Wisconsin · Operating Engineer
Wisconsin operating engineer prevailing wage, county by county
An operating engineer's Davis-Bacon prevailing wage in Wisconsin runs from $27.97 an hour in Wood County to $83.76 in Kenosha County. The median county is $27.97.
Main operating engineer classification in each county, Davis-Bacon wage determinations on SAM.gov, as of October 25, 2026. A contract keeps the wage determination in its bid documents. Modifications published before bid opening apply to it, though one published less than 10 days before can be left out if the agency finds there isn't time to tell bidders (29 CFR 1.6(c)). Checked October 25, 2026.
How much does an operating engineer make on prevailing wage in Wisconsin?
6 groups of counties with identical rates and 15 with rates of their own, highest main rate first. The table below lists which counties are in each group.
- Washington County group2 counties$83.76
- Kenosha County1 county$83.76
- Milwaukee County1 county$83.76
- Racine County1 county$83.76
- Waukesha County1 county$83.76
- Outagamie County group2 counties$78.42
- St. Croix County group2 counties$78.42
- Brown County1 county$78.42
- Chippewa County1 county$78.42
- Dane County1 county$78.42
- Douglas County1 county$78.42
- Eau Claire County1 county$78.42
- La Crosse County1 county$78.42
- Marathon County1 county$78.42
- Rock County1 county$78.42
- Sheboygan County1 county$78.42
- Winnebago County1 county$78.42
- Walworth County group47 counties$27.97
- Columbia County group2 counties$27.97
- Oconto County group2 counties$27.97
- Fond du Lac County1 county$27.97
Which counties pay which rate
| Counties | Main classification | Base + fringe | Base |
|---|---|---|---|
| Washington County group, 2 localities: Ozaukee, Washington | POWER EQUIPMENT OPERATOR: GROUP 1 CRANES, TOWER CRANES, PEDESTAL TOWER CRANES AND DERRICKS WITH OR W/O ATTACHMENTS WITH A LIFTING CAPACITY OF OVER 100 TONS; OR CRANES, TOWER CRANES, PEDESTAL TOWER CRANES AND DERRICKS WITH BOOM, LEADS, AND/OR JIB LENGTHS MEASURING 176 FEET OR LONGER; SELF-ERECTING TOWER CRANES OVER 4000 LBS LIFTING CAPACITY; ALL CRANES WITH BOOM DOLLIES; BORING MACHINES (DIRECTIONAL); MASTER MECHANIC. $0.50 ADDITIONAL PER HOUR PER 100 TONS OR 100 FT OF BOOM OVER 200 FT OR LIFTING CAPACITY OF CRANE OVER 200 TONS TO A MAXIMUM OF 300 TONS OR 300 FT. THEREAFTER AN INCREASE OF $0.01 PER FT OR TON, WHICHEVER IS GREATER. (KENOSHA, MILWAUKEE, OZAUKEE, RACINE, WASHINGTON, AND WAUKESHA COUNTIES) HAZARDOUS WASTE PREMIUMS: EPA LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR | $83.76 | $55.21 |
| Kenosha County | POWER EQUIPMENT OPERATOR: GROUP 1 CRANES, TOWER CRANES, PEDESTAL TOWER CRANES AND DERRICKS WITH OR W/O ATTACHMENTS WITH A LIFTING CAPACITY OF OVER 100 TONS; OR CRANES, TOWER CRANES, PEDESTAL TOWER CRANES AND DERRICKS WITH BOOM, LEADS, AND/OR JIB LENGTHS MEASURING 176 FEET OR LONGER; SELF-ERECTING TOWER CRANES OVER 4000 LBS LIFTING CAPACITY; ALL CRANES WITH BOOM DOLLIES; BORING MACHINES (DIRECTIONAL); MASTER MECHANIC. $0.50 ADDITIONAL PER HOUR PER 100 TONS OR 100 FT OF BOOM OVER 200 FT OR LIFTING CAPACITY OF CRANE OVER 200 TONS TO A MAXIMUM OF 300 TONS OR 300 FT. THEREAFTER AN INCREASE OF $0.01 PER FT OR TON, WHICHEVER IS GREATER. (KENOSHA, MILWAUKEE, OZAUKEE, RACINE, WASHINGTON, AND WAUKESHA COUNTIES) HAZARDOUS WASTE PREMIUMS: EPA LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR | $83.76 | $55.21 |
