Home / Georgia / Candler County / Operating Engineer
Candler County, GA · Operating Engineer
Operating Engineer prevailing wage in Candler County, Georgia
$14.00an hour, base + fringe
$14.00 wage + $0.00 fringe benefits · Building · SUGA2012-024
Candler County uses the same operating engineer rates as 1 other county. See all of them on one page.
On federally funded or assisted building construction in Candler County, an operating engineer must be paid at least $14.00 an hour: a $14.00 base wage plus $0.00 in fringe benefits, under wage determination GA20260105 (modification 1). DOL prints no total, so $14.00 is our sum of the two.
Wage determination GA20260105, modification 1, published May 18, 2026, for building construction; rate identifier SUGA2012-024 (August 11, 2012). Checked against sam.gov on October 25, 2026.
Davis-Bacon is the only prevailing wage here (federally funded or assisted work). Georgia has no state prevailing wage law (DOL state table).
DOL lists 26 operating engineer rates for Candler County, from $11.89 to $51.70 an hour. See all of them.
Base wage and fringe benefits: $14.00 + $0.00
The base wage is the taxable hourly wage. DOL prints the fringe benefits as one hourly figure, not itemized; it can go to health, pension, vacation and training plans, or be paid as cash where the state allows.
| Base wage (taxable) | $14.00 |
| Base + fringe benefits (our sum; DOL prints no total) | $14.00 |
When this rate changes
- A contract keeps the wage determination in its bid documents. Modifications published before bid opening apply to it, though one published less than 10 days before can be left out if the agency finds there isn't time to tell bidders (29 CFR 1.6(c)).
- DOL changes a WD by publishing a numbered modification on SAM.gov. This page reads the modification named in the Source line; the Georgia change log lists what each one changed.
Every operating engineer rate in Candler County
As DOL lists them. The highlighted row is the one this page leads with.
| Classification | Base + fringe | Base | Fringe benefits | WD |
|---|---|---|---|---|
| POWER EQUIPMENT OPERATOR: CRANE (OVER 250 TONS) (BULLOCH, CANDLER, EMANUEL, EVANS, JENKINS, JOHNSON, MONTGOMERY, SCREVEN, TATTNALL, TOOMBS, TREUTLEN, WASHINGTON, & WHEELER COUNTIES)BuildingENGI0474-032 | $51.70 | $34.00 | $17.70 | GA20260105 Mod 1 |
| POWER EQUIPMENT OPERATOR: CRANE (OVER 120 TONS) (BULLOCH, CANDLER, EMANUEL, EVANS, JENKINS, JOHNSON, MONTGOMERY, SCREVEN, TATTNALL, TOOMBS, TREUTLEN, WASHINGTON, & WHEELER COUNTIES)BuildingENGI0474-032 | $50.70 | $33.00 | $17.70 | GA20260105 Mod 1 |
| POWER EQUIPMENT OPERATOR: CRANE (OVER 10 TONS) (BULLOCH, CANDLER, EMANUEL, EVANS, JENKINS, JOHNSON, MONTGOMERY, SCREVEN, TATTNALL, TOOMBS, TREUTLEN, WASHINGTON, & WHEELER COUNTIES)BuildingENGI0474-032 | $49.70 | $32.00 | $17.70 | GA20260105 Mod 1 |
| OPERATOR: OILERBuildingSUGA2012-024 | $12.00 | $12.00 | $0.00 | GA20260105 Mod 1 |
| OPERATOR: BACKHOE/EXCAVATORBuildingSUGA2012-024 | $14.00 | $14.00 | $0.00 | GA20260105 Mod 1 |
| OPERATOR: SHUTTLE BUGGYHighwaySUGA2014-048 | $12.00 | $12.00 | $0.00 | GA20260214 Mod 1 |
| OPERATOR: SCREEDHighwaySUGA2014-048 | $12.16 | $12.16 | $0.00 | GA20260214 Mod 1 |
| OPERATOR: SCRAPERHighwaySUGA2014-048 | $13.16 | $13.16 | $0.00 | GA20260214 Mod 1 |
| OPERATOR: ROLLERHighwaySUGA2014-048 | $12.25 | $12.25 | $0.00 | GA20260214 Mod 1 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)HighwaySUGA2014-048 | $14.19 | $14.19 | $0.00 | GA20260214 Mod 1 |
| OPERATOR: MILLING MACHINE GROUNDSMANHighwaySUGA2014-048 | $13.00 | $13.00 | $0.00 | GA20260214 Mod 1 |
| OPERATOR: MILLING MACHINEHighwaySUGA2014-048 | $14.03 | $14.03 | $0.00 | GA20260214 Mod 1 |
