Home / Arizona / Yavapai County / Operating Engineer
Yavapai County, AZ · Operating Engineer
Operating Engineer prevailing wage in Yavapai County, Arizona
$49.56an hour, base + fringe · CRANE
$36.04 wage + $13.52 fringe benefits · Building · ENGI0428-017
On federally funded or assisted building construction in Yavapai County, an operating engineer working as crane must be paid at least $49.56 an hour: a $36.04 base wage plus $13.52 in fringe benefits, under wage determination AZ20260043 (modification 1). DOL prints no total, so $49.56 is our sum of the two.
Wage determination AZ20260043, modification 1, published May 18, 2026, for building construction; rate identifier ENGI0428-017 (June 1, 2023). Checked against sam.gov on October 25, 2026.
Davis-Bacon is the only prevailing wage here (federally funded or assisted work). Arizona bars its agencies and political subdivisions from requiring a prevailing wage (A.R.S. 34-321).
DOL lists 52 operating engineer rates for Yavapai County, from $15.00 to $55.79 an hour. See all of them.
Base wage and fringe benefits: $36.04 + $13.52
The base wage is the taxable hourly wage. DOL prints the fringe benefits as one hourly figure, not itemized; it can go to health, pension, vacation and training plans, or be paid as cash where the state allows.
| Base wage (taxable) | $36.04 |
| Fringe benefits (one figure, not itemized) | $13.52 |
| Base + fringe benefits (our sum; DOL prints no total) | $49.56 |
When this rate changes
- A contract keeps the wage determination in its bid documents. Modifications published before bid opening apply to it, though one published less than 10 days before can be left out if the agency finds there isn't time to tell bidders (29 CFR 1.6(c)).
- DOL changes a WD by publishing a numbered modification on SAM.gov. This page reads the modification named in the Source line; the Arizona change log lists what each one changed.
Every operating engineer rate in Yavapai County
As DOL lists them. The highlighted row is the one this page leads with.
| Classification | Base + fringe | Base | Fringe benefits | WD |
|---|---|---|---|---|
| POWER EQUIPMENT OPERATOR: LOADERBuildingENGI0428-017 | $48.48 | $34.96 | $13.52 | AZ20260043 Mod 1 |
| POWER EQUIPMENT OPERATOR: CRANEBuildingENGI0428-017 | $49.56 | $36.04 | $13.52 | AZ20260043 Mod 1 |
| POWER EQUIPMENT OPERATOR: BULLDOZERBuildingENGI0428-017 | $45.21 | $31.69 | $13.52 | AZ20260043 Mod 1 |
| OPERATOR: ROLLERBuildingSUAZ2019-006 | $30.06 | $23.62 | $6.44 | AZ20260043 Mod 1 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOEBuildingSUAZ2019-006 | $30.38 | $24.97 | $5.41 | AZ20260043 Mod 1 |
| POWER EQUIPMENT OPERATOR: BULLDOZERHighwayENGI0012-046 | $53.68 | $35.56 | $18.12 | AZ20260049 Mod 1 |
| POWER EQUIPMENT OPERATOR: PAVER/SPREADER/FINISH EQUIPMENT (ASPHALT, AGGREGATE, & CONCRETE)HighwayENGI0012-051 | $53.68 | $35.56 | $18.12 | AZ20260049 Mod 1 |
| POWER EQUIPMENT OPERATOR: SCRAPERHighwayENGI0012-052 | $53.68 | $35.56 | $18.12 | AZ20260049 Mod 1 |
| POWER EQUIPMENT OPERATOR: TRACTORHighwayENGI0012-053 | $53.68 | $35.56 | $18.12 | AZ20260049 Mod 1 |
| POWER EQUIPMENT OPERATOR: (DRILL RIG/AUGER)HighwayENGI0012-057 | $54.76 | $36.64 | $18.12 | AZ20260049 Mod 1 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADERHighwayENGI0012-064 | $50.41 | $32.29 | $18.12 | AZ20260049 Mod 1 |
