Home / Mississippi / Jones County / Operating Engineer
Jones County, MS · Operating Engineer
Operating Engineer prevailing wage in Jones County, Mississippi
$19.32an hour, base + fringe
$18.00 wage + $1.32 fringe benefits · Building · SUMS2015-008
On federally funded or assisted building construction in Jones County, an operating engineer must be paid at least $19.32 an hour: a $18.00 base wage plus $1.32 in fringe benefits, under wage determination MS20260047 (modification 2). DOL prints no total, so $19.32 is our sum of the two.
Wage determination MS20260047, modification 2, published May 18, 2026, for building construction; rate identifier SUMS2015-008 (April 3, 2017). Checked against sam.gov on October 25, 2026.
Davis-Bacon is the only prevailing wage here (federally funded or assisted work). Mississippi has no state prevailing wage law (DOL state table).
DOL lists 23 operating engineer rates for Jones County, from $10.75 to $19.32 an hour. See all of them.
Base wage and fringe benefits: $18.00 + $1.32
The base wage is the taxable hourly wage. DOL prints the fringe benefits as one hourly figure, not itemized; it can go to health, pension, vacation and training plans, or be paid as cash where the state allows.
| Base wage (taxable) | $18.00 |
| Fringe benefits (one figure, not itemized) | $1.32 |
| Base + fringe benefits (our sum; DOL prints no total) | $19.32 |
When this rate changes
- A contract keeps the wage determination in its bid documents. Modifications published before bid opening apply to it, though one published less than 10 days before can be left out if the agency finds there isn't time to tell bidders (29 CFR 1.6(c)).
- DOL changes a WD by publishing a numbered modification on SAM.gov. This page reads the modification named in the Source line; the Mississippi change log lists what each one changed.
Every operating engineer rate in Jones County
As DOL lists them. The highlighted row is the one this page leads with.
- OPERATOR: BACKHOE/EXCAVATOR/TRACKHOEBuilding · SUMS2015-008$19.32
- OPERATOR: DRILLHighway · SUMS2010-017$19.22
- OPERATOR: CRANEHighway · SUMS2010-017$18.35
- OPERATOR: GRADER/BLADEHighway · SUMS2010-017$16.89
- OPERATOR: MILLING MACHINEHighway · SUMS2010-017$16.59
- OPERATOR: MECHANICHighway · SUMS2010-017$15.41
- OPERATOR: ASPHALT SPREADERHighway · SUMS2010-017$15.33
- OPERATOR: BULLDOZER, INCLUDES WATER SEWER LINESHeavy · SUMS2015-033$14.71
- OPERATOR: TRACKHOEHeavy · SUMS2015-033$14.68
- OPERATOR: LOADERHighway · SUMS2010-017$14.31
- OPERATOR: BACKHOE/EXCAVATOR/TRACKHOEHighway · SUMS2010-017$14.29
- OPERATOR: TRENCHERHighway · SUMS2010-017$13.75
- OPERATOR: BACKHOEResidential · SUMS2007-009$13.63
- OPERATOR: BULLDOZERHighway · SUMS2010-017$13.16
- OPERATOR: BULLDOZERResidential · SUMS2007-009$13.13
- OPERATOR: OILERHighway · SUMS2010-017$13.05
- OPERATOR: SCRAPERHighway · SUMS2010-017$12.63
- OPERATOR: MIXERHighway · SUMS2010-017$12.42
- OPERATOR: ROLLER (ALL TYPES)Highway · SUMS2010-017$12.24
- OPERATOR: DISTRIBUTORHighway · SUMS2010-017$12.00
- OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)Highway · SUMS2010-017$11.69
- OPERATOR: TRACTORHighway · SUMS2010-017$11.02
- OPERATOR: BROOM/SWEEPERHighway · SUMS2010-017$10.75
| Classification | Base + fringe | Base | Fringe benefits | WD |
|---|---|---|---|---|
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOEBuildingSUMS2015-008 | $19.32 | $18.00 | $1.32 | MS20260047 Mod 2 |
| OPERATOR: TRENCHERHighwaySUMS2010-017 | $13.75 | $13.75 | $0.00 | MS20260094 Mod 2 |
| OPERATOR: TRACTORHighwaySUMS2010-017 | $11.02 | $11.02 | $0.00 | MS20260094 Mod 2 |
| OPERATOR: SCRAPERHighwaySUMS2010-017 | $12.63 | $12.63 | $0.00 | MS20260094 Mod 2 |
| OPERATOR: ROLLER (ALL TYPES)HighwaySUMS2010-017 | $12.24 | $12.24 | $0.00 | MS20260094 Mod 2 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)HighwaySUMS2010-017 | $11.69 | $11.69 | $0.00 | MS20260094 Mod 2 |
