI20260010 Mod 1
CEMENT MASON/CONCRETE FINISHER AREA A: ASHLAND, BURNETT, BAYFIELD, DOUGLAS, IRON, PRICE, SAWYER, AND WASHBURN COUNTIESHeavyPLAS0599-002$47.22 $31.90 $79.12 WI20260015 Mod 1
CEMENT MASON/CONCRETE FINISHERResidentialSUWI2012-005$24.11 $1.49 $25.60 WI20260021 Mod 1

How the Burnett County group compares

The main cement mason rate in every county that has one, and how the pay splits here and nearby. All bars use the same scale.

Every county in Wisconsin

$65.09Buffalo$79.12Ashland
BurnettNearby: Iron $79.12, Washburn $79.12Each column is a group of counties with about the same main rate; its height is how many. 0 counties pay more than Burnett, 7 the same, 64 less.

Wage and fringe benefits, nearby

  1. Burnett County groupbase $47.22$79.12
  2. Washburn Countybase $47.22$79.12
  3. Polk Countybase $37.25$65.09
  4. Barron Countybase $46.01$75.32

Which county is in which cement mason group

Every Wisconsin county with a cement mason rate. Counties DOL treats alike share one page; the rest have their own.

CountiesMain classificationBase wageTotal rate
Burnett County group, 3 localities: Burnett, Iron, WashburnCEMENT MASON/CONCRETE FINISHER AREA A: ASHLAND, BURNETT, BAYFIELD, DOUGLAS, IRON, PRICE, SAWYER, AND WASHBURN COUNTIES$47.22 $79.12 
Sawyer County group, 3 localities: Bayfield, Price, SawyerCEMENT MASON/CONCRETE FINISHER (BAYFIELD, PRICE, AND SAWYER COUNTIES)$47.22 $79.12 
Ashland CountyCEMENT MASON/CONCRETE FINISHER AREA A: ASHLAND, BURNETT, BAYFIELD, DOUGLAS, IRON, PRICE, SAWYER, AND WASHBURN COUNTIES$47.22 $79.12 
Douglas CountyCEMENT MASON/CONCRETE FINISHER$47.22 $79.12 
Wood County group, 11 localities: Adams, Florence, Green Lake, Marinette, Marquette, Menominee, Portage, Shawano, Waupaca, Waushara, WoodCEMENT MASON/CONCRETE FINISHER (ADAMS, BARRON, BROWN, CALUMET, CHIPPEWA, CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE, JEFFERSON, KEWAUNEE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, OCONTO, ONEIDA, OUTAGAMIE, POLK, PORTAGE, RUSK, SAUK, SHAWANO, SHEBOYGAN, ST. CROIX, TAYLOR, VILAS, WALWORTH, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD COUNTIES)$46.01 $75.32 
Barron County group, 7 localities: Barron, Forest, Langlade, Lincoln, Oneida, Taylor, VilasCEMENT MASON/CONCRETE FINISHER (ADAMS, BARRON, BROWN, CALUMET, CHIPPEWA, CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE, JEFFERSON, KEWAUNEE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, OCONTO, ONEIDA, OUTAGAMIE, POLK, PORTAGE, RUSK, SAUK, SHAWANO, SHEBOYGAN, ST. CROIX, TAYLOR, VILAS, WALWORTH, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD COUNTIES)$46.01 $75.32 
Brown County group, 3 localities: Brown, Kewaunee, OcontoCEMENT MASON/CONCRETE FINISHER (ADAMS, BARRON, BROWN, CALUMET, CHIPPEWA, CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE, JEFFERSON, KEWAUNEE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, OCONTO, ONEIDA, OUTAGAMIE, POLK, PORTAGE, RUSK, SAUK, SHAWANO, SHEBOYGAN, ST. CROIX, TAYLOR, VILAS, WALWORTH, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD COUNTIES)$46.01 $75.32 
Dodge County group, 3 localities: Dodge, Jefferson, SaukCEMENT MASON/CONCRETE FINISHER (ADAMS, BARRON, BROWN, CALUMET, CHIPPEWA, CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE, JEFFERSON, KEWAUNEE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, OCONTO, ONEIDA, OUTAGAMIE, POLK, PORTAGE, RUSK, SAUK, SHAWANO, SHEBOYGAN, ST. CROIX, TAYLOR, VILAS, WALWORTH, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD COUNTIES)$46.01 $75.32 
