Home / Wisconsin / Cement Mason / Vernon County group
Wisconsin · Cement Mason · 6 counties
Cement Mason prevailing wage, Vernon County group, Wisconsin (6 counties)
DOL sets the same cement mason rates, row for row, in 6 counties: Buffalo, Crawford, Jackson, Richland, Trempealeau and Vernon. Every figure on this page applies in each of them.
$65.09an hour, base wage + fringe benefits (our sum)
$37.25 base wage + $27.84 fringe benefits
CEMENT MASON/CONCRETE FINISHER (BUFFALO, CRAWFORD, JACKSON, JUNEAU, MONROE, POLK, RICHLAND, TREMPEALEAU, AND VERNON COUNTIES) · PLAS0599-007
$27.13an hour, base wage + fringe benefits (our sum)
$25.64 base wage + $1.49 fringe benefits
CEMENT MASON/CONCRETE FINISHER · SUWI2012-006
$68.71an hour, base wage + fringe benefits (our sum)
$40.06 base wage + $28.65 fringe benefits
CEMENT MASON/CONCRETE FINISHER AREA C: BUFFALO, CRAWFORD, EAU CLAIRE, JACKSON, JUNEAU, LA CROSSE, MONROE, PEPIN, PIERCE, RICHLAND, TREMPEALEAU, AND VERNON COUNTIES · PLAS0599-002
$68.71an hour, base wage + fringe benefits (our sum)
$40.06 base wage + $28.65 fringe benefits
CEMENT MASON/CONCRETE FINISHER AREA C: BUFFALO, CRAWFORD, EAU CLAIRE, JACKSON, JUNEAU, LA CROSSE, MONROE, PEPIN, PIERCE, RICHLAND, TREMPEALEAU, AND VERNON COUNTIES · PLAS0599-002
On federally funded or assisted building construction in each of these 6 counties, a cement mason must be paid at least $65.09 an hour: a $37.25 base wage plus $27.84 in fringe benefits, under wage determination WI20260011 (modification 1). DOL prints no total, so $65.09 is our sum of the two.
Wage determination WI20260011, modification 1, published May 18, 2026, for building construction; rate identifier PLAS0599-007 (June 1, 2025). Checked against sam.gov on October 25, 2026.
On federally funded or assisted residential construction in each of these 6 counties, a cement mason must be paid at least $27.13 an hour: a $25.64 base wage plus $1.49 in fringe benefits, under wage determination WI20260022 (modification 1). DOL prints no total, so $27.13 is our sum of the two.
Wage determination WI20260022, modification 1, published May 18, 2026, for residential construction; rate identifier SUWI2012-006 (April 4, 2012). Checked against sam.gov on October 25, 2026.
On federally funded or assisted highway construction in each of these 6 counties, a cement mason must be paid at least $68.71 an hour: a $40.06 base wage plus $28.65 in fringe benefits, under wage determination WI20260010 (modification 1). DOL prints no total, so $68.71 is our sum of the two.
Wage determination WI20260010, modification 1, published May 18, 2026, for highway construction; rate identifier PLAS0599-002 (June 1, 2025). Checked against sam.gov on October 25, 2026.
On federally funded or assisted heavy construction in each of these 6 counties, a cement mason must be paid at least $68.71 an hour: a $40.06 base wage plus $28.65 in fringe benefits, under wage determination WI20260015 (modification 1). DOL prints no total, so $68.71 is our sum of the two.
Wage determination WI20260015, modification 1, published May 18, 2026, for heavy construction; rate identifier PLAS0599-002 (June 1, 2025). Checked against sam.gov on October 25, 2026.
Davis-Bacon is the only prevailing wage here (federally funded or assisted work). Wisconsin repealed its local law from January 1, 2017 and its state law for projects bid after September 23, 2017 (2017 Act 59; WisDOT).
DOL lists 4 cement mason rates for each of these counties, from $27.13 to $68.71 an hour. See all of them.
