Operating Engineer prevailing wage in Providence County, Rhode Island

$80.52an hour, base wage + fringe benefits (our sum)

$50.57 base wage + $29.95 fringe benefits · Building, Heavy & Highway · ENGI0057-003

Providence County uses the same operating engineer rates as 3 other counties. See all of them on one page.

On Rhode Island public works in Providence County, an operating engineer must be paid at least $80.52 an hour: a $50.57 base wage plus $29.95 in fringe benefits. DLT prints no total, so $80.52 is our sum of the two.

Davis-Bacon RI20260001 Mod 5 (Oct 1, 2026) and related decisions; this rate, effective October 1, 2026. Rates are set at award, then adjusted every July 1 for the life of the contract (RIGL 37-13-8). Checked against dlt.ri.gov on October 25, 2026.

DLT lists 28 operating engineer rates for Providence County, from $29.25 to $81.25 an hour. See all of them.

Base wage and fringe benefits: $50.57 + $29.95

The base wage is the taxable hourly wage. DLT prints the fringe benefits as one hourly figure, not itemized; it can go to health, pension, vacation and training plans, or be paid as cash where the state allows.

Base wage (taxable)$50.57
Fringe benefits (one figure, not itemized)$29.95
Base + fringe benefits (our sum; DLT prints no total)$80.52

When does this rate change?

Every operating engineer rate in Providence County

As DLT lists them. The highlighted row is the one this page leads with.