Dunn County group, 2 localities: Clark, DunnCEMENT MASON/CONCRETE FINISHER (ADAMS, BARRON, BROWN, CALUMET, CHIPPEWA, CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE, JEFFERSON, KEWAUNEE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, OCONTO, ONEIDA, OUTAGAMIE, POLK, PORTAGE, RUSK, SAUK, SHAWANO, SHEBOYGAN, ST. CROIX, TAYLOR, VILAS, WALWORTH, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD COUNTIES)$46.01 $75.32 
Manitowoc County group, 2 localities: Door, ManitowocCEMENT MASON/CONCRETE FINISHER (ADAMS, BARRON, BROWN, CALUMET, CHIPPEWA, CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE, JEFFERSON, KEWAUNEE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, OCONTO, ONEIDA, OUTAGAMIE, POLK, PORTAGE, RUSK, SAUK, SHAWANO, SHEBOYGAN, ST. CROIX, TAYLOR, VILAS, WALWORTH, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD COUNTIES)$46.01 $75.32 
Marathon County group, 2 localities: Fond du Lac, MarathonCEMENT MASON/CONCRETE FINISHER (ADAMS, BARRON, BROWN, CALUMET, CHIPPEWA, CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE, JEFFERSON, KEWAUNEE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, OCONTO, ONEIDA, OUTAGAMIE, POLK, PORTAGE, RUSK, SAUK, SHAWANO, SHEBOYGAN, ST. CROIX, TAYLOR, VILAS, WALWORTH, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD COUNTIES)$46.01 $75.32 
Outagamie County group, 2 localities: Calumet, OutagamieCEMENT MASON/CONCRETE FINISHER (ADAMS, BARRON, BROWN, CALUMET, CHIPPEWA, CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE, JEFFERSON, KEWAUNEE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, OCONTO, ONEIDA, OUTAGAMIE, POLK, PORTAGE, RUSK, SAUK, SHAWANO, SHEBOYGAN, ST. CROIX, TAYLOR, VILAS, WALWORTH, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD COUNTIES)$46.01 $75.32 
Columbia CountyCEMENT MASON/CONCRETE FINISHER (ADAMS, BARRON, BROWN, CALUMET, CHIPPEWA, CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE, JEFFERSON, KEWAUNEE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, OCONTO, ONEIDA, OUTAGAMIE, POLK, PORTAGE, RUSK, SAUK, SHAWANO, SHEBOYGAN, ST. CROIX, TAYLOR, VILAS, WALWORTH, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD COUNTIES)$46.01 $75.32 
Rusk CountyCEMENT MASON/CONCRETE FINISHER (ADAMS, BARRON, BROWN, CALUMET, CHIPPEWA, CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE, JEFFERSON, KEWAUNEE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, OCONTO, ONEIDA, OUTAGAMIE, POLK, PORTAGE, RUSK, SAUK, SHAWANO, SHEBOYGAN, ST. CROIX, TAYLOR, VILAS, WALWORTH, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD COUNTIES)$46.01 $75.32 
Sheboygan CountyCEMENT MASON/CONCRETE FINISHER (ADAMS, BARRON, BROWN, CALUMET, CHIPPEWA, CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE, JEFFERSON, KEWAUNEE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, OCONTO, ONEIDA, OUTAGAMIE, POLK, PORTAGE, RUSK, SAUK, SHAWANO, SHEBOYGAN, ST. CROIX, TAYLOR, VILAS, WALWORTH, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD COUNTIES)$46.01 $75.32 
St. Croix CountyCEMENT MASON/CONCRETE FINISHER (ADAMS, BARRON, BROWN, CALUMET, CHIPPEWA, CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE, JEFFERSON, KEWAUNEE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, OCONTO, ONEIDA, OUTAGAMIE, POLK, PORTAGE, RUSK, SAUK, SHAWANO, SHEBOYGAN, ST. CROIX, TAYLOR, VILAS, WALWORTH, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD COUNTIES)$46.01 $75.32 