Base wage and fringe benefits: $37.25 + $27.84
The base wage is the taxable hourly wage. DOL prints the fringe benefits as one hourly figure, not itemized; it can go to health, pension, vacation and training plans, or be paid as cash where the state allows.
| Base wage (taxable) | $37.25 |
| Fringe benefits (one figure, not itemized) | $27.84 |
| Base + fringe benefits (our sum; DOL prints no total) | $65.09 |
Base wage and fringe benefits: $25.64 + $1.49
The base wage is the taxable hourly wage. DOL prints the fringe benefits as one hourly figure, not itemized; it can go to health, pension, vacation and training plans, or be paid as cash where the state allows.
| Base wage (taxable) | $25.64 |
| Fringe benefits (one figure, not itemized) | $1.49 |
| Base + fringe benefits (our sum; DOL prints no total) | $27.13 |
Base wage and fringe benefits: $40.06 + $28.65
The base wage is the taxable hourly wage. DOL prints the fringe benefits as one hourly figure, not itemized; it can go to health, pension, vacation and training plans, or be paid as cash where the state allows.
| Base wage (taxable) | $40.06 |
| Fringe benefits (one figure, not itemized) | $28.65 |
| Base + fringe benefits (our sum; DOL prints no total) | $68.71 |
Base wage and fringe benefits: $40.06 + $28.65
The base wage is the taxable hourly wage. DOL prints the fringe benefits as one hourly figure, not itemized; it can go to health, pension, vacation and training plans, or be paid as cash where the state allows.
| Base wage (taxable) | $40.06 |
| Fringe benefits (one figure, not itemized) | $28.65 |
| Base + fringe benefits (our sum; DOL prints no total) | $68.71 |
When does this rate change?
- A contract keeps the wage determination in its bid documents. Modifications published before bid opening apply to it, though one published less than 10 days before can be left out if the agency finds there isn't time to tell bidders (29 CFR 1.6(c)).
- DOL changes a WD by publishing a numbered modification on SAM.gov. This page reads the modification named in the Source line; the Wisconsin change log lists what each one changed.
Every cement mason rate in the Vernon County group
As DOL lists them. The highlighted row is the one this page leads with.
- CEMENT MASON/CONCRETE FINISHER AREA C: BUFFALO, CRAWFORD, EAU CLAIRE, JACKSON, JUNEAU, LA CROSSE, MONROE, PEPIN, PIERCE, RICHLAND, TREMPEALEAU, AND VERNON COUNTIESHighway · PLAS0599-002$68.71
- CEMENT MASON/CONCRETE FINISHER AREA C: BUFFALO, CRAWFORD, EAU CLAIRE, JACKSON, JUNEAU, LA CROSSE, MONROE, PEPIN, PIERCE, RICHLAND, TREMPEALEAU, AND VERNON COUNTIESHeavy · PLAS0599-002$68.71
- CEMENT MASON/CONCRETE FINISHER (BUFFALO, CRAWFORD, JACKSON, JUNEAU, MONROE, POLK, RICHLAND, TREMPEALEAU, AND VERNON COUNTIES)Building · PLAS0599-007$65.09
- CEMENT MASON/CONCRETE FINISHERResidential · SUWI2012-006$27.13
| Classification | Base wage | Fringe benefits | Total rate | WD |
|---|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER (BUFFALO, CRAWFORD, JACKSON, JUNEAU, MONROE, POLK, RICHLAND, TREMPEALEAU, AND VERNON COUNTIES)BuildingPLAS0599-007 | $37.25 | $27.84 | $65.09 | WI20260011 Mod 1 |
| CEMENT MASON/CONCRETE FINISHER AREA C: BUFFALO, CRAWFORD, EAU CLAIRE, JACKSON, JUNEAU, LA CROSSE, MONROE, PEPIN, PIERCE, RICHLAND, TREMPEALEAU, AND VERNON COUNTIESHighwayPLAS0599-002 | $40.06 | $28.65 | $68.71 | WI20260010 Mod 1 |
| CEMENT MASON/CONCRETE FINISHER AREA C: BUFFALO, CRAWFORD, EAU CLAIRE, JACKSON, JUNEAU, LA CROSSE, MONROE, PEPIN, PIERCE, RICHLAND, TREMPEALEAU, AND VERNON COUNTIESHeavyPLAS0599-002 | $40.06 | $28.65 | $68.71 | WI20260015 Mod 1 |
| CEMENT MASON/CONCRETE FINISHERResidentialSUWI2012-006 | $25.64 | $1.49 | $27.13 | WI20260022 Mod 1 |
How the Vernon County group compares
The main cement mason rate in every county that has one, and how the pay splits here and nearby. All bars use the same scale.