| POWER EQUIPMENT OPERATOR: BACKHOE/BACKHOE & LOADER COMBO/TRACK BACKHOEHighwayENGI0012-066 | $53.68 | $35.56 | $18.12 | AZ20260049 Mod 1 |
| POWER EQUIPMENT OPERATOR: COMPACTOR/ROLLERHighwayENGI0012-067 | $53.68 | $35.56 | $18.12 | AZ20260049 Mod 1 |
| POWER EQUIPMENT OPERATOR: LOADER/FRONT END LOADERHighwayENGI0012-069 | $53.68 | $35.56 | $18.12 | AZ20260049 Mod 1 |
| POWER EQUIPMENT OPERATOR: CRANE/DERRICKHighwayENGI0012-071 | $54.76 | $36.64 | $18.12 | AZ20260049 Mod 1 |
| POWER EQUIPMENT OPERATOR: EXCAVATOR/TRACKHOE (GREATER THAN 1/2 CUBIC YARD)HighwayENGI0012-072 | $54.76 | $36.64 | $18.12 | AZ20260049 Mod 1 |
| POWER EQUIPMENT OPERATOR: EXCAVATOR/TRACKHOE (1/2 CUBIC YARD OR SMALLER)HighwayENGI0012-072 | $53.68 | $35.56 | $18.12 | AZ20260049 Mod 1 |
| POWER EQUIPMENT OPERATOR: MOTOR GRADER/BLADEHighwayENGI0012-074 | $54.76 | $36.64 | $18.12 | AZ20260049 Mod 1 |
| POWER EQUIPMENT OPERATOR: MECHANICHighwayENGI0012-075 | $55.79 | $37.67 | $18.12 | AZ20260049 Mod 1 |
| POWER EQUIPMENT OPERATOR: HORIZONTAL DIRECTIONAL DRILLHighwayLABO1184-016 | $41.24 | $31.98 | $9.26 | AZ20260049 Mod 1 |
| POWER EQUIPMENT OPERATOR: TRENCHERHighwayLABO1184-033 | $40.14 | $30.88 | $9.26 | AZ20260049 Mod 1 |
| POWER EQUIPMENT OPERATOR: FORKLIFTHighwayLABO1184-044 | $40.14 | $30.88 | $9.26 | AZ20260049 Mod 1 |
| POWER EQUIPMENT OPERATOR: OILERHighwaySUAZ2023-026 | $42.25 | $31.56 | $10.69 | AZ20260049 Mod 1 |
| POWER EQUIPMENT OPERATOR: MILLING MACHINEHighwaySUAZ2023-026 | $36.54 | $30.09 | $6.45 | AZ20260049 Mod 1 |
| POWER EQUIPMENT OPERATOR: FIELD EQUIPMENT SERVICEPERSONHighwaySUAZ2023-026 | $46.89 | $35.39 | $11.50 | AZ20260049 Mod 1 |
| POWER EQUIPMENT OPERATOR: CONCRETE SCREEDHighwaySUAZ2023-026 | $32.85 | $25.70 | $7.15 | AZ20260049 Mod 1 |
| POWER EQUIPMENT OPERATOR: BROOM/SWEEPERHighwaySUAZ2023-026 | $33.73 | $26.47 | $7.26 | AZ20260049 Mod 1 |
| POWER EQUIPMENT OPERATOR: OILERHeavyENGI0012-035 | $50.41 | $32.29 | $18.12 | AZ20260061 Mod 1 |
| POWER EQUIPMENT OPERATOR: FIELD EQUIPMENT SERVICEPERSONHeavyENGI0012-037 | $53.68 | $35.56 | $18.12 | AZ20260061 Mod 1 |
| POWER EQUIPMENT OPERATOR: CRANE/DERRICKHeavyENGI0012-042 | $54.76 | $36.64 | $18.12 | AZ20260061 Mod 1 |
| POWER EQUIPMENT OPERATOR: MECHANICHeavyENGI0012-043 | $55.79 | $37.67 | $18.12 | AZ20260061 Mod 1 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADERHeavyENGI0012-044 | $50.41 | $32.29 | $18.12 | AZ20260061 Mod 1 |
| POWER EQUIPMENT OPERATOR: BACKHOE/BACKHOE & LOADER COMBO/TRACK BACKHOEHeavyENGI0012-045 | $53.68 | $35.56 | $18.12 | AZ20260061 Mod 1 |
| POWER EQUIPMENT OPERATOR: BULLDOZERHeavyENGI0012-046 | $53.68 | $35.56 | $18.12 | AZ20260061 Mod 1 |
| POWER EQUIPMENT OPERATOR: COMPACTOR/ROLLERHeavyENGI0012-047 | $53.68 | $35.56 | $18.12 | AZ20260061 Mod 1 |
| POWER EQUIPMENT OPERATOR: (DRILL RIG/AUGER)HeavyENGI0012-048 | $53.68 | $35.56 | $18.12 | AZ20260061 Mod 1 |
| POWER EQUIPMENT OPERATOR: LOADER/FRONT END LOADERHeavyENGI0012-049 | $53.68 | $35.56 | $18.12 | AZ20260061 Mod 1 |
| POWER EQUIPMENT OPERATOR: TRENCHERHeavyENGI0012-054 | $53.68 | $35.56 | $18.12 | AZ20260061 Mod 1 |
| POWER EQUIPMENT OPERATOR: EXCAVATOR/TRACKHOEHeavyENGI0012-058 | $54.76 | $36.64 | $18.12 | AZ20260061 Mod 1 |
| POWER EQUIPMENT OPERATOR: MOTOR GRADER/BLADEHeavyENGI0012-061 | $54.76 | $36.64 | $18.12 | AZ20260061 Mod 1 |
| POWER EQUIPMENT OPERATOR: FORKLIFTHeavyLABO1184-015 | $40.14 | $30.88 | $9.26 | AZ20260061 Mod 1 |
