Home / California / Mono County / Operating Engineer
Mono County · Operating Engineer
Operating Engineer prevailing wage in Mono County, California
$103.75an hour, total · Group 1
$64.40 wage + $39.35 employer payments
Mono County uses the same operating engineer rates as 10 other counties. See all of them on one page.
On California public works in Mono County, a Group 1 operating engineer must be paid at least $103.75 an hour in total: $64.40 in wages plus $39.35 in employer payments to health, pension, training and other funds. Daily overtime is $135.95 and Sunday and holiday work is $168.15. DIR puts 14 job titles in Group 1, bargeman and brakeman among them.
DIR general determination SC-23-63-2-2026-2, issued August 22, 2026. Expires June 30, 2027. Checked against dir.ca.gov on October 24, 2026.
DIR lists 36 operating engineer rates for Mono County, from $34.11 to $108.61 an hour. See all of them.
Base wage and fringe: $64.40 + $39.35
The basic hourly rate is the taxable wage. The other lines, usually called fringe benefits, are what DIR expects the employer to pay into health, pension and other plans for each hour worked. An employer can pay part of that as extra wages instead, as long as the total per hour stays at $103.75 or more.
| Basic hourly rate (taxable wage) | $64.40 |
| Health and welfare | $17.45 |
| Pension (footnote d) | $17.40 |
| Vacation and holiday (footnote e) | $2.95 |
| Training | $1.10 |
| Other payments | $0.45 |
| Total straight-time hourly rate | $103.75 |
Straight time covers an 8-hour day.
Davis-Bacon operating engineer rate in Mono County
Federally funded or assisted construction here uses the U.S. Department of Labor's wage determinations. When a California awarding body runs a federally funded or assisted project, DIR's rates must be paid where they are higher than the Davis-Bacon rates (DIR public works FAQ).
We don't put a federal figure next to DIR's here, because the federal determinations split this trade into groups that don't line up with DIR's. The federal rows for this trade are below; match the classification to the work.
| Construction | Federal classification | Base + fringe | Base | WD |
|---|---|---|---|---|
| Building, Highway, Heavy | OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 1- BARGEMAN; BRAKEMAN; COMPRESSOR OPERATOR; DITCH WITCH, WITH SEAT OR SIMILAR TYPE EQUIPMENT; ELEVATOR …ENGI0012-024 | $96.60 | $63.40 | CA20260020 Mod 5 |
| Building, Highway, Heavy | OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 3- ASPHALT-RUBBER BLEND OPERATOR; BOBCAT OR SIMILAR TYPE (SKID STEER); EQUIPMENT GREASER (RACK); FORD FERGUSON …ENGI0012-024 | $97.87 | $64.67 | CA20260020 Mod 5 |
| Building, Highway, Heavy | OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 4- ASPHALT PLANT FIREMAN; BACKHOE OPERATOR (MINI-MAX OR SIMILAR TYPE); BORING MACHINE OPERATOR; BOXMAN OR …ENGI0012-024 | $99.16 | $65.96 | CA20260020 Mod 5 |
| Building, Highway, Heavy | OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 6- ARTICULATING MATERIAL HAULER; ASPHALT PLANT ENGINEER; BATCH PLANT OPERATOR; BIT SHARPENER; CONCRETE JOINT …ENGI0012-024 | $99.38 | $66.18 | CA20260020 Mod 5 |
| Building, Highway, Heavy | OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 8- ASPHALT OR CONCRETE SPREADING OPERATOR (TAMPING OR FINISHING); ASPHALT PAVING MACHINE OPERATOR (BARBER …ENGI0012-024 | $99.49 | $66.29 | CA20260020 Mod 5 |
| Building, Highway, Heavy | OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 10- DRILLING MACHINE OPERATOR, BUCKET OR AUGER TYPES (CALWELD 200 B BUCKET OR SIMILAR TYPES-WATSON 3000 OR …ENGI0012-024 | $99.61 | $66.41 | CA20260020 Mod 5 |
| Building, Highway, Heavy | OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 12- AUTO GRADER OPERATOR; AUTOMATIC SLIP FORM OPERATOR; DRILLING MACHINE OPERATOR, BUCKET OR AUGER TYPES …ENGI0012-024 | $99.78 | $66.58 | CA20260020 Mod 5 |
| Building, Highway, Heavy | OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 13- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM (SINGLE ENGINE, UP …ENGI0012-024 | $99.88 | $66.68 | CA20260020 Mod 5 |
| Building, Highway, Heavy | OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 14- CANAL LINER OPERATOR; CANAL TRIMMER OPERATOR; REMOTE- CONTROL EARTH-MOVING EQUIPMENT OPERATOR (OPERATING A …ENGI0012-024 | $99.91 | $66.71 | CA20260020 Mod 5 |
| Building, Highway, Heavy | OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 15- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM (SINGLE ENGINE, …ENGI0012-024 | $99.99 | $66.79 | CA20260020 Mod 5 |