Every county in Wisconsin
Wage and fringe benefits, nearby
- Vernon County groupbase $37.25$65.09
- Crawford Countybase $37.25$65.09
- La Crosse Countybase $37.25$65.09
- Sauk Countybase $46.01$75.32
Which county is in which cement mason group
Every Wisconsin county with a cement mason rate. Counties DOL treats alike share one page; the rest have their own.
| Counties | Main classification | Base wage | Total rate |
|---|---|---|---|
| Burnett County group, 3 localities: Burnett, Iron, Washburn | CEMENT MASON/CONCRETE FINISHER AREA A: ASHLAND, BURNETT, BAYFIELD, DOUGLAS, IRON, PRICE, SAWYER, AND WASHBURN COUNTIES | $47.22 | $79.12 |
| Sawyer County group, 3 localities: Bayfield, Price, Sawyer | CEMENT MASON/CONCRETE FINISHER (BAYFIELD, PRICE, AND SAWYER COUNTIES) | $47.22 | $79.12 |
| Ashland County | CEMENT MASON/CONCRETE FINISHER AREA A: ASHLAND, BURNETT, BAYFIELD, DOUGLAS, IRON, PRICE, SAWYER, AND WASHBURN COUNTIES | $47.22 | $79.12 |
| Douglas County | CEMENT MASON/CONCRETE FINISHER | $47.22 | $79.12 |
| Wood County group, 11 localities: Adams, Florence, Green Lake, Marinette, Marquette, Menominee, Portage, Shawano, Waupaca, Waushara, Wood | CEMENT MASON/CONCRETE FINISHER (ADAMS, BARRON, BROWN, CALUMET, CHIPPEWA, CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE, JEFFERSON, KEWAUNEE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, OCONTO, ONEIDA, OUTAGAMIE, POLK, PORTAGE, RUSK, SAUK, SHAWANO, SHEBOYGAN, ST. CROIX, TAYLOR, VILAS, WALWORTH, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD COUNTIES) | $46.01 | $75.32 |
| Barron County group, 7 localities: Barron, Forest, Langlade, Lincoln, Oneida, Taylor, Vilas | CEMENT MASON/CONCRETE FINISHER (ADAMS, BARRON, BROWN, CALUMET, CHIPPEWA, CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE, JEFFERSON, KEWAUNEE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, OCONTO, ONEIDA, OUTAGAMIE, POLK, PORTAGE, RUSK, SAUK, SHAWANO, SHEBOYGAN, ST. CROIX, TAYLOR, VILAS, WALWORTH, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD COUNTIES) | $46.01 | $75.32 |
| Brown County group, 3 localities: Brown, Kewaunee, Oconto | CEMENT MASON/CONCRETE FINISHER (ADAMS, BARRON, BROWN, CALUMET, CHIPPEWA, CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE, JEFFERSON, KEWAUNEE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, OCONTO, ONEIDA, OUTAGAMIE, POLK, PORTAGE, RUSK, SAUK, SHAWANO, SHEBOYGAN, ST. CROIX, TAYLOR, VILAS, WALWORTH, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD COUNTIES) | $46.01 | $75.32 |
| Dodge County group, 3 localities: Dodge, Jefferson, Sauk | CEMENT MASON/CONCRETE FINISHER (ADAMS, BARRON, BROWN, CALUMET, CHIPPEWA, CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE, JEFFERSON, KEWAUNEE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, OCONTO, ONEIDA, OUTAGAMIE, POLK, PORTAGE, RUSK, SAUK, SHAWANO, SHEBOYGAN, ST. CROIX, TAYLOR, VILAS, WALWORTH, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD COUNTIES) | $46.01 | $75.32 |
| Dunn County group, 2 localities: Clark, Dunn | CEMENT MASON/CONCRETE FINISHER (ADAMS, BARRON, BROWN, CALUMET, CHIPPEWA, CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE, JEFFERSON, KEWAUNEE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, OCONTO, ONEIDA, OUTAGAMIE, POLK, PORTAGE, RUSK, SAUK, SHAWANO, SHEBOYGAN, ST. CROIX, TAYLOR, VILAS, WALWORTH, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD COUNTIES) | $46.01 | $75.32 |
