Skip to content

Home / Montana / Fergus County / Operating Engineer

Fergus County, MT · Operating Engineer

Operating Engineer prevailing wage in Fergus County, Montana

$49.13an hour, base + benefit

$32.34 wage + $16.79 benefits · Building Construction · District 3 (Bozeman and Great Falls)

Fergus County uses the same operating engineer rates as 13 other counties. See all of them on one page.

On Montana public works in Fergus County, an operating engineer must be paid at least $49.13 an hour: a $32.34 base wage plus $16.79 in benefits. DLI prints no total, so $49.13 is our sum of the two.

DLI 2026 rates, revised April 25, 2026; this rate, effective April 25, 2026. "The wage rates applicable to a particular public works project are those in effect at the time the bid specifications are advertised" (ARM 24.17.127). Checked against erd.dli.mt.gov on October 25, 2026.

DLI lists 21 operating engineer rates for Fergus County, from $41.18 to $60.33 an hour. See all of them.

Base wage and benefits: $32.34 + $16.79

The base wage is the taxable hourly wage. DLI prints the benefits as one hourly figure, not itemized; it can go to health, pension, vacation and training plans, or be paid as cash where the state allows.

Base wage (taxable)$32.34
Fringe benefits (one figure, not itemized)$16.79
Base + benefits (our sum; DLI prints no total)$49.13

Davis-Bacon operating engineer rate in Fergus County

Federally funded or assisted construction here uses the U.S. Department of Labor's wage determinations. Montana's law doesn't apply where federal law sets the rate, so a Davis-Bacon job uses the federal schedule (DLI FAQ).

We don't put a federal figure next to DLI's here, because the federal determinations split this trade into groups that don't line up with DLI's. The federal rows for this trade are below; match the classification to the work.

ConstructionFederal classificationBase + fringeBaseWD
BuildingPOWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR …ENGI0400-003$58.20 $42.00 MT20260031 Mod 1
BuildingPOWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH …ENGI0400-003$56.20 $40.00 MT20260031 Mod 1
BuildingPOWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE …ENGI0400-003$54.20 $38.00 MT20260031 Mod 1
BuildingPOWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE …ENGI0400-003$54.20 $38.00 MT20260031 Mod 1
BuildingOPERATOR: FORKLIFTSUMT2011-007$29.49 $21.44 MT20260031 Mod 1
BuildingOPERATOR: EXCAVATORSUMT2011-007$28.55 $22.98 MT20260031 Mod 1
HighwayPOWER EQUIPMENT OPERATOR: GROUP 2 Air Doctor; Backhoe/Excavator/Shovel up to and including 3 CU Yard; Bit Grinder; Bituminous Paving Travel Plant; Boring …SAMT2026-001$52.05 $38.00 MT20260080 Mod 3
HighwayPOWER EQUIPMENT OPERATOR: GROUP 3 Asphalt Paving Machine; Asphalt Screed; Backhoe/Excavator/Shovel Over 3 CU Yard; Cableway Highline; Concrete Batch Plant; …SAMT2026-001$53.32 $39.27 MT20260080 Mod 3
HighwayPOWER EQUIPMENT OPERATOR: GROUP 4 Asphalt/Hot Plant Operator, Cranes, 25 Tons up to and incl. 44 Tons; Crusher Operator; Finish Motor Patrol; Finish ScraperSAMT2026-001$54.65 $40.60 MT20260080 Mod 3
HighwayPOWER EQUIPMENT OPERATOR: GROUP 5 Cranes, 45 Tons up to and incl. 74 TonsSAMT2026-001$55.90 $41.85 MT20260080 Mod 3
HighwayPOWER EQUIPMENT OPERATOR: GROUP 6 Cranes, 75 Tons up to and incl. 149 Tons; Crane, Whirley (All)SAMT2026-001$57.25 $43.20 MT20260080 Mod 3
HighwayPOWER EQUIPMENT OPERATOR: GROUP 7 Cranes, 150 Tons up to and incl. 250 Tons; Cranes, over 250 tons-add $1.00 for every 100 tons over 250 tons; Crane, Tower …SAMT2026-001$60.20 $46.15 MT20260080 Mod 3
HeavyPOWER EQUIPMENT OPERATOR:, ZONE 1: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, STIFF-LEG OR DERRICK; …ENGI0400-011$58.43 $42.23 MT20260077 Mod 1
HeavyPOWER EQUIPMENT OPERATOR: ZONE 1: (6) CRANES 75 TO AND INCL. 149 TONS; CRANES, WHIRLEY (ALL). ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY …ENGI0400-011$57.35 $41.15 MT20260077 Mod 1
HeavyPOWER EQUIPMENT OPERATOR: ZONE 1: (5) CRANES 45 TONS TO AND INCL. 74 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO …ENGI0400-011$56.27 $40.07 MT20260077 Mod 1
HeavyPOWER EQUIPMENT OPERATOR: ZONE 1: (4) CRANES 25-44 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL …ENGI0400-011$55.18 $38.98 MT20260077 Mod 1
HeavyPOWER EQUIPMENT OPERATOR: ZONE 1: (3) MECHANIC, SCRAPER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL …ENGI0400-011$34.74 $24.34 MT20260077 Mod 1
HeavyPOWER EQUIPMENT OPERATOR: ZONE 1: (2) CRANE OILER, BULLDOZER, ROLLER (DIRT AND GRADE COMPACTION), EXCAVATOR. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE …ENGI0400-011$34.34 $23.94 MT20260077 Mod 1
HeavyOPERATOR: LOADER (FRONT END)SUMT2011-053$32.79 $25.01 MT20260077 Mod 1
HeavyOPERATOR: GRADER/BLADESUMT2011-053$33.89 $25.44 MT20260077 Mod 1
HeavyOPERATOR: BOBCAT/SKID STEER/SKID LOADERSUMT2011-053$31.58 $23.53 MT20260077 Mod 1
HeavyOPERATOR: BACKHOESUMT2011-053$33.76 $25.71 MT20260077 Mod 1