ClassificationBase wageFringe benefitsTotal rateEffective
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 1: CRANES, LIGHTERS, BOOM TRUCKS AND DERRICKS. (BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00; 180 FEET AND OVER + $ 3.00; 210 FEET AND OVER + $ 4.00; 240 FEET AND OVER + $ 5.00; 270 FEET AND OVER + $ 7.00; 300 FEET AND OVER + $ 8.00; 350 FEET AND OVER + $ 9.00; 400 FEET AND OVER + $10.00); (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.)Building, Heavy & HighwayENGI0057-001$51.30 $29.95 $81.25 Oct 1, 2026
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 2: DIGGING MACHINE, ROSS CARRIER, LOCOMOTIVE, HOIST, ELEVATOR, BIDWELL-TYPE MACHINE, SHOT & WATER BLASTING MACHINE, PAVER, SPREADER, GRADERS, FRONT END LOADER (3 YDS. AND OVER), VIBRATORY HAMMER & VACUUM TRUCK, ROADHEADERS, FORKLIFTS, ECONOMOBILE TYPE EQUIPMENT, TUNNEL BORING MACHINES, CONCRETE PUMP AND ON SITE CONCRETE PLANTS. (BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00; 180 FEET AND OVER + $ 3.00; 210 FEET AND OVER + $ 4.00; 240 FEET AND OVER + $ 5.00; 270 FEET AND OVER + $ 7.00; 300 FEET AND OVER + $ 8.00; 350 FEET AND OVER + $ 9.00; 400 FEET AND OVER + $10.00); (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.)Building, Heavy & HighwayENGI0057-001$49.30 $29.95 $79.25 Oct 1, 2026
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 3: OILERS ON CRANES. (BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00; 180 FEET AND OVER + $ 3.00; 210 FEET AND OVER + $ 4.00; 240 FEET AND OVER + $ 5.00; 270 FEET AND OVER + $ 7.00; 300 FEET AND OVER + $ 8.00; 350 FEET AND OVER + $ 9.00; 400 FEET AND OVER + $10.00); (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.)Building, Heavy & HighwayENGI0057-001$44.92 $29.95 $74.87 Oct 1, 2026
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 4: OILER ON CRAWLER BACKHOE. (BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00; 180 FEET AND OVER + $ 3.00; 210 FEET AND OVER + $ 4.00; 240 FEET AND OVER + $ 5.00; 270 FEET AND OVER + $ 7.00; 300 FEET AND OVER + $ 8.00; 350 FEET AND OVER + $ 9.00; 400 FEET AND OVER + $10.00); (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.)Building, Heavy & HighwayENGI0057-001$42.07 $29.95 $72.02 Oct 1, 2026
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 5: BULLDOZER, BOBCATS, SKID STEER LOADER, TRACTOR, SCRAPER, COMBINATION LOADER BACKHOE, ROLLER, FRONT END LOADER (LESS THAN 3 YDS.), STREET AND MOBILE-POWERED SWEEPER (3-YD. CAPACITY), 8-FT. SWEEPER MINIMUM 65 HP). (BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $2.00; 180 FEET AND OVER + $ 3.00; 210 FEET AND OVER + $ 4.00; 240 FEET AND OVER + $ 5.00; 270 FEET AND OVER + $ 7.00; 300 FEET AND OVER + $ 8.00; 350 FEET AND OVER + $ 9.00; 400 FEET AND OVER + $10.00); (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.)Building, Heavy & HighwayENGI0057-001$48.35 $29.95 $78.30 Oct 1, 2026
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 6: WELL-POINT INSTALLATION CREW. (BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00; 180 FEET AND OVER + $ 3.00; 210 FEET AND OVER + $ 4.00; 240 FEET AND OVER + $ 5.00; 270 FEET AND OVER + $ 7.00; 300 FEET AND OVER + $ 8.00; 350 FEET AND OVER + $ 9.00; 400 FEET AND OVER + $10.00); (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.)Building, Heavy & HighwayENGI0057-001$39.15 $29.95 $69.10 Oct 1, 2026
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 7: UTILITY ENGINEERS AND SIGNAL PERSONS. (BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00; 180 FEET AND OVER + $ 3.00; 210 FEET AND OVER + $ 4.00; 240 FEET AND OVER + $ 5.00; 270 FEET AND OVER + $ 7.00; 300 FEET AND OVER + $ 8.00; 350 FEET AND OVER + $ 9.00; 400 FEET AND OVER + $10.00); (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.)Building, Heavy & HighwayENGI0057-001$33.15 $29.95 $63.10 Oct 1, 2026
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 8: HEATER, CONCRETE MIXER, STONE CRUSHER, WELDING MACHINE, GENERATOR AND LIGHT PLANT, GAS AND ELECTRIC DRIVEN PUMP AND AIR COMPRESSOR. (BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00; 180 FEET AND OVER + $ 3.00; 210 FEET AND OVER + $ 4.00; 240 FEET AND OVER + $ 5.00; 270 FEET AND OVER + $ 7.00; 300 FEET AND OVER + $ 8.00; 350 FEET AND OVER + $ 9.00; 400 FEET AND OVER + $10.00); (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.)Building, Heavy & HighwayENGI0057-001$45.00 $29.95 $74.95 Oct 1, 2026
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 9: BOAT & TUG OPERATOR. (BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00; 180 FEET AND OVER + $ 3.00; 210 FEET AND OVER + $ 4.00; 240 FEET AND OVER + $ 5.00; 270 FEET AND OVER + $ 7.00; 300 FEET AND OVER + $ 8.00; 350 FEET AND OVER + $ 9.00; 400 FEET AND OVER + $10.00); (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.)Building, Heavy & HighwayENGI0057-001$48.92 $29.95 $78.87 Oct 1, 2026
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 1: CRANES, LIGHTERS, BOOM TRUCKS AND DERRICKS. (BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180 FT. AND OVER: + $ 3.00; 210 FT. AND OVER: + $ 4.00; 240 FT. AND OVER: + $ 5.00; 270 FT. AND OVER: + $ 7.00; 300 FT. AND OVER: + $ 8.00; 350 FT. AND OVER: + $ 9.00; 400 FT. AND OVER: + $10.00) (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.)Building, Heavy & HighwayENGI0057-003$50.57 $29.95 $80.52 Oct 1, 2026
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 2: DIGGING MACHINE, ROSS CARRIER, LOCOMOTIVE, HOIST, ELEVATOR, BIDWELL-TYPE MACHINE, SHOT & WATER BLASTING MACHINE, PAVER, SPREADER, FRONT END LOADER (3 YDS. AND OVER), VIBRATORY HAMMER AND VACUUM TRUCK. (BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180 FT. AND OVER: + $ 3.00; 210 FT. AND OVER: + $ 4.00; 240 FT. AND OVER: + $ 5.00; 270 FT. AND OVER: + $ 7.00; 300 FT. AND OVER: + $ 8.00; 350 FT. AND OVER: + $ 9.00; 400 FT. AND OVER: + $10.00) (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.)Building, Heavy & HighwayENGI0057-003$48.57 $29.95 $78.52 Oct 1, 2026
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 3: TELEHANDLER EQUIPMENT, FORKLIFT, CONCRETE PUMP & ON-SITE CONCRETE PLANT. (BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180 FT. AND OVER: + $ 3.00; 210 FT. AND OVER: + $ 4.00; 240 FT. AND OVER: + $ 5.00; 270 FT. AND OVER: + $ 7.00; 300 FT. AND OVER: + $ 8.00; 350 FT. AND OVER: + $ 9.00; 400 FT. AND OVER: + $10.00) (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.)Building, Heavy & HighwayENGI0057-003$48.35 $29.95 $78.30 Oct 1, 2026
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 4: FIREMAN & OILER ON CRANES. (BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180 FT. AND OVER: + $ 3.00; 210 FT. AND OVER: + $ 4.00; 240 FT. AND OVER: + $ 5.00; 270 FT. AND OVER: + $ 7.00; 300 FT. AND OVER: + $ 8.00; 350 FT. AND OVER: + $ 9.00; 400 FT. AND OVER: + $10.00) (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.)Building, Heavy & HighwayENGI0057-003$44.35 $29.95 $74.30 Oct 1, 2026
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 5: OILER ON CRAWLER BACKHOE. (BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180 FT. AND OVER: + $ 3.00; 210 FT. AND OVER: + $ 4.00; 240 FT. AND OVER: + $ 5.00; 270 FT. AND OVER: + $ 7.00; 300 FT. AND OVER: + $ 8.00; 350 FT. AND OVER: + $ 9.00; 400 FT. AND OVER: + $10.00) (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.)Building, Heavy & HighwayENGI0057-003$41.50 $29.95 $71.45 Oct 1, 2026
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 6: BULLDOZER,SKID STEER LOADERS,BOBCATS, TRACTOR, GRADER, SCRAPER,COMBINATION LOADER BACKHOE, ROLLER, FRONT END LOADER (LESS THAN 3 YDS.), STREET AND MOBILE POWERED SWEEPER (3 YDS. CAPACITY), 8-FT. SWEEPER (MINIMUM 65 HP). (BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180 FT. AND OVER: + $ 3.00; 210 FT. AND OVER: + $ 4.00; 240 FT. AND OVER: + $ 5.00; 270 FT. AND OVER: + $ 7.00; 300 FT. AND OVER: + $ 8.00; 350 FT. AND OVER: + $ 9.00; 400 FT. AND OVER: + $10.00) (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.)Building, Heavy & HighwayENGI0057-003$47.65 $29.95 $77.60 Oct 1, 2026
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 7: WELL POINT INSTALLATION CREW. (BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180 FT. AND OVER: + $ 3.00; 210 FT. AND OVER: + $ 4.00; 240 FT. AND OVER: + $ 5.00; 270 FT. AND OVER: + $ 7.00; 300 FT. AND OVER: + $ 8.00; 350 FT. AND OVER: + $ 9.00; 400 FT. AND OVER: + $10.00) (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.)Building, Heavy & HighwayENGI0057-003$47.22 $29.95 $77.17 Oct 1, 2026
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 8: HEATER, CONCRETE MIXER, STONE CRUSHER, WELDING MACHINE, GENERATOR FOR LIGHT PLANT, GAS AND ELECTRIC DRIVEN PUMP & AIR COMPRESSOR. (BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180 FT. AND OVER: + $ 3.00; 210 FT. AND OVER: + $ 4.00; 240 FT. AND OVER: + $ 5.00; 270 FT. AND OVER: + $ 7.00; 300 FT. AND OVER: + $ 8.00; 350 FT. AND OVER: + $ 9.00; 400 FT. AND OVER: + $10.00) (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.)Building, Heavy & HighwayENGI0057-003$44.54 $29.95 $74.49 Oct 1, 2026
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 1: CRANES, PILE DRIVERS, LIGHTERS, BOOM TRUCKS, HOISTS, DERRICKS. (ANY EMPLOYEE WHO WORKS THREE DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY.)Building, Heavy & HighwayENGI0057-005$46.45 $29.95 $76.40 Oct 1, 2026
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 2: DIGGING MACHINES, EXCAVATORS, LOCOMOTIVES, JOHN HENRY'S, DIRECTIONAL DRILLING MACHINES, COLD PLANERS, RECLAIMERS, PAVERS, SPREADERS, GRADERS, FRONT-END LOADERS (3YDS & OVER), VACUUM TRUCK, DRILL/BORING MACHINE OPERATORS, VERMEER SAW, WATER BLASTER, HYDRAULIC-DEMOLITION ROBOT, ROSS CARRIERS, CONCRETE PUMP OPERATORS, ASPHALT/MATERIAL TRANSFER MACHINES, ROTATING TELEHANDLERS, SPMT TYPE EQUIPMENT. (ANY EMPLOYEE WHO WORKS THREE DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY.) DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAYBuilding, Heavy & HighwayENGI0057-005$44.45 $29.95 $74.40 Oct 1, 2026
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 3: WELLPOINT INSTALLATION AND DRILL/BORING MACHINE ASSISTANTS. (ANY EMPLOYEE WHO WORKS THREE DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY.)Building, Heavy & HighwayENGI0057-005$39.15 $29.95 $69.10 Oct 1, 2026
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 4: UTILITY ENGINEERS. (ANY EMPLOYEE WHO WORKS THREE DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY.)Building, Heavy & HighwayENGI0057-005$25.75 $29.95 $55.70 Oct 1, 2026
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 5: SIGNAL PERSONS. (ANY EMPLOYEE WHO WORKS THREE DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY.)Building, Heavy & HighwayENGI0057-005$33.15 $29.95 $63.10 Oct 1, 2026
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 6: OILERS ON CRANES AND DECKHANDS. (ANY EMPLOYEE WHO WORKS THREE DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY.)Building, Heavy & HighwayENGI0057-005$39.73 $29.95 $69.68 Oct 1, 2026
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 7: COMBINATION LOADER / BACKHOES, FRONT-END LOADERS (LESS THAN 3 YDS.), FORKLIFT, BULLDOZERS, SCRAPERS, BOATS, ROLLERS, SKID STEER LOADERS (REGARDLESS OF ATTACHMENTS), STREET SWEEPERS, MECHANICS, WELDERS, OPERATORS IN MATERIALS YARDS, SHOPS AND GARAGES. (ANY EMPLOYEE WHO WORKS THREE DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY.)Building, Heavy & HighwayENGI0057-005$43.43 $29.95 $73.38 Oct 1, 2026
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 8: GAS AND ELECTRIC DRIVE HEATERS, CONCRETE MIXERS, LIGHT PLANTS, WELDING MACHINES, PUMPS AND COMPRESSORS. (ANY EMPLOYEE WHO WORKS THREE DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY.)Building, Heavy & HighwayENGI0057-005$38.70 $29.95 $68.65 Oct 1, 2026
POWER EQUIPMENT OPERATOR: PAVER A. FOOTNOTES: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONALResidential (single-family homes and apartments up to 4 stories)ResidentialENGI0057-004$40.82 $28.25 $69.07 May 18, 2026
POWER EQUIPMENT OPERATOR: GRADER AND ROLLER A. FOOTNOTES: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONALResidential (single-family homes and apartments up to 4 stories)ResidentialENGI0057-004$39.90 $28.25 $68.15 May 18, 2026
POWER EQUIPMENT OPERATOR (BACKHOE)Residential (single-family homes and apartments up to 4 stories)ResidentialSURI1999-002$20.27 $8.98 $29.25 May 18, 2026