| Manitowoc County group, 2 localities: Door, Manitowoc | CEMENT MASON/CONCRETE FINISHER (ADAMS, BARRON, BROWN, CALUMET, CHIPPEWA, CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE, JEFFERSON, KEWAUNEE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, OCONTO, ONEIDA, OUTAGAMIE, POLK, PORTAGE, RUSK, SAUK, SHAWANO, SHEBOYGAN, ST. CROIX, TAYLOR, VILAS, WALWORTH, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD COUNTIES) | $46.01 | $75.32 |
| Marathon County group, 2 localities: Fond du Lac, Marathon | CEMENT MASON/CONCRETE FINISHER (ADAMS, BARRON, BROWN, CALUMET, CHIPPEWA, CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE, JEFFERSON, KEWAUNEE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, OCONTO, ONEIDA, OUTAGAMIE, POLK, PORTAGE, RUSK, SAUK, SHAWANO, SHEBOYGAN, ST. CROIX, TAYLOR, VILAS, WALWORTH, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD COUNTIES) | $46.01 | $75.32 |
| Outagamie County group, 2 localities: Calumet, Outagamie | CEMENT MASON/CONCRETE FINISHER (ADAMS, BARRON, BROWN, CALUMET, CHIPPEWA, CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE, JEFFERSON, KEWAUNEE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, OCONTO, ONEIDA, OUTAGAMIE, POLK, PORTAGE, RUSK, SAUK, SHAWANO, SHEBOYGAN, ST. CROIX, TAYLOR, VILAS, WALWORTH, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD COUNTIES) | $46.01 | $75.32 |
| Columbia County | CEMENT MASON/CONCRETE FINISHER (ADAMS, BARRON, BROWN, CALUMET, CHIPPEWA, CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE, JEFFERSON, KEWAUNEE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, OCONTO, ONEIDA, OUTAGAMIE, POLK, PORTAGE, RUSK, SAUK, SHAWANO, SHEBOYGAN, ST. CROIX, TAYLOR, VILAS, WALWORTH, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD COUNTIES) | $46.01 | $75.32 |
| Rusk County | CEMENT MASON/CONCRETE FINISHER (ADAMS, BARRON, BROWN, CALUMET, CHIPPEWA, CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE, JEFFERSON, KEWAUNEE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, OCONTO, ONEIDA, OUTAGAMIE, POLK, PORTAGE, RUSK, SAUK, SHAWANO, SHEBOYGAN, ST. CROIX, TAYLOR, VILAS, WALWORTH, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD COUNTIES) | $46.01 | $75.32 |
| Sheboygan County | CEMENT MASON/CONCRETE FINISHER (ADAMS, BARRON, BROWN, CALUMET, CHIPPEWA, CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE, JEFFERSON, KEWAUNEE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, OCONTO, ONEIDA, OUTAGAMIE, POLK, PORTAGE, RUSK, SAUK, SHAWANO, SHEBOYGAN, ST. CROIX, TAYLOR, VILAS, WALWORTH, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD COUNTIES) | $46.01 | $75.32 |
| St. Croix County | CEMENT MASON/CONCRETE FINISHER (ADAMS, BARRON, BROWN, CALUMET, CHIPPEWA, CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE, JEFFERSON, KEWAUNEE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, OCONTO, ONEIDA, OUTAGAMIE, POLK, PORTAGE, RUSK, SAUK, SHAWANO, SHEBOYGAN, ST. CROIX, TAYLOR, VILAS, WALWORTH, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD COUNTIES) | $46.01 | $75.32 |
| Winnebago County | CEMENT MASON/CONCRETE FINISHER (ADAMS, BARRON, BROWN, CALUMET, CHIPPEWA, CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE, JEFFERSON, KEWAUNEE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, OCONTO, ONEIDA, OUTAGAMIE, POLK, PORTAGE, RUSK, SAUK, SHAWANO, SHEBOYGAN, ST. CROIX, TAYLOR, VILAS, WALWORTH, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD COUNTIES) | $46.01 | $75.32 |
| Kenosha County | CEMENT MASON/CONCRETE FINISHER | $38.04 | $69.42 |
| Racine County | CEMENT MASON/CONCRETE FINISHER | $38.04 | $69.42 |
| Walworth County | CEMENT MASON/CONCRETE FINISHER (WALWORTH COUNTY) | $40.50 | $69.40 |
