Home / Georgia / Jasper County / Operating Engineer
Jasper County, GA · Operating Engineer
Operating Engineer prevailing wage in Jasper County, Georgia
$41.77an hour, base + fringe
$28.32 wage + $13.45 fringe benefits · Building · ENGI0926-004
Jasper County uses the same operating engineer rates as 1 other county. See all of them on one page.
On federally funded or assisted building construction in Jasper County, an operating engineer must be paid at least $41.77 an hour: a $28.32 base wage plus $13.45 in fringe benefits, under wage determination GA20260313 (modification 2). DOL prints no total, so $41.77 is our sum of the two.
Wage determination GA20260313, modification 2, published May 18, 2026, for building construction; rate identifier ENGI0926-004 (August 1, 2025). Checked against sam.gov on October 25, 2026.
Davis-Bacon is the only prevailing wage here (federally funded or assisted work). Georgia has no state prevailing wage law (DOL state table).
DOL lists 24 operating engineer rates for Jasper County, from $8.96 to $54.61 an hour. See all of them.
Base wage and fringe benefits: $28.32 + $13.45
The base wage is the taxable hourly wage. DOL prints the fringe benefits as one hourly figure, not itemized; it can go to health, pension, vacation and training plans, or be paid as cash where the state allows.
| Base wage (taxable) | $28.32 |
| Fringe benefits (one figure, not itemized) | $13.45 |
| Base + fringe benefits (our sum; DOL prints no total) | $41.77 |
When this rate changes
- A contract keeps the wage determination in its bid documents. Modifications published before bid opening apply to it, though one published less than 10 days before can be left out if the agency finds there isn't time to tell bidders (29 CFR 1.6(c)).
- DOL changes a WD by publishing a numbered modification on SAM.gov. This page reads the modification named in the Source line; the Georgia change log lists what each one changed.
Every operating engineer rate in Jasper County
As DOL lists them. The highlighted row is the one this page leads with.
- OPERATOR: CRANEBuilding · ENGI0926-005$54.61
- OPERATOR: FORKLIFTBuilding · ENGI0926-006$49.01
- OPERATING ENGINEERS: BACKHOE, BULLDOZER, COMPACTOR, AND LOADER (HENRY AND JASPER COUNTIES)Residential · ENGI0474-009$47.87
- OPERATOR: BACKHOE/EXCAVATOR/TRACKHOEBuilding · ENGI0926-004$41.77
- OPERATOR: CRANEHighway · SUGA2022-003$39.31
- OPERATOR: MILLING MACHINEHighway · SUGA2022-003$35.96
- OPERATOR: GRADER/BLADEHighway · SUGA2022-003$30.46
- OPERATOR: BACKHOE/EXCAVATOR/TRACKHOEHeavy · SUGA2017-006$28.87
- OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)Highway · SUGA2022-003$27.72
- OPERATOR: BULLDOZERHighway · SUGA2022-003$27.27
- OPERATOR: BACKHOE/EXCAVATOR/TRACKHOEHighway · SUGA2022-003$27.16
- OPERATOR: CRANEHeavy · SUGA2017-006$25.45
- OPERATOR: SCREEDHighway · SUGA2022-003$25.22
- OPERATOR: LOADERHighway · SUGA2022-003$23.77
- OPERATOR: ROLLERHighway · SUGA2022-003$22.88
- OPERATOR: LOADERBuilding · SUGA2017-028$21.32
- OPERATOR: BOBCAT/SKID STEER/SKID LOADERBuilding · SUGA2017-028$20.24
- OPERATOR: LOADERHeavy · SUGA2017-006$18.51
- OPERATOR: ROLLERBuilding · SUGA2017-028$18.01
- OPERATOR: GRADER/BLADEBuilding · SUGA2017-028$16.80
- OPERATOR: BULLDOZERHeavy · SUGA2017-006$16.29
- OPERATOR: BULLDOZERBuilding · SUGA2017-028$15.23
- OPERATOR: ROLLERHeavy · SUGA2017-006$11.89
- OPERATOR: EXCAVATORResidential · SUGA2008-105$8.96
| Classification | Base + fringe | Base | Fringe benefits | WD |
|---|---|---|---|---|
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOEBuildingENGI0926-004 | $41.77 | $28.32 | $13.45 | GA20260313 Mod 2 |
| OPERATOR: CRANEBuildingENGI0926-005 | $54.61 | $38.53 | $16.08 | GA20260313 Mod 2 |
| OPERATOR: FORKLIFTBuildingENGI0926-006 | $49.01 | $32.93 | $16.08 | GA20260313 Mod 2 |
| OPERATOR: ROLLERBuildingSUGA2017-028 | $18.01 | $16.82 | $1.19 | GA20260313 Mod 2 |
| OPERATOR: LOADERBuildingSUGA2017-028 | $21.32 | $21.32 | $0.00 | GA20260313 Mod 2 |
| OPERATOR: GRADER/BLADEBuildingSUGA2017-028 | $16.80 | $16.80 | $0.00 | GA20260313 Mod 2 |
| OPERATOR: BULLDOZERBuildingSUGA2017-028 | $15.23 | $15.23 | $0.00 | GA20260313 Mod 2 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADERBuildingSUGA2017-028 | $20.24 | $20.24 | $0.00 | GA20260313 Mod 2 |
| OPERATOR: SCREEDHighwaySUGA2022-003 | $25.22 | $21.00 | $4.22 | GA20260003 Mod 1 |
| OPERATOR: ROLLERHighwaySUGA2022-003 | $22.88 | $18.89 | $3.99 | GA20260003 Mod 1 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)HighwaySUGA2022-003 | $27.72 | $23.62 | $4.10 | GA20260003 Mod 1 |
| OPERATOR: MILLING MACHINEHighwaySUGA2022-003 | $35.96 | $29.67 | $6.29 | GA20260003 Mod 1 |
| OPERATOR: LOADERHighwaySUGA2022-003 | $23.77 | $22.37 | $1.40 | GA20260003 Mod 1 |
| OPERATOR: GRADER/BLADEHighwaySUGA2022-003 | $30.46 | $26.18 | $4.28 | GA20260003 Mod 1 |
| OPERATOR: CRANEHighwaySUGA2022-003 | $39.31 | $39.31 | $0.00 | GA20260003 Mod 1 |
| OPERATOR: BULLDOZERHighwaySUGA2022-003 | $27.27 | $24.68 | $2.59 | GA20260003 Mod 1 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOEHighwaySUGA2022-003 | $27.16 | $23.53 | $3.63 | GA20260003 Mod 1 |
| OPERATOR: ROLLERHeavySUGA2017-006 | $11.89 | $11.89 | $0.00 | GA20260291 Mod 1 |
| OPERATOR: LOADERHeavySUGA2017-006 | $18.51 | $17.86 | $0.65 | GA20260291 Mod 1 |
| OPERATOR: CRANEHeavySUGA2017-006 | $25.45 | $25.45 | $0.00 | GA20260291 Mod 1 |
| OPERATOR: BULLDOZERHeavySUGA2017-006 | $16.29 | $16.29 | $0.00 | GA20260291 Mod 1 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOEHeavySUGA2017-006 | $28.87 | $24.17 | $4.70 | GA20260291 Mod 1 |
| OPERATING ENGINEERS: BACKHOE, BULLDOZER, COMPACTOR, AND LOADER (HENRY AND JASPER COUNTIES)ResidentialENGI0474-009 | $47.87 | $30.17 | $17.70 | GA20260049 Mod 1 |
| OPERATOR: EXCAVATORResidentialSUGA2008-105 | $8.96 | $8.96 | $0.00 | GA20260049 Mod 1 |
How Jasper County compares
The main operating engineer rate in every county that has one, and how the pay splits here and nearby. All bars use the same scale.
Every county in Georgia
Wage and fringe benefits, nearby
- Jasper Countybase $28.32$41.77
- Butts Countybase $28.32$41.77
- Putnam Countybase $38.53$54.61
- Newton Countybase $28.32$41.77
Operating Engineer rates in nearby counties
Current DOL rates. Davis-Bacon rates are set for groups of counties, so neighbours often share them; the county where the work is done decides.
DOL's operating engineer rates for Jasper County are the same as in 1 other county: Henry.
| County | Classification | Base + fringe | Base | vs Jasper County |
|---|---|---|---|---|
| Putnam County | OPERATOR: CRANE | $54.61 | $38.53 | +$12.84 |
| Jasper County | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $41.77 | $28.32 | |
| Butts County | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $41.77 | $28.32 | same |
| Newton County | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $41.77 | $28.32 | same |
| Morgan County | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $41.77 | $28.32 | same |
| Jones County | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $14.24 | $14.24 | −$27.53 |
| Monroe County | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $14.24 | $14.24 | −$27.53 |
Georgia operating engineer prevailing wage by county, with a map
More from DOL on this rate
- DOL wage determination
- SAM.gov wage determinations
- Davis-Bacon determinations list journeyworker rates. Apprentices in a program registered with DOL or a recognized state agency can be paid the program's percentage of the rate, within its ratio; anyone else gets the full rate (29 CFR 5.5(a)(4)).
Are you being paid this rate?
Add your base pay to the fringe your employer pays for you, in cash or into plans, and compare the sum with the total. The Department of Labor's Wage and Hour Division takes complaints: 1-866-487-9243, or dol.gov/agencies/whd/contact/complaints.
Source
U.S. Department of Labor, Wage and Hour Division (DOL), wage determination GA20260313 Mod 2, published May 18, 2026: sam.gov/wage-determination/GA20260313/2
We read every active Georgia Davis-Bacon wage determination from SAM.gov's own data and check every number with a second, independent read of the same file. DOL prints no total; ours is base plus fringe. How we check · Download Jasper County as CSV · Report an error