Davis-Bacon rates from SAM.gov, read October 25, 2026. Our federal totals are base plus fringe; DOL prints no total. Montana Davis-Bacon changes

When this rate changes

Every operating engineer rate in Fergus County

As DLI lists them. The highlighted row is the one this page leads with.

  1. CONSTRUCTION EQUIPMENT OPERATORS GROUP 7Heavy Construction · Statewide$60.33
  2. CONSTRUCTION EQUIPMENT OPERATORS GROUP 6Heavy Construction · Statewide$59.25
  3. CONSTRUCTION EQUIPMENT OPERATORS GROUP 5Heavy Construction · Statewide$58.17
  4. CONSTRUCTION EQUIPMENT OPERATORS GROUP 4Heavy Construction · Statewide$57.08
  5. CONSTRUCTION EQUIPMENT OPERATORS GROUP 3Heavy Construction · Statewide$56.01
  6. CONSTRUCTION EQUIPMENT OPERATORS GROUP 7Building Construction · District 3 (Bozeman and Great Falls)$56.00
  7. CONSTRUCTION EQUIPMENT OPERATORS GROUP 2Heavy Construction · Statewide$55.42
  8. CONSTRUCTION EQUIPMENT OPERATORS GROUP 6Building Construction · District 3 (Bozeman and Great Falls)$54.85
  9. CONSTRUCTION EQUIPMENT OPERATORS GROUP 1Heavy Construction · Statewide$54.07
  10. CONSTRUCTION EQUIPMENT OPERATORS GROUP 5Building Construction · District 3 (Bozeman and Great Falls)$53.72
  11. CONSTRUCTION EQUIPMENT OPERATORS GROUP 7Highway Construction · Statewide$53.43
  12. CONSTRUCTION EQUIPMENT OPERATORS GROUP 4Building Construction · District 3 (Bozeman and Great Falls)$51.59
  13. CONSTRUCTION EQUIPMENT OPERATORS GROUP 2Building Construction · District 3 (Bozeman and Great Falls)$51.24
  14. CONSTRUCTION EQUIPMENT OPERATORS GROUP 6Highway Construction · Statewide$50.83
  15. CONSTRUCTION EQUIPMENT OPERATORS GROUP 5Highway Construction · Statewide$49.64
  16. CONSTRUCTION EQUIPMENT OPERATORS GROUP 1Building Construction · District 3 (Bozeman and Great Falls)$49.13
  17. CONSTRUCTION EQUIPMENT OPERATORS GROUP 4Highway Construction · Statewide$48.30
  18. CONSTRUCTION EQUIPMENT OPERATORS GROUP 3Highway Construction · Statewide$47.36
  19. CONSTRUCTION EQUIPMENT OPERATORS GROUP 2Highway Construction · Statewide$46.71
  20. CONSTRUCTION EQUIPMENT OPERATORS GROUP 1Highway Construction · Statewide$44.22
  21. CONSTRUCTION EQUIPMENT OPERATORS GROUP 3Building Construction · District 3 (Bozeman and Great Falls)$41.18
Hourly rate of each operating engineer classification in Fergus County, highest first, split into wage and benefits.