| OPERATOR: MECHANICHighwaySUGA2014-048 | $21.42 | $21.42 | $0.00 | GA20260214 Mod 1 |
| OPERATOR: LOADERHighwaySUGA2014-048 | $13.85 | $13.85 | $0.00 | GA20260214 Mod 1 |
| OPERATOR: HYDROSEEDERHighwaySUGA2014-048 | $15.64 | $15.64 | $0.00 | GA20260214 Mod 1 |
| OPERATOR: GRADER/BLADEHighwaySUGA2014-048 | $22.01 | $19.17 | $2.84 | GA20260214 Mod 1 |
| OPERATOR: DISTRIBUTORHighwaySUGA2014-048 | $14.82 | $14.82 | $0.00 | GA20260214 Mod 1 |
| OPERATOR: CRANEHighwaySUGA2014-048 | $20.07 | $20.07 | $0.00 | GA20260214 Mod 1 |
| OPERATOR: COMPACTORHighwaySUGA2014-048 | $15.72 | $13.36 | $2.36 | GA20260214 Mod 1 |
| OPERATOR: BULLDOZERHighwaySUGA2014-048 | $15.29 | $15.29 | $0.00 | GA20260214 Mod 1 |
| OPERATOR: BROOM/SWEEPERHighwaySUGA2014-048 | $13.71 | $13.71 | $0.00 | GA20260214 Mod 1 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOEHighwaySUGA2014-048 | $17.47 | $15.67 | $1.80 | GA20260214 Mod 1 |
| OPERATOR: LOADERHeavySUGA2012-093 | $21.77 | $21.77 | $0.00 | GA20260063 Mod 1 |
| OPERATOR: GRADER/BLADEHeavySUGA2012-093 | $27.63 | $25.82 | $1.81 | GA20260063 Mod 1 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOEHeavySUGA2012-093 | $24.89 | $24.89 | $0.00 | GA20260063 Mod 1 |
| OPERATOR: BACKHOE/EXCAVATORResidentialSUGA2008-076 | $11.89 | $11.89 | $0.00 | GA20260020 Mod 1 |
How Candler County compares
The main operating engineer rate in every county that has one, and how the pay splits here and nearby. All bars use the same scale.
Every county in Georgia
Wage and fringe benefits, nearby
- Candler Countybase $14.00$14.00
- Emanuel Countybase $14.00$14.00
- Bulloch Countybase $14.00$14.00
- Effingham Countybase $19.78$30.06
Operating Engineer rates in nearby counties
Current DOL rates. Davis-Bacon rates are set for groups of counties, so neighbours often share them; the county where the work is done decides.
DOL's operating engineer rates for Candler County are the same as in 1 other county: Evans. The closest county with a different rate is Effingham County, at $30.06.
| County | Classification | Base + fringe | Base | vs Candler County |
|---|---|---|---|---|
| Candler County | OPERATOR: BACKHOE/EXCAVATOR | $14.00 | $14.00 | |
| Emanuel County | OPERATOR: BACKHOE/EXCAVATOR | $14.00 | $14.00 | same |
| Bulloch County | OPERATOR: BACKHOE/EXCAVATOR | $14.00 | $14.00 | same |
| Evans County | OPERATOR: BACKHOE/EXCAVATOR | $14.00 | $14.00 | same |
| Tattnall County | OPERATOR: BACKHOE/EXCAVATOR | $14.00 | $14.00 | same |
| Toombs County | OPERATOR: BACKHOE/EXCAVATOR | $14.00 | $14.00 | same |
| Jenkins County | OPERATOR: BACKHOE/EXCAVATOR | $14.00 | $14.00 | same |
Georgia operating engineer prevailing wage by county, with a map
More from DOL on this rate
- DOL wage determination
- SAM.gov wage determinations
- Davis-Bacon determinations list journeyworker rates. Apprentices in a program registered with DOL or a recognized state agency can be paid the program's percentage of the rate, within its ratio; anyone else gets the full rate (29 CFR 5.5(a)(4)).
Are you being paid this rate?
Add your base pay to the fringe your employer pays for you, in cash or into plans, and compare the sum with the total. The Department of Labor's Wage and Hour Division takes complaints: 1-866-487-9243, or dol.gov/agencies/whd/contact/complaints.
Source
U.S. Department of Labor, Wage and Hour Division (DOL), wage determination GA20260105 Mod 1, published May 18, 2026: sam.gov/wage-determination/GA20260105/1
We read every active Georgia Davis-Bacon wage determination from SAM.gov's own data and check every number with a second, independent read of the same file. DOL prints no total; ours is base plus fringe. How we check · Download Candler County as CSV · Report an error