Skip to content

Home / Davis-Bacon changes / Illinois

Illinois Davis-Bacon wage determination changes, 2026

The U.S. Department of Labor published 77 modifications to 70 of Illinois's Davis-Bacon wage determinations between May 18, 2026 and October 22, 2026 that changed, added or removed a rate. Across them, 9 rates went up, 0 went down, 2,696 rows were added and 162 removed.

From every revision of each WD on SAM.gov, compared row by row (rate identifier and classification) and read twice. 70 of these modifications are dated May 18, 2026, when DOL reissued most WDs. Totals are base plus fringe. A contract keeps the modification in its bid documents, so a later one only reaches new bids. Illinois prevailing wage rates by county

Largest rate changes

The 20 biggest moves in the hourly total (base where the fringe isn't a dollar figure), one row per WD classification.

ClassificationWDBeforeAfterChange
CEMENT MASON/CONCRETE FINISHER (HENDERSON (NORTHERN HALF), MERCER (EXCEPT SOUTHEASTERN PART), ROCK ISLAND, AND WHITESIDE
Cement Mason · PLAS0018-035
IL20260001 mod 6, Oct 22, 2026
Bureau, Bond, Calhoun and 43 more
$51.64$62.64+$11.00
OPERATOR: POWER EQUIPMENT, GROUP 4 (BUILDING AND RESIDENTIAL CONSTRUCTION) BOBCATS AND/OR OTHER SKID STEER LOADERS; BRIC
Operating Engineer · ENGI0150-006
IL20260009 mod 3, Oct 22, 2026
Cook
$110.20$116.25+$6.05
OPERATOR: POWER EQUIPMENT, GROUP 3 (BUILDING AND RESIDENTIAL CONSTRUCTION) AIR COMPRESSOR-SMALL 250 AND UNDER (1 TO 5 NO
Operating Engineer · ENGI0150-006
IL20260009 mod 3, Oct 22, 2026
Cook
$111.95$118.00+$6.05
OPERATOR: POWER EQUIPMENT, GROUP 2 (BUILDING AND RESIDENTIAL CONSTRUCTION) BOBCAT (OVER 3/4 CU YD); BOILERS; BROOM, POWE
Operating Engineer · ENGI0150-006
IL20260009 mod 3, Oct 22, 2026
Cook
$114.50$120.55+$6.05
OPERATOR: POWER EQUIPMENT, GROUP 1 (BUILDING AND RESIDENTIAL CONSTRUCTION) MECHANIC; ASPHALT PLANT*; ASPHALT SPREADER; A
Operating Engineer · ENGI0150-006
IL20260009 mod 3, Oct 22, 2026
Cook
$115.80$121.85+$6.05
OPERATOR: POWER EQUIPMENT, GROUP 4 (BUILDING AND RESIDENTIAL) BOBCATS AND/OR OTHER SKID STEER LOADERS; BRICK FORKLIFTS;
Operating Engineer · ENGI0150-026
IL20260008 mod 3, Oct 22, 2026
Du Page, Kane, Lake and 4 more
$110.20$116.25+$6.05
OPERATOR: POWER EQUIPMENT, GROUP 3 (BUILDING AND RESIDENTIAL) AIR COMPRESSOR-SMALL 250 AND UNDER (1 TO 5 NOT TO EXCEED A
Operating Engineer · ENGI0150-026
IL20260008 mod 3, Oct 22, 2026
Du Page, Kane, Lake and 4 more
$111.95$118.00+$6.05
OPERATOR: POWER EQUIPMENT, GROUP 2 (BUILDING AND RESIDENTIAL) BOBCAT (OVER 3/4 CU YD); BOILERS; BRICK FORKLIFT; BROOM, P
Operating Engineer · ENGI0150-026
IL20260008 mod 3, Oct 22, 2026
Du Page, Kane, Lake and 4 more
$114.50$120.55+$6.05
OPERATOR: POWER EQUIPMENT, GROUP 1 (BUILDING AND RESIDENTIAL) MECHANIC; ASPHALT PLANT*; ASPHALT SPREADER; AUTOGRADE*; BA
Operating Engineer · ENGI0150-026
IL20260008 mod 3, Oct 22, 2026
Du Page, Kane, Lake and 4 more
$115.80$121.85+$6.05

Every modification, newest first

Each row links the new revision on SAM.gov; "before" links the one it replaced.