| Building, Highway, Heavy | OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 16- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM (SINGLE ENGINE, …ENGI0012-024 | $100.11 | $66.91 | CA20260020 Mod 5 |
| Building, Highway, Heavy | OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 17- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM (MULTIPLE ENGINE, …ENGI0012-024 | $100.28 | $67.08 | CA20260020 Mod 5 |
| Building, Highway, Heavy | OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 18- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING IN TANDEM (SCRAPERS, BELLY DUMPS AND SIMILAR TYPES …ENGI0012-024 | $100.38 | $67.18 | CA20260020 Mod 5 |
| Building, Highway, Heavy | OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 19- ROTEX CONCRETE BELT OPERATOR (OR SIMILAR TYPES); RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING …ENGI0012-024 | $100.49 | $67.29 | CA20260020 Mod 5 |
| Building, Highway, Heavy | OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 2-0 RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING IN TANDEM (SCRAPERS, BELLY DUMPS AND SIMILAR TYPES …ENGI0012-024 | $100.61 | $67.41 | CA20260020 Mod 5 |
| Building, Highway, Heavy | OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 21- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING IN TANDEM (SCRAPERS, BELLY DUMPS AND SIMILAR TYPES …ENGI0012-024 | $100.78 | $67.58 | CA20260020 Mod 5 |
| Building, Highway, Heavy | OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 22- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH THE TANDEM PUSH-PULL SYSTEM (SINGLE …ENGI0012-024 | $100.88 | $67.68 | CA20260020 Mod 5 |
| Building, Highway, Heavy | OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 23- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH THE TANDEM PUSH-PULL SYSTEM (SINGLE …ENGI0012-024 | $100.99 | $67.79 | CA20260020 Mod 5 |
| Building, Highway, Heavy | OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 24- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH THE TANDEM PUSH-PULL SYSTEM (SINGLE …ENGI0012-024 | $101.11 | $67.91 | CA20260020 Mod 5 |
| Building, Highway, Heavy | OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 1- Skiploader (wheel type up to 3/4 yd. without attachment) PREMIUM PAY: $10.00 per hour shall be paid on all …ENGI0012-024 | $98.45 | $65.25 | CA20260020 Mod 5 |
| Building, Highway, Heavy | OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 3- Dinkey locomotive or motorperson (up to and including 10 tons) PREMIUM PAY: $10.00 per hour shall be paid on …ENGI0012-024 | $99.52 | $66.32 | CA20260020 Mod 5 |
| Building, Highway, Heavy | OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 5- Backhoe operator (up to and including 3/4 yd.); Small Ford, Case or similar; Drill doctor; Grouting machine …ENGI0012-024 | $99.88 | $66.68 | CA20260020 Mod 5 |
| Building, Highway, Heavy | OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 6- Heavy Duty Repairman PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the …ENGI0012-024 | $99.99 | $66.79 | CA20260020 Mod 5 |
| Building, Highway, Heavy | OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 7- Tunnel mole boring machine operator PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator …ENGI0012-024 | $100.11 | $66.91 | CA20260020 Mod 5 |
Davis-Bacon rates from SAM.gov, read October 25, 2026. Our federal totals are base plus fringe; DOL prints no total. California Davis-Bacon changes
Operating Engineer Group 1 job titles
Work DIR classifies in Group 1, copied as printed. The other groups and their rates are in the table below.
- Bargeman
- Brakeman
- Compressor Operator
- Ditchwitch, with seat or similar type equipment
- Elevator Operator - Inside
- Engineer Oiler
- Forklift Operator (includes loed, lull or similar types - under 5 tons)
- Generator Operator
- Generator, Pump or Compressor Plant Operator
- Heavy Duty Repairman Helper
- Inertial Profiler Operator
- Pump Operator
- Signalman
- Switchman
Source: Group 1, page 7
Scheduled increases
DIR has already set these increases. Work on or after each date is paid the higher rate. DIR often leaves part of an increase "to be allocated to wages and/or employer payments" and confirms the split when it comes due, and it can reduce a scheduled increase in a later notice, so check DIR's increase page before you pay it.
| Takes effect | Increase per hour | Total after increase |
|---|---|---|
| July 1, 2027 | +$4.51 | $108.26 |
The double asterisk after DIR's expiration date means the next rate is already set. If the work runs past that date you have to pay the new rate, and DIR says to build it into contracts signed now (DIR FAQ, Q8).