| Milwaukee County | POWER EQUIPMENT OPERATOR: GROUP 1 CRANES, TOWER CRANES, PEDESTAL TOWER CRANES AND DERRICKS WITH OR W/O ATTACHMENTS WITH A LIFTING CAPACITY OF OVER 100 TONS; OR CRANES, TOWER CRANES, PEDESTAL TOWER CRANES AND DERRICKS WITH BOOM, LEADS, AND/OR JIB LENGTHS MEASURING 176 FEET OR LONGER; SELF-ERECTING TOWER CRANES OVER 4000 LBS LIFTING CAPACITY; ALL CRANES WITH BOOM DOLLIES; BORING MACHINES (DIRECTIONAL); MASTER MECHANIC. $0.50 ADDITIONAL PER HOUR PER 100 TONS OR 100 FT OF BOOM OVER 200 FT OR LIFTING CAPACITY OF CRANE OVER 200 TONS TO A MAXIMUM OF 300 TONS OR 300 FT. THEREAFTER AN INCREASE OF $0.01 PER FT OR TON, WHICHEVER IS GREATER. (KENOSHA, MILWAUKEE, OZAUKEE, RACINE, WASHINGTON, AND WAUKESHA COUNTIES) HAZARDOUS WASTE PREMIUMS: EPA LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR | $83.76 | $55.21 |
| Racine County | POWER EQUIPMENT OPERATOR: GROUP 1 CRANES, TOWER CRANES, PEDESTAL TOWER CRANES AND DERRICKS WITH OR W/O ATTACHMENTS WITH A LIFTING CAPACITY OF OVER 100 TONS; OR CRANES, TOWER CRANES, PEDESTAL TOWER CRANES AND DERRICKS WITH BOOM, LEADS, AND/OR JIB LENGTHS MEASURING 176 FEET OR LONGER; SELF-ERECTING TOWER CRANES OVER 4000 LBS LIFTING CAPACITY; ALL CRANES WITH BOOM DOLLIES; BORING MACHINES (DIRECTIONAL); MASTER MECHANIC. $0.50 ADDITIONAL PER HOUR PER 100 TONS OR 100 FT OF BOOM OVER 200 FT OR LIFTING CAPACITY OF CRANE OVER 200 TONS TO A MAXIMUM OF 300 TONS OR 300 FT. THEREAFTER AN INCREASE OF $0.01 PER FT OR TON, WHICHEVER IS GREATER. (KENOSHA, MILWAUKEE, OZAUKEE, RACINE, WASHINGTON, AND WAUKESHA COUNTIES) HAZARDOUS WASTE PREMIUMS: EPA LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR | $83.76 | $55.21 |
| Waukesha County | POWER EQUIPMENT OPERATOR: GROUP 1 CRANES, TOWER CRANES, PEDESTAL TOWER CRANES AND DERRICKS WITH OR W/O ATTACHMENTS WITH A LIFTING CAPACITY OF OVER 100 TONS; OR CRANES, TOWER CRANES, PEDESTAL TOWER CRANES AND DERRICKS WITH BOOM, LEADS, AND/OR JIB LENGTHS MEASURING 176 FEET OR LONGER; SELF-ERECTING TOWER CRANES OVER 4000 LBS LIFTING CAPACITY; ALL CRANES WITH BOOM DOLLIES; BORING MACHINES (DIRECTIONAL); MASTER MECHANIC. $0.50 ADDITIONAL PER HOUR PER 100 TONS OR 100 FT OF BOOM OVER 200 FT OR LIFTING CAPACITY OF CRANE OVER 200 TONS TO A MAXIMUM OF 300 TONS OR 300 FT. THEREAFTER AN INCREASE OF $0.01 PER FT OR TON, WHICHEVER IS GREATER. (KENOSHA, MILWAUKEE, OZAUKEE, RACINE, WASHINGTON, AND WAUKESHA COUNTIES) HAZARDOUS WASTE PREMIUMS: EPA LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR | $83.76 | $55.21 |
| Outagamie County group, 2 localities: Calumet, Outagamie | POWER EQUIPMENT OPERATOR: GROUP 1 CRANES, TOWER CRANES AND DERRICKS WITH OR WITHOUT ATTACHMENTS WITH A LIFTING CAPACITY OF OVER 100 TONS; CRANES, TOWER CRANES, AND DERRICKS WITH BOOM, LEADS AND/OR JIB LENGTHS 176 FT OR LONGER. HAZARDOUS WASTE PREMIUMS: EPA LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR | $78.42 | $50.53 |