Winnebago CountyCEMENT MASON/CONCRETE FINISHER (ADAMS, BARRON, BROWN, CALUMET, CHIPPEWA, CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE, JEFFERSON, KEWAUNEE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, OCONTO, ONEIDA, OUTAGAMIE, POLK, PORTAGE, RUSK, SAUK, SHAWANO, SHEBOYGAN, ST. CROIX, TAYLOR, VILAS, WALWORTH, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD COUNTIES)$46.01 $75.32 
Kenosha CountyCEMENT MASON/CONCRETE FINISHER$38.04 $69.42 
Racine CountyCEMENT MASON/CONCRETE FINISHER$38.04 $69.42 
Walworth CountyCEMENT MASON/CONCRETE FINISHER (WALWORTH COUNTY)$40.50 $69.40 
Washington County group, 2 localities: Ozaukee, WashingtonCEMENT MASON/CONCRETE FINISHER$43.27 $68.96 
Grant CountyCEMENT MASON/CONCRETE FINISHER (GRANT, GREEN, IOWA, AND LAFAYETTE COUNTIES)$43.27 $68.96 
Green CountyCEMENT MASON/CONCRETE FINISHER (GRANT, GREEN, IOWA, AND LAFAYETTE COUNTIES)$43.27 $68.96 
Iowa CountyCEMENT MASON/CONCRETE FINISHER (GRANT, GREEN, IOWA, AND LAFAYETTE COUNTIES)$43.27 $68.96 
Lafayette CountyCEMENT MASON/CONCRETE FINISHER (GRANT, GREEN, IOWA, AND LAFAYETTE COUNTIES)$43.27 $68.96 
Milwaukee CountyCEMENT MASON/CONCRETE FINISHER$43.27 $68.96 
Waukesha CountyCEMENT MASON/CONCRETE FINISHER$43.27 $68.96 
Pierce CountyCEMENT MASON/CONCRETE FINISHER AREA C: BUFFALO, CRAWFORD, EAU CLAIRE, JACKSON, JUNEAU, LA CROSSE, MONROE, PEPIN, PIERCE, RICHLAND, TREMPEALEAU, AND VERNON COUNTIES$40.06 $68.71 
Dane CountyCEMENT MASON/CONCRETE FINISHER$40.28 $67.82 
Rock CountyCEMENT MASON/CONCRETE FINISHER$40.28 $67.82 
Vernon County group, 6 localities: Buffalo, Crawford, Jackson, Richland, Trempealeau, VernonCEMENT MASON/CONCRETE FINISHER (BUFFALO, CRAWFORD, JACKSON, JUNEAU, MONROE, POLK, RICHLAND, TREMPEALEAU, AND VERNON COUNTIES)$37.25 $65.09 
Chippewa CountyCEMENT MASON/CONCRETE FINISHER$37.25 $65.09 
Eau Claire CountyCEMENT MASON/CONCRETE FINISHER$37.25 $65.09 
Juneau CountyCEMENT MASON/CONCRETE FINISHER (BUFFALO, CRAWFORD, JACKSON, JUNEAU, MONROE, POLK, RICHLAND, TREMPEALEAU, AND VERNON COUNTIES)$37.25 $65.09 
La Crosse CountyCEMENT MASON/CONCRETE FINISHER$37.25 $65.09 
Monroe CountyCEMENT MASON/CONCRETE FINISHER (BUFFALO, CRAWFORD, JACKSON, JUNEAU, MONROE, POLK, RICHLAND, TREMPEALEAU, AND VERNON COUNTIES)$37.25 $65.09 
Pepin CountyCEMENT MASON/CONCRETE FINISHER (PEPIN COUNTY)$37.25 $65.09 
Polk CountyCEMENT MASON/CONCRETE FINISHER (BUFFALO, CRAWFORD, JACKSON, JUNEAU, MONROE, POLK, RICHLAND, TREMPEALEAU, AND VERNON COUNTIES)$37.25 $65.09 

12 groups of counties with identical DOL rates, and 26 counties with rates of their own.

Wisconsin cement mason prevailing wage by county, with a map

More from DOL on this rate

  • SAM.gov wage determinations
  • Davis-Bacon determinations list journeyworker rates. Apprentices in a program registered with DOL or a recognized state agency can be paid the program's percentage of the rate, within its ratio; anyone else gets the full rate (29 CFR 5.5(a)(4)).

Every trade's rates, county by county: Burnett · Iron · Washburn

Are you being paid this rate?

Add your base pay to the fringe your employer pays for you, in cash or into plans, and compare the sum with the total. The Department of Labor's Wage and Hour Division takes complaints: 1-866-487-9243, or dol.gov/agencies/whd/contact/complaints.

Source

U.S. Department of Labor, Wage and Hour Division (DOL), Davis-Bacon wage determinations on SAM.gov, as of October 25, 2026. For the row this page leads with:

We read every active Wisconsin Davis-Bacon wage determination from SAM.gov's own data and check every number with a second, independent read of the same file. DOL prints no total; ours is base plus fringe. How we check · Download every Wisconsin rate as CSV · Report an error