October 22, 2026 3 modifications

WDConstructionCountiesUpDownAddedRemoved
IL20260009 mod 3 (before)
Largest: OPERATOR: POWER EQUIPMENT, GROUP 4 (BUILDING AND RESIDENTIAL +$6.05
building, residential, highway and heavyCook4
IL20260008 mod 3 (before)
Largest: OPERATOR: POWER EQUIPMENT, GROUP 4 (BUILDING AND RESIDENTIAL +$6.05
building and residentialDu Page, Kane, Lake and 4 more4
IL20260001 mod 6 (before)
Largest: CEMENT MASON/CONCRETE FINISHER (HENDERSON (NORTHERN HALF), M +$11.00
buildingBureau, Bond, Calhoun and 43 more122

July 30, 2026 1 modification

WDConstructionCountiesUpDownAddedRemoved
IL20260015 mod 2 (before)highway and heavyChampaign, De Witt, Douglas and 21 more66

July 14, 2026 1 modification

WDConstructionCountiesUpDownAddedRemoved
IL20260020 mod 2 (before)building, residential, highway and heavyMcLean, Cook, De Kalb and 16 more9191

May 21, 2026 2 modifications

WDConstructionCountiesUpDownAddedRemoved
IL20260011 mod 2 (before)highway and heavyDe Kalb, Du Page, Kane and 5 more11
IL20260001 mod 5 (before)buildingBureau, Bond, Calhoun and 43 more6662