How Providence County compares

The main operating engineer rate in every county that has one, and how the pay splits here and nearby. All bars use the same scale.

Every county in Rhode Island

Wage and fringe benefits, nearby

  1. Providence Countybase $50.57$80.52
  2. Kent Countybase $50.57$80.52
  3. Bristol Countybase $50.57$80.52
  4. Washington Countybase $50.57$80.52

Operating Engineer rates in nearby counties

Current DLT rates. Rhode Island adopts the federal decisions, which are statewide; only the residential decision differs by county.

DLT's operating engineer rates for Providence County are the same as in 3 other counties: Bristol, Kent, Washington.

CountyClassificationBase wageTotal ratevs Providence County
Providence CountyPOWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 1: CRANES, LIGHTERS, BOOM TRUCKS AND DERRICKS. (BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180 FT. AND OVER: + $ 3.00; 210 FT. AND OVER: + $ 4.00; 240 FT. AND OVER: + $ 5.00; 270 FT. AND OVER: + $ 7.00; 300 FT. AND OVER: + $ 8.00; 350 FT. AND OVER: + $ 9.00; 400 FT. AND OVER: + $10.00) (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.)$50.57 $80.52 
Kent CountyPOWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 1: CRANES, LIGHTERS, BOOM TRUCKS AND DERRICKS. (BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180 FT. AND OVER: + $ 3.00; 210 FT. AND OVER: + $ 4.00; 240 FT. AND OVER: + $ 5.00; 270 FT. AND OVER: + $ 7.00; 300 FT. AND OVER: + $ 8.00; 350 FT. AND OVER: + $ 9.00; 400 FT. AND OVER: + $10.00) (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.)$50.57 $80.52 same
Bristol CountyPOWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 1: CRANES, LIGHTERS, BOOM TRUCKS AND DERRICKS. (BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180 FT. AND OVER: + $ 3.00; 210 FT. AND OVER: + $ 4.00; 240 FT. AND OVER: + $ 5.00; 270 FT. AND OVER: + $ 7.00; 300 FT. AND OVER: + $ 8.00; 350 FT. AND OVER: + $ 9.00; 400 FT. AND OVER: + $10.00) (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.)$50.57 $80.52 same
Washington CountyPOWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 1: CRANES, LIGHTERS, BOOM TRUCKS AND DERRICKS. (BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180 FT. AND OVER: + $ 3.00; 210 FT. AND OVER: + $ 4.00; 240 FT. AND OVER: + $ 5.00; 270 FT. AND OVER: + $ 7.00; 300 FT. AND OVER: + $ 8.00; 350 FT. AND OVER: + $ 9.00; 400 FT. AND OVER: + $10.00) (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.)$50.57 $80.52 same
Newport CountyPOWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 1: CRANES, LIGHTERS, BOOM TRUCKS AND DERRICKS. (BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180 FT. AND OVER: + $ 3.00; 210 FT. AND OVER: + $ 4.00; 240 FT. AND OVER: + $ 5.00; 270 FT. AND OVER: + $ 7.00; 300 FT. AND OVER: + $ 8.00; 350 FT. AND OVER: + $ 9.00; 400 FT. AND OVER: + $10.00) (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.)$50.57 $80.52 same

Rhode Island operating engineer prevailing wage by county, with a map

More from DLT on this rate

All Providence County prevailing wage rates

Are you being paid this rate?

Add your base wage to the fringe your employer pays for you, and compare it with the total. Healthcare and retirement must be actually bought, not paid as cash (RIGL 37-13-7). DLT Prevailing Wage: (401) 462-8580, option 7.

Source

Department of Labor and Training (DLT), SAM.gov wage determination RI20260001 Mod 5, issued October 1, 2026, effective October 1, 2026: sam.gov/wage-determination/RI20260001/5

We read every active Rhode Island Davis-Bacon decision from SAM.gov's API and DLT's retirement schedule, and check every number with a second read. Davis-Bacon prints no total; ours is base plus fringe. How we check · Download Providence County as CSV · Report an error