| St. Croix County group, 2 localities: Pierce, St. Croix | POWER EQUIPMENT OPERATOR: GROUP 1 CRANES, TOWER CRANES AND DERRICKS WITH OR WITHOUT ATTACHMENTS WITH A LIFTING CAPACITY OF OVER 100 TONS; CRANES, TOWER CRANES, AND DERRICKS WITH BOOM, LEADS AND/OR JIB LENGTHS 176 FT OR LONGER. HAZARDOUS WASTE PREMIUMS: EPA LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR | $78.42 | $50.53 |
| Brown County | POWER EQUIPMENT OPERATOR: GROUP 1 CRANES, TOWER CRANES AND DERRICKS WITH OR WITHOUT ATTACHMENTS WITH A LIFTING CAPACITY OF OVER 100 TONS; CRANES, TOWER CRANES, AND DERRICKS WITH BOOM, LEADS AND/OR JIB LENGTHS 176 FT OR LONGER. HAZARDOUS WASTE PREMIUMS: EPA LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR | $78.42 | $50.53 |
| Chippewa County | POWER EQUIPMENT OPERATOR: GROUP 1 CRANES, TOWER CRANES AND DERRICKS WITH OR WITHOUT ATTACHMENTS WITH A LIFTING CAPACITY OF OVER 100 TONS; CRANES, TOWER CRANES, AND DERRICKS WITH BOOM, LEADS AND/OR JIB LENGTHS 176 FT OR LONGER. HAZARDOUS WASTE PREMIUMS: EPA LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR | $78.42 | $50.53 |
| Dane County | POWER EQUIPMENT OPERATOR: GROUP 1 CRANES, TOWER CRANES AND DERRICKS WITH OR WITHOUT ATTACHMENTS WITH A LIFTING CAPACITY OF OVER 100 TONS; CRANES, TOWER CRANES, AND DERRICKS WITH BOOM, LEADS AND/OR JIB LENGTHS 176 FT OR LONGER. HAZARDOUS WASTE PREMIUMS: EPA LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR | $78.42 | $50.53 |
| Douglas County | POWER EQUIPMENT OPERATOR: GROUP 1 CRANES, TOWER CRANES AND DERRICKS WITH OR WITHOUT ATTACHMENTS WITH A LIFTING CAPACITY OF OVER 100 TONS; CRANES, TOWER CRANES, AND DERRICKS WITH BOOM, LEADS AND/OR JIB LENGTHS 176 FT OR LONGER. HAZARDOUS WASTE PREMIUMS: EPA LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR | $78.42 | $50.53 |
| Eau Claire County | POWER EQUIPMENT OPERATOR: GROUP 1 CRANES, TOWER CRANES AND DERRICKS WITH OR WITHOUT ATTACHMENTS WITH A LIFTING CAPACITY OF OVER 100 TONS; CRANES, TOWER CRANES, AND DERRICKS WITH BOOM, LEADS AND/OR JIB LENGTHS 176 FT OR LONGER. HAZARDOUS WASTE PREMIUMS: EPA LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR | $78.42 | $50.53 |
| La Crosse County | POWER EQUIPMENT OPERATOR: GROUP 1 CRANES, TOWER CRANES AND DERRICKS WITH OR WITHOUT ATTACHMENTS WITH A LIFTING CAPACITY OF OVER 100 TONS; CRANES, TOWER CRANES, AND DERRICKS WITH BOOM, LEADS AND/OR JIB LENGTHS 176 FT OR LONGER. HAZARDOUS WASTE PREMIUMS: EPA LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR | $78.42 | $50.53 |
| Marathon County | POWER EQUIPMENT OPERATOR: GROUP 1 CRANES, TOWER CRANES AND DERRICKS WITH OR WITHOUT ATTACHMENTS WITH A LIFTING CAPACITY OF OVER 100 TONS; CRANES, TOWER CRANES, AND DERRICKS WITH BOOM, LEADS AND/OR JIB LENGTHS 176 FT OR LONGER. HAZARDOUS WASTE PREMIUMS: EPA LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR | $78.42 | $50.53 |
| Rock County | POWER EQUIPMENT OPERATOR: GROUP 1 CRANES, TOWER CRANES AND DERRICKS WITH OR WITHOUT ATTACHMENTS WITH A LIFTING CAPACITY OF OVER 100 TONS; CRANES, TOWER CRANES, AND DERRICKS WITH BOOM, LEADS AND/OR JIB LENