Operating Engineer prevailing wage in Ponce Municipio, Puerto Rico

$7.25an hour, base + fringe ·

$7.25 wage + $0.00 fringe benefits · Building · SUPR1993-001

On federally funded or assisted building construction in Ponce Municipio, an operating engineer working as must be paid at least $7.25 an hour: a $7.25 base wage plus $0.00 in fringe benefits, under wage determination PR20260001 (modification 1). DOL prints no total, so $7.25 is our sum of the two.

Wage determination PR20260001, modification 1, published May 18, 2026, for building construction; rate identifier SUPR1993-001 (October 29, 1993). Checked against sam.gov on October 25, 2026.

These are the federal Davis-Bacon rates for Puerto Rico, for federally funded or assisted construction. We haven't checked whether Puerto Rico also sets its own.

DOL lists 14 operating engineer rates for Ponce Municipio, from $7.25 to $13.78 an hour. See all of them.

Base wage and fringe benefits: $7.25 + $0.00

The base wage is the taxable hourly wage. DOL prints the fringe benefits as one hourly figure, not itemized; it can go to health, pension, vacation and training plans, or be paid as cash where the state allows.

Base wage (taxable)$7.25
Base + fringe benefits (our sum; DOL prints no total)$7.25

When this rate changes

Every operating engineer rate in Ponce Municipio

As DOL lists them. The highlighted row is the one this page leads with.

  1. OPERATOR: GRADER/BLADEHighway · SUPR2019-037$13.78
  2. OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)Highway · SUPR2019-037$13.56
  3. OPERATOR: CRANEHighway · SUPR2019-037$13.02
  4. OPERATOR: BACKHOE/EXCAVATOR/TRACKHOEResidential · SUPR2019-022$12.55
  5. OPERATOR: ROLLERHighway · SUPR2019-037$12.45
  6. OPERATOR: BACKHOE/EXCAVATOR/TRACKHOEHeavy · SUPR2019-002$12.31
  7. OPERATOR: BULLDOZERHighway · SUPR2019-037$11.72
  8. OPERATOR: MECHANICHighway · SUPR2019-037$11.13
  9. OPERATOR: BACKHOE/EXCAVATOR/TRACKHOEHighway · SUPR2019-037$11.09
  10. OPERATOR: BOBCAT/SKID STEER/SKID LOADERHighway · SUPR2019-037$10.03
  11. POWER EQUIPMENT OPERATORS: (LOADERS)Building · SUPR1993-001$7.51
  12. POWER EQUIPMENT OPERATORS: (TRAXCAVATOR)Building · SUPR1993-001$7.25
  13. POWER EQUIPMENT OPERATORS: (DIGGERS)Building · SUPR1993-001$7.25
  14. POWER EQUIPMENT OPERATORS: (CRANES)Building · SUPR1993-001$7.25
Hourly rate of each operating engineer classification in Ponce Municipio, highest first, split into wage and fringe benefits.
ClassificationBase + fringeBaseFringe benefitsWD
POWER EQUIPMENT OPERATORS: (TRAXCAVATOR)BuildingSUPR1993-001$7.25 $7.25 $0.00 PR20260001 Mod 1
POWER EQUIPMENT OPERATORS: (LOADERS)BuildingSUPR1993-001$7.51 $7.25 $0.26 PR20260001 Mod 1
POWER EQUIPMENT OPERATORS: (DIGGERS)BuildingSUPR1993-001$7.25 $7.25 $0.00 PR20260001 Mod 1
POWER EQUIPMENT OPERATORS: (CRANES)BuildingSUPR1993-001$7.25 $7.25 $0.00 PR20260001 Mod 1
OPERATOR: ROLLERHighwaySUPR2019-037$12.45 $9.31 $3.14 PR20260025 Mod 1
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)HighwaySUPR2019-037$13.56 $10.41 $3.15 PR20260025 Mod 1
OPERATOR: MECHANICHighwaySUPR2019-037$11.13 $10.19 $0.94 PR20260025 Mod 1
OPERATOR: GRADER/BLADEHighwaySUPR2019-037$13.78 $12.53 $1.25 PR20260025 Mod 1
OPERATOR: CRANEHighwaySUPR2019-037$13.02 $12.11 $0.91 PR20260025 Mod 1
OPERATOR: BULLDOZERHighwaySUPR2019-037$11.72 $10.82 $0.90 PR20260025 Mod 1
OPERATOR: BOBCAT/SKID STEER/SKID LOADERHighwaySUPR2019-037$10.03 $9.38 $0.65 PR20260025 Mod 1
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOEHighwaySUPR2019-037$11.09 $10.34 $0.75 PR20260025 Mod 1
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOEHeavySUPR2019-002$12.31 $11.44 $0.87 PR20260036 Mod 1
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOEResidentialSUPR2019-022$12.55 $12.00 $0.55 PR20260026 Mod 1

How Ponce Municipio compares

The main operating engineer rate in every municipio that has one, and how the pay splits here and nearby. All bars use the same scale.

Every municipio in Puerto Rico

Wage and fringe benefits, nearby

  1. Ponce Municipiobase $7.25$7.25
  2. Peñuelas Municipiobase $7.25$7.25
  3. Juana Díaz Municipiobase $7.25$7.25
  4. Villalba Municipiobase $7.25$7.25

Operating Engineer rates in nearby localities

Current DOL rates. Davis-Bacon rates are set for groups of municipios, so neighbours often share them; the municipio where the work is done decides.

MunicipioClassificationBase + fringeBasevs Ponce Municipio
Ponce MunicipioPOWER EQUIPMENT OPERATORS: (DIGGERS)$7.25 $7.25 
Peñuelas MunicipioPOWER EQUIPMENT OPERATORS: (DIGGERS)$7.25 $7.25 same
Juana Díaz MunicipioPOWER EQUIPMENT OPERATORS: (DIGGERS)$7.25 $7.25 same
Villalba MunicipioPOWER EQUIPMENT OPERATORS: (DIGGERS)$7.25 $7.25 same
Jayuya MunicipioPOWER EQUIPMENT OPERATORS: (DIGGERS)$7.25 $7.25 same
Guayanilla MunicipioPOWER EQUIPMENT OPERATORS: (DIGGERS)$7.25 $7.25 same
Adjuntas MunicipioPOWER EQUIPMENT OPERATORS: (DIGGERS)$7.25 $7.25 same

Puerto Rico operating engineer prevailing wage by municipio, with a map

More from DOL on this rate

All Ponce Municipio prevailing wage rates

Are you being paid this rate?

Add your base pay to the fringe your employer pays for you, in cash or into plans, and compare the sum with the total. The Department of Labor's Wage and Hour Division takes complaints: 1-866-487-9243, or dol.gov/agencies/whd/contact/complaints.

Source

U.S. Department of Labor, Wage and Hour Division (DOL), wage determination PR20260001 Mod 1, published May 18, 2026: sam.gov/wage-determination/PR20260001/1

We read every active Puerto Rico Davis-Bacon wage determination from SAM.gov's own data and check every number with a second, independent read of the same file. DOL prints no total; ours is base plus fringe. How we check · Download Ponce Municipio as CSV · Report an error