| OPERATOR: OILERHighwaySUMS2010-017 | $13.05 | $13.05 | $0.00 | MS20260094 Mod 2 |
| OPERATOR: MIXERHighwaySUMS2010-017 | $12.42 | $12.42 | $0.00 | MS20260094 Mod 2 |
| OPERATOR: MILLING MACHINEHighwaySUMS2010-017 | $16.59 | $16.59 | $0.00 | MS20260094 Mod 2 |
| OPERATOR: MECHANICHighwaySUMS2010-017 | $15.41 | $15.41 | $0.00 | MS20260094 Mod 2 |
| OPERATOR: LOADERHighwaySUMS2010-017 | $14.31 | $14.31 | $0.00 | MS20260094 Mod 2 |
| OPERATOR: GRADER/BLADEHighwaySUMS2010-017 | $16.89 | $16.89 | $0.00 | MS20260094 Mod 2 |
| OPERATOR: DRILLHighwaySUMS2010-017 | $19.22 | $19.22 | $0.00 | MS20260094 Mod 2 |
| OPERATOR: DISTRIBUTORHighwaySUMS2010-017 | $12.00 | $12.00 | $0.00 | MS20260094 Mod 2 |
| OPERATOR: CRANEHighwaySUMS2010-017 | $18.35 | $18.35 | $0.00 | MS20260094 Mod 2 |
| OPERATOR: BULLDOZERHighwaySUMS2010-017 | $13.16 | $13.16 | $0.00 | MS20260094 Mod 2 |
| OPERATOR: BROOM/SWEEPERHighwaySUMS2010-017 | $10.75 | $10.75 | $0.00 | MS20260094 Mod 2 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOEHighwaySUMS2010-017 | $14.29 | $14.29 | $0.00 | MS20260094 Mod 2 |
| OPERATOR: ASPHALT SPREADERHighwaySUMS2010-017 | $15.33 | $15.33 | $0.00 | MS20260094 Mod 2 |
| OPERATOR: BULLDOZER, INCLUDES WATER SEWER LINESHeavySUMS2015-033 | $14.71 | $14.71 | $0.00 | MS20260067 Mod 2 |
| OPERATOR: TRACKHOEHeavySUMS2015-033 | $14.68 | $14.68 | $0.00 | MS20260067 Mod 2 |
| OPERATOR: BULLDOZERResidentialSUMS2007-009 | $13.13 | $13.13 | $0.00 | MS20260012 Mod 1 |
| OPERATOR: BACKHOEResidentialSUMS2007-009 | $13.63 | $13.63 | $0.00 | MS20260012 Mod 1 |
How Jones County compares
The main operating engineer rate in every county that has one, and how the pay splits here and nearby. All bars use the same scale.
Every county in Mississippi
Wage and fringe benefits, nearby
- Jones Countybase $18.00$19.32
- Covington Countybase $18.00$19.32
- Jasper Countybase $18.00$19.32
- Forrest Countybase $17.53$17.53
Operating Engineer rates in nearby counties
Current DOL rates. Davis-Bacon rates are set for groups of counties, so neighbours often share them; the county where the work is done decides.
| County | Classification | Base + fringe | Base | vs Jones County |
|---|---|---|---|---|
| Jones County | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.32 | $18.00 | |
| Covington County | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.32 | $18.00 | same |
| Jasper County | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.32 | $18.00 | same |
| Wayne County | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.32 | $18.00 | same |
| Smith County | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.32 | $18.00 | same |
| Forrest County | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $17.53 | $17.53 | −$1.79 |
| Perry County | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $17.53 | $17.53 | −$1.79 |
Mississippi operating engineer prevailing wage by county, with a map
More from DOL on this rate
- DOL wage determination
- SAM.gov wage determinations
- Davis-Bacon determinations list journeyworker rates. Apprentices in a program registered with DOL or a recognized state agency can be paid the program's percentage of the rate, within its ratio; anyone else gets the full rate (29 CFR 5.5(a)(4)).
Are you being paid this rate?
Add your base pay to the fringe your employer pays for you, in cash or into plans, and compare the sum with the total. The Department of Labor's Wage and Hour Division takes complaints: 1-866-487-9243, or dol.gov/agencies/whd/contact/complaints.
Source
U.S. Department of Labor, Wage and Hour Division (DOL), wage determination MS20260047 Mod 2, published May 18, 2026: sam.gov/wage-determination/MS20260047/2
We read every active Mississippi Davis-Bacon wage determination from SAM.gov's own data and check every number with a second, independent read of the same file. DOL prints no total; ours is base plus fringe. How we check · Download Jones County as CSV · Report an error