| Washington County group, 2 localities: Ozaukee, Washington | CEMENT MASON/CONCRETE FINISHER | $43.27 | $68.96 |
| Grant County | CEMENT MASON/CONCRETE FINISHER (GRANT, GREEN, IOWA, AND LAFAYETTE COUNTIES) | $43.27 | $68.96 |
| Green County | CEMENT MASON/CONCRETE FINISHER (GRANT, GREEN, IOWA, AND LAFAYETTE COUNTIES) | $43.27 | $68.96 |
| Iowa County | CEMENT MASON/CONCRETE FINISHER (GRANT, GREEN, IOWA, AND LAFAYETTE COUNTIES) | $43.27 | $68.96 |
| Lafayette County | CEMENT MASON/CONCRETE FINISHER (GRANT, GREEN, IOWA, AND LAFAYETTE COUNTIES) | $43.27 | $68.96 |
| Milwaukee County | CEMENT MASON/CONCRETE FINISHER | $43.27 | $68.96 |
| Waukesha County | CEMENT MASON/CONCRETE FINISHER | $43.27 | $68.96 |
| Pierce County | CEMENT MASON/CONCRETE FINISHER AREA C: BUFFALO, CRAWFORD, EAU CLAIRE, JACKSON, JUNEAU, LA CROSSE, MONROE, PEPIN, PIERCE, RICHLAND, TREMPEALEAU, AND VERNON COUNTIES | $40.06 | $68.71 |
| Dane County | CEMENT MASON/CONCRETE FINISHER | $40.28 | $67.82 |
| Rock County | CEMENT MASON/CONCRETE FINISHER | $40.28 | $67.82 |
| Vernon County group, 6 localities: Buffalo, Crawford, Jackson, Richland, Trempealeau, Vernon | CEMENT MASON/CONCRETE FINISHER (BUFFALO, CRAWFORD, JACKSON, JUNEAU, MONROE, POLK, RICHLAND, TREMPEALEAU, AND VERNON COUNTIES) | $37.25 | $65.09 |
| Chippewa County | CEMENT MASON/CONCRETE FINISHER | $37.25 | $65.09 |
| Eau Claire County | CEMENT MASON/CONCRETE FINISHER | $37.25 | $65.09 |
| Juneau County | CEMENT MASON/CONCRETE FINISHER (BUFFALO, CRAWFORD, JACKSON, JUNEAU, MONROE, POLK, RICHLAND, TREMPEALEAU, AND VERNON COUNTIES) | $37.25 | $65.09 |
| La Crosse County | CEMENT MASON/CONCRETE FINISHER | $37.25 | $65.09 |
| Monroe County | CEMENT MASON/CONCRETE FINISHER (BUFFALO, CRAWFORD, JACKSON, JUNEAU, MONROE, POLK, RICHLAND, TREMPEALEAU, AND VERNON COUNTIES) | $37.25 | $65.09 |
| Pepin County | CEMENT MASON/CONCRETE FINISHER (PEPIN COUNTY) | $37.25 | $65.09 |
| Polk County | CEMENT MASON/CONCRETE FINISHER (BUFFALO, CRAWFORD, JACKSON, JUNEAU, MONROE, POLK, RICHLAND, TREMPEALEAU, AND VERNON COUNTIES) | $37.25 | $65.09 |
12 groups of counties with identical DOL rates, and 26 counties with rates of their own.
Wisconsin cement mason prevailing wage by county, with a map
More from DOL on this rate
- SAM.gov wage determinations
- Davis-Bacon determinations list journeyworker rates. Apprentices in a program registered with DOL or a recognized state agency can be paid the program's percentage of the rate, within its ratio; anyone else gets the full rate (29 CFR 5.5(a)(4)).
Every trade's rates, county by county: Buffalo · Crawford · Jackson · Richland · Trempealeau · Vernon
Are you being paid this rate?
Add your base pay to the fringe your employer pays for you, in cash or into plans, and compare the sum with the total. The Department of Labor's Wage and Hour Division takes complaints: 1-866-487-9243, or dol.gov/agencies/whd/contact/complaints.
Source
U.S. Department of Labor, Wage and Hour Division (DOL), Davis-Bacon wage determinations on SAM.gov, as of October 25, 2026. For the row this page leads with:
- Buffalo: WI20260011 Mod 1
- Crawford: WI20260011 Mod 1
- Jackson: WI20260011 Mod 1
- Richland: WI20260011 Mod 1
- Trempealeau: WI20260011 Mod 1
- Vernon: WI20260011 Mod 1
We read every active Wisconsin Davis-Bacon wage determination from SAM.gov's own data and check every number with a second, independent read of the same file. DOL prints no total; ours is base plus fringe. How we check · Download every Wisconsin rate as CSV · Report an error