Source: DIR increase PDF
Every operating engineer rate in Mono County
As DIR lists them. The highlighted row is the one this page leads with.
| Classification | Total | Base | Employer payments | Daily OT | Determination |
|---|---|---|---|---|---|
| Landfill Worker (Operating Engineer): Equipment Operator II | $47.64 | $31.25 | $16.39 | $56.525 | SC-63-12-41-2025-1 |
| Landfill Worker (Operating Engineer): Equipment Operator III | $48.68 | $32.25 | $16.43 | $58.025 | SC-63-12-41-2025-1 |
| Group 1 | $103.75 | $64.40 | $39.35 | $135.95 | SC-23-63-2-2026-2 |
TUNNEL (OPERATING ENGINEER) #: Group 11 job in this group
| $105.60 | $66.25 | $39.35 | $138.725 | SC-23-63-2-2026-2C |
Group 1020 jobs in this group
| $106.76 | $67.41 | $39.35 | $140.465 | SC-23-63-2-2026-2 |
Group 1214 jobs in this group
| $106.93 | $67.58 | $39.35 | $140.72 | SC-23-63-2-2026-2 |
Group 131 job in this group
| $107.03 | $67.68 | $39.35 | $140.87 | SC-23-63-2-2026-2 |
Group 145 jobs in this group
| $107.06 | $67.71 | $39.35 | $140.915 | SC-23-63-2-2026-2 |
Group 152 jobs in this group
| $107.14 | $67.79 | $39.35 | $141.035 | SC-23-63-2-2026-2 |
Group 163 jobs in this group
| $107.26 | $67.91 | $39.35 | $141.215 | SC-23-63-2-2026-2 |
Group 172 jobs in this group
| $107.43 | $68.08 | $39.35 | $141.47 | SC-23-63-2-2026-2 |
Group 181 job in this group
| $107.53 | $68.18 | $39.35 | $141.62 | SC-23-63-2-2026-2 |
Group 193 jobs in this group
| $107.64 | $68.29 | $39.35 | $141.785 | SC-23-63-2-2026-2 |
Group 216 jobs in this group
| $104.53 | $65.18 | $39.35 | $137.12 | SC-23-63-2-2026-2 |
TUNNEL (OPERATING ENGINEER) #: Group 21 job in this group
| $106.38 | $67.03 | $39.35 | $139.895 | SC-23-63-2-2026-2C |
Group 202 jobs in this group
| $107.76 | $68.41 | $39.35 | $141.965 | SC-23-63-2-2026-2 |
Group 211 job in this group
| $107.93 | $68.58 | $39.35 | $142.22 | SC-23-63-2-2026-2 |
Group 221 job in this group
| $108.03 | $68.68 | $39.35 | $142.37 | SC-23-63-2-2026-2 |
Group 232 jobs in this group
| $108.14 | $68.79 | $39.35 | $142.535 | SC-23-63-2-2026-2 |
Group 242 jobs in this group
| $108.26 | $68.91 | $39.35 | $142.715 | SC-23-63-2-2026-2 |
Group 254 jobs in this group
| $108.43 | $69.08 | $39.35 | $142.97 | SC-23-63-2-2026-2 |
Group 36 jobs in this group
| $104.82 | $65.47 | $39.35 | $137.555 | SC-23-63-2-2026-2 |
TUNNEL (OPERATING ENGINEER) #: Group 32 jobs in this group
| $106.67 | $67.32 | $39.35 | $140.33 | SC-23-63-2-2026-2C |
Group 425 jobs in this group
| $106.31 | $66.96 | $39.35 | $139.79 | SC-23-63-2-2026-2 |
TUNNEL (OPERATING ENGINEER) #: Group 42 jobs in this group
| $106.81 | $67.46 | $39.35 | $140.54 | SC-23-63-2-2026-2C |
TUNNEL (OPERATING ENGINEER) #: Group 57 jobs in this group
| $107.03 | $67.68 | $39.35 | $140.87 | SC-23-63-2-2026-2C |
Group 636 jobs in this group
| $106.53 | $67.18 | $39.35 | $140.12 | SC-23-63-2-2026-2 |
TUNNEL (OPERATING ENGINEER) #: Group 614 jobs in this group
| $107.14 | $67.79 | $39.35 | $141.035 | SC-23-63-2-2026-2C |
TUNNEL (OPERATING ENGINEER) #: Group 71 job in this group
| $107.26 | $67.91 | $39.35 | $141.215 | SC-23-63-2-2026-2C |
Group 861 jobs in this group
| $106.64 | $67.29 | $39.35 | $140.285 | SC-23-63-2-2026-2 |
TUNNEL (OPERATING ENGINEER) #: Group 81 job in this group
| $108.61 | $69.26 | $39.35 | $143.24 | SC-23-63-2-2026-2C |
TUNNEL (OPERATING ENGINEER) #: Group 91 job in this group
| $107.56 | $68.21 | $39.35 | $141.665 | SC-23-63-2-2026-2C |
| Landfill Worker (Operating Engineer): Heavy Duty Repairman and/or Welder | $57.50 | $40.75 | $16.75 | $70.775 | SC-63-12-41-2025-1 |
| Landfill Worker (Operating Engineer): Laborer/Spotter | $34.11 | $23.60 | $10.51 | $39.47 | SC-63-12-41-2025-1 |
| Landscape Operating Engineer#: Landscape Operating Engineer: Backhoe Operators; Skidsteer; Forklifts-Tree Planting Equipment (jobsite); HDR Welder-Landscape, Irrigation, Operating Engineers' Equipment; Mulching Tractors; Roller Operators; Rubber-tired & Track Earthmoving Equipment; Skiploader Operators; Trencher-31 horsepower and up | $90.56 | $55.51 | $35.05 | $118.315 | SC-63-12-33-2026-2 |
| Landfill Worker (Operating Engineer): PM Tech | $49.97 | $33.50 | $16.47 | $59.90 | SC-63-12-41-2025-1 |
How Mono County compares
The main operating engineer rate in every county that has one, and how the pay splits here and in the nearest counties. All bars use the same scale.
Every county in California
Wage and employer payments, nearby
- Mono Countybase $64.40$103.75
- Tuolumne Countybase $72.22$108.51
- Mariposa Countybase $72.22$108.51
- Alpine Countybase $72.22$108.51
Operating Engineer rates in nearby counties
Current DIR rates. You pay the rate for the county where the work is done, even if your shop is somewhere else.
DIR's operating engineer rates for Mono County are the same as in 10 other counties: Imperial, Inyo, Kern, Los Angeles, Orange, Riverside, San Bernardino, San Luis Obispo and 2 more.
| County | Classification | Total | Base | vs Mono County |
|---|---|---|---|---|
| Tuolumne County | Group 1 | $108.51 | $72.22 | +$4.76 |
| Mariposa County | Group 1 | $108.51 | $72.22 | +$4.76 |
| Alpine County | Group 1 | $108.51 | $72.22 | +$4.76 |
| Madera County | Group 1 | $108.51 | $72.22 | +$4.76 |
| Fresno County | Group 1 | $108.51 | $72.22 | +$4.76 |
| Calaveras County | Group 1 | $108.51 | $72.22 | +$4.76 |
| Mono County | Group 1 | $103.75 | $64.40 |
California operating engineer prevailing wage by county, with a map
Footnotes on this rate
DIR's footnotes, in DIR's words. Several change the rate itself: zone pay, a percentage added to the total, or which overtime hours get which rate.
- a For classifications within each group, see Pages 7 through 11.
- b Rate applies to the first 4 overtime hours. All other daily overtime is paid at the Sunday rate.
- c Rate applies to the first 12 hours worked. All other time is paid at the Sunday rate.
- d Includes an amount for Annuity.
- e Includes an amount withheld for supplemental dues.
DIR's other marks: # means an apprenticeable craft, * means in effect until superseded, ** means the next rate is already set.
More from DIR on this rate
- Holidays (DIR PDF)
- Scope of work: which tasks this rate covers
- Travel and subsistence
- Apprentice rates: DIR publishes these separately, by program. Look them up on DIR.
Are you being paid this rate?
Add your hourly wage to what your employer pays into health, pension and other plans for you, and compare it with $103.75. Plan payments only count if the money goes into the plan; your pay stub won't show them, but plan statements will. The training amount goes to the California Apprenticeship Council or an apprenticeship program, not to you. Check a week of pay.
Contractors on most public works jobs file certified payroll with the state, and anyone can look it up in DIR's CPR public search. If your total comes up short, you can file a public works complaint with the California Labor Commissioner.
Source
California Department of Industrial Relations, general prevailing wage determination SC-23-63-2-2026-2, page 1: www.dir.ca.gov/oprl/2026-2/PWD/Determinations/Southern/SC-023-63-2.pdf
Each figure is copied from DIR's file and checked by a second, separate reader. How we check · How to read a determination · Download Mono County as CSV · Report an error