May 18, 2026 70 modifications

WDConstructionCountiesUpDownAddedRemoved
IL20260070 mod 2 (before)residentialSaline10
IL20260069 mod 1 (before)residentialFayette12
IL20260068 mod 1 (before)residentialEffingham14
IL20260067 mod 1 (before)residentialEdwards13
IL20260066 mod 3 (before)residentialPope, Gallatin, Hardin12
IL20260065 mod 1 (before)residentialDe Kalb20
IL20260064 mod 1 (before)residentialCumberland11
IL20260063 mod 1 (before)residentialCrawford9
IL20260062 mod 1 (before)residentialColes11
IL20260061 mod 1 (before)residentialClinton10
IL20260060 mod 1 (before)residentialDouglas, Edgar, Clark17
IL20260059 mod 1 (before)residentialChristian11
IL20260058 mod 1 (before)residentialChampaign10
IL20260057 mod 2 (before)residentialMonroe10
IL20260056 mod 1 (before)residentialMoultrie13
IL20260055 mod 1 (before)residentialOgle26
IL20260054 mod 2 (before)residentialPerry, Randolph21
IL20260053 mod 1 (before)residentialBoone20
IL20260052 mod 2 (before)residentialBond18
IL20260051 mod 2 (before)residentialAlexander11
IL20260050 mod 2 (before)residentialFranklin11
IL20260049 mod 2 (before)residentialMontgomery36
IL20260048 mod 2 (before)residentialRock Island11
IL20260047 mod 2 (before)residentialMenard9
IL20260046 mod 2 (before)residentialMassac11
IL20260045 mod 2 (before)residentialPulaski11
IL20260044 mod 1 (before)residentialRichland9
IL20260043 mod 1 (before)residentialMarion11
IL20260042 mod 2 (before)residentialMacoupin14
IL20260041 mod 2 (before)residentialMcLean11
IL20260040 mod 2 (before)residentialWoodford14
IL20260039 mod 1 (before)residentialShelby12
IL20260038 mod 1 (before)residentialStephenson6
IL20260037 mod 2 (before)residentialUnion11
IL20260036 mod 1 (before)residentialWabash12
IL20260035 mod 1 (before)residentialWashington15
IL20260034 mod 1 (before)residentialLawrence10
IL20260033 mod 2 (before)residentialWayne11
IL20260032 mod 2 (before)residentialJohnson11
IL20260031 mod 1 (before)residentialWhite13
IL20260030 mod 2 (before)residentialJersey8
IL20260029 mod 2 (before)residentialJefferson11
IL20260028 mod 1 (before)residentialJasper12
IL20260027 mod 2 (before)residentialJackson11
IL20260026 mod 1 (before)residentialBureau, Ford, Vermilion and 10 more60
IL20260025 mod 2 (before)residentialHenry15
IL20260024 mod 3 (before)residentialWilliamson11
IL20260023 mod 2 (before)residentialCalhoun, De Witt, Piatt and 17 more38
IL20260022 mod 2 (before)residentialHamilton11
IL20260021 mod 1 (before)residentialClay11
IL20260020 mod 1 (before)building, residential, highway and heavyMcLean, Cook, De Kalb and 16 more91
IL20260019 mod 1 (before)heavyBureau, Alexander, Bond and 99 more13
IL20260018 mod 1 (before)heavyBureau, Alexander, Bond and 99 more68
IL20260017 mod 4 (before)highway and heavyBond, Calhoun, Clinton and 8 more147
IL20260016 mod 1 (before)highway and heavyAlexander, Clay, Effingham and 25 more103
IL20260015 mod 1 (before)highway and heavyChampaign, De Witt, Douglas and 21 more98
IL20260014 mod 1 (before)highway and heavyFulton, Hancock, Knox and 7 more65
IL20260013 mod 1 (before)highway and heavyFord, McLean, Grundy and 7 more87
IL20260012 mod 1 (before)highway and heavyBureau, Lee, Carroll and 7 more84
IL20260011 mod 1 (before)highway and heavyDe Kalb, Du Page, Kane and 5 more104
IL20260010 mod 1 (before)residentialWinnebago20
IL20260009 mod 2 (before)building, residential, highway and heavyCook83
IL20260008 mod 2 (before)building and residentialDu Page, Kane, Lake and 4 more119
IL20260007 mod 2 (before)building and residentialMadison, St Clair81
IL20260006 mod 1 (before)building and residentialKankakee31
IL20260005 mod 1 (before)building and residentialMacon32
IL20260004 mod 2 (before)building and residentialSangamon34
IL20260003 mod 1 (before)building and residentialPeoria, Tazewell35
IL20260002 mod 4 (before)buildingAlexander, Clay, Effingham and 38 more198
IL20260001 mod 4 (before)buildingBureau, Bond, Calhoun and 43 more321

Questions about Illinois's Davis-Bacon changes

How often do Davis-Bacon wage rates change in Illinois?

Whenever DOL modifies a wage determination. Between May 18, 2026 and October 22, 2026, DOL published 77 modifications to 70 Illinois wage determinations that changed, added or removed a rate; 70 of them are dated May 18, 2026, when DOL reissued most WDs.

Which Illinois Davis-Bacon rate changed the most in 2026?

CEMENT MASON/CONCRETE FINISHER (HENDERSON (NORTHERN HALF), MERCER (EXCEPT SOUTHEASTERN PART), ROCK ISLAND, AND WHITESIDE (cement mason) on IL20260001: $51.64 to $62.64 an hour in modification 6, published October 22, 2026, for building construction.

Does a new modification change the rates on my contract?

A contract keeps the wage determination in its bid documents. Modifications published before bid opening apply to it, though one published less than 10 days before can be left out if the agency finds there isn't time to tell bidders (29 CFR 1.6(c)).

Where are the official Illinois wage determinations?

On SAM.gov. Each row on this page links the new revision there and the one it replaced, and every Illinois rate page names its WD and modification.

Davis-Bacon changes in every state · How we check · Report an error