ClassificationBase + benefitBaseBenefitsEffective
CONSTRUCTION EQUIPMENT OPERATORS GROUP 1Building ConstructionDistrict 3 (Bozeman and Great Falls)$49.13 $32.34 $16.79 Apr 25, 2026
CONSTRUCTION EQUIPMENT OPERATORS GROUP 2Building ConstructionDistrict 3 (Bozeman and Great Falls)$51.24 $34.45 $16.79 Apr 25, 2026
CONSTRUCTION EQUIPMENT OPERATORS GROUP 3Building ConstructionDistrict 3 (Bozeman and Great Falls)$41.18 $33.29 $7.89 Apr 25, 2026
CONSTRUCTION EQUIPMENT OPERATORS GROUP 4Building ConstructionDistrict 3 (Bozeman and Great Falls)$51.59 $35.81 $15.78 Apr 25, 2026
CONSTRUCTION EQUIPMENT OPERATORS GROUP 5Building ConstructionDistrict 3 (Bozeman and Great Falls)$53.72 $36.93 $16.79 Apr 25, 2026
CONSTRUCTION EQUIPMENT OPERATORS GROUP 6Building ConstructionDistrict 3 (Bozeman and Great Falls)$54.85 $38.06 $16.79 Apr 25, 2026
CONSTRUCTION EQUIPMENT OPERATORS GROUP 7Building ConstructionDistrict 3 (Bozeman and Great Falls)$56.00 $39.21 $16.79 Apr 25, 2026
CONSTRUCTION EQUIPMENT OPERATORS GROUP 1Heavy ConstructionStatewide$54.07 $35.97 $18.10 Apr 25, 2026
CONSTRUCTION EQUIPMENT OPERATORS GROUP 2Heavy ConstructionStatewide$55.42 $37.32 $18.10 Apr 25, 2026
CONSTRUCTION EQUIPMENT OPERATORS GROUP 3Heavy ConstructionStatewide$56.01 $37.91 $18.10 Apr 25, 2026
CONSTRUCTION EQUIPMENT OPERATORS GROUP 4Heavy ConstructionStatewide$57.08 $38.98 $18.10 Apr 25, 2026
CONSTRUCTION EQUIPMENT OPERATORS GROUP 5Heavy ConstructionStatewide$58.17 $40.07 $18.10 Apr 25, 2026
CONSTRUCTION EQUIPMENT OPERATORS GROUP 6Heavy ConstructionStatewide$59.25 $41.15 $18.10 Apr 25, 2026
CONSTRUCTION EQUIPMENT OPERATORS GROUP 7Heavy ConstructionStatewide$60.33 $42.23 $18.10 Apr 25, 2026
CONSTRUCTION EQUIPMENT OPERATORS GROUP 1Highway ConstructionStatewide$44.22 $31.52 $12.70 Apr 25, 2026
CONSTRUCTION EQUIPMENT OPERATORS GROUP 2Highway ConstructionStatewide$46.71 $34.01 $12.70 Apr 25, 2026
CONSTRUCTION EQUIPMENT OPERATORS GROUP 3Highway ConstructionStatewide$47.36 $34.66 $12.70 Apr 25, 2026
CONSTRUCTION EQUIPMENT OPERATORS GROUP 4Highway ConstructionStatewide$48.30 $35.60 $12.70 Apr 25, 2026
CONSTRUCTION EQUIPMENT OPERATORS GROUP 5Highway ConstructionStatewide$49.64 $36.94 $12.70 Apr 25, 2026
CONSTRUCTION EQUIPMENT OPERATORS GROUP 6Highway ConstructionStatewide$50.83 $38.13 $12.70 Apr 25, 2026
CONSTRUCTION EQUIPMENT OPERATORS GROUP 7Highway ConstructionStatewide$53.43 $40.73 $12.70 Apr 25, 2026