| POWER EQUIPMENT OPERATOR: HORIZONTAL DIRECTIONAL DRILLHeavyLABO1184-016 | $41.24 | $31.98 | $9.26 | AZ20260061 Mod 1 |
| POWER EQUIPMENT OPERATOR: SCRAPERHeavySUAZ2023-011 | $32.41 | $32.41 | $0.00 | AZ20260061 Mod 1 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADEResidentialENGI0428-005 | $47.06 | $34.49 | $12.57 | AZ20260012 Mod 1 |
| OPERATOR: TRACTORResidentialSUAZ2011-005 | $20.98 | $20.98 | $0.00 | AZ20260012 Mod 1 |
| OPERATOR: SCRAPERResidentialSUAZ2011-005 | $20.72 | $19.20 | $1.52 | AZ20260012 Mod 1 |
| OPERATOR: ROLLERResidentialSUAZ2011-005 | $17.66 | $16.24 | $1.42 | AZ20260012 Mod 1 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)ResidentialSUAZ2011-005 | $20.75 | $20.75 | $0.00 | AZ20260012 Mod 1 |
| OPERATOR: LOADER (FRONT END)ResidentialSUAZ2011-005 | $15.00 | $15.00 | $0.00 | AZ20260012 Mod 1 |
| OPERATOR: FORKLIFTResidentialSUAZ2011-005 | $16.00 | $16.00 | $0.00 | AZ20260012 Mod 1 |
| OPERATOR: EXCAVATORResidentialSUAZ2011-005 | $24.67 | $24.67 | $0.00 | AZ20260012 Mod 1 |
| OPERATOR: BACKHOEResidentialSUAZ2011-005 | $18.29 | $18.29 | $0.00 | AZ20260012 Mod 1 |
How Yavapai County compares
The main operating engineer rate in every county that has one, and how the pay splits here and nearby. All bars use the same scale.
Every county in Arizona
Wage and fringe benefits, nearby
- Yavapai Countybase $36.04$49.56
- Maricopa Countybase $36.04$49.56
- Coconino Countybase $36.04$49.56
- La Paz Countybase $14.00$15.80
Operating Engineer rates in nearby counties
Current DOL rates. Davis-Bacon rates are set for groups of counties, so neighbours often share them; the county where the work is done decides.
| County | Classification | Base + fringe | Base | vs Yavapai County |
|---|---|---|---|---|
| Yavapai County | POWER EQUIPMENT OPERATOR: CRANE | $49.56 | $36.04 | |
| Maricopa County | POWER EQUIPMENT OPERATOR: CRANE | $49.56 | $36.04 | same |
| Coconino County | POWER EQUIPMENT OPERATOR: CRANE | $49.56 | $36.04 | same |
| Mohave County | POWER EQUIPMENT OPERATOR: CRANE | $49.56 | $36.04 | same |
| Pinal County | POWER EQUIPMENT OPERATOR: CRANE | $49.56 | $36.04 | same |
| La Paz County | OPERATOR: BACKHOE | $15.80 | $14.00 | −$33.76 |
| Gila County | OPERATOR: BACKHOE | $15.80 | $14.00 | −$33.76 |
Arizona operating engineer prevailing wage by county, with a map
More from DOL on this rate
- DOL wage determination
- SAM.gov wage determinations
- Davis-Bacon determinations list journeyworker rates. Apprentices in a program registered with DOL or a recognized state agency can be paid the program's percentage of the rate, within its ratio; anyone else gets the full rate (29 CFR 5.5(a)(4)).
Are you being paid this rate?
Add your base pay to the fringe your employer pays for you, in cash or into plans, and compare the sum with the total. The Department of Labor's Wage and Hour Division takes complaints: 1-866-487-9243, or dol.gov/agencies/whd/contact/complaints.
Source
U.S. Department of Labor, Wage and Hour Division (DOL), wage determination AZ20260043 Mod 1, published May 18, 2026: sam.gov/wage-determination/AZ20260043/1
We read every active Arizona Davis-Bacon wage determination from SAM.gov's own data and check every number with a second, independent read of the same file. DOL prints no total; ours is base plus fringe. How we check · Download Yavapai County as CSV · Report an error