How Fergus County compares

The main operating engineer rate in every county that has one, and how the pay splits here and nearby. All bars use the same scale.

Every county in Montana

$46.38Flathead$49.13Beaverhead
FergusNearby: Petroleum $49.13, Judith Basin $49.13, Musselshell $47.29Each column is a group of counties with about the same main rate; its height is how many. 0 counties pay more than Fergus, 27 the same, 28 less.

Wage and benefits, nearby

  1. Fergus Countybase $32.34$49.13
  2. Petroleum Countybase $32.34$49.13
  3. Judith Basin Countybase $32.34$49.13
  4. Musselshell Countybase $30.50$47.29

Operating Engineer rates in nearby counties

Current DLI rates. Building rates apply "to the district in which the work is being performed"; heavy and highway rates are statewide (MCA 18-2-403).

DLI's operating engineer rates for Fergus County are the same as in 13 other counties: Blaine, Cascade, Chouteau, Gallatin, Golden Valley, Hill, Judith Basin, Meagher and 5 more.

CountyClassificationBase + benefitBasevs Fergus County
Fergus CountyCONSTRUCTION EQUIPMENT OPERATORS GROUP 1$49.13 $32.34 
Petroleum CountyCONSTRUCTION EQUIPMENT OPERATORS GROUP 1$49.13 $32.34 same
Judith Basin CountyCONSTRUCTION EQUIPMENT OPERATORS GROUP 1$49.13 $32.34 same
Golden Valley CountyCONSTRUCTION EQUIPMENT OPERATORS GROUP 1$49.13 $32.34 same
Wheatland CountyCONSTRUCTION EQUIPMENT OPERATORS GROUP 1$49.13 $32.34 same
Chouteau CountyCONSTRUCTION EQUIPMENT OPERATORS GROUP 1$49.13 $32.34 same
Musselshell CountyCONSTRUCTION EQUIPMENT OPERATORS GROUP 1$47.29 $30.50 −$1.84

Montana operating engineer prevailing wage by county, with a map

More from DLI on this rate

All Fergus County prevailing wage rates

Are you being paid this rate?

Add your base wage to what your employer pays into benefit plans for you (or in cash), and compare it with the total. Contractors post the wages and benefits on site from day one and keep payroll records 3 years (MCA 18-2-422). DLI: (406) 444-6543.

Source

Department of Labor & Industry (DLI), DLI 2026 schedule MTDLI-BLD-2026-04-25, effective April 25, 2026, page 8: erd.dli.mt.gov/_docs/labor-standards/Prevailing-Wage/2026-Building-Construction.pdf

We read every row of DLI's 2026 Building, Heavy and Highway PDFs and check every number with a second, separate reader. DLI prints no total; ours is base plus benefit. How we check · Download Fergus County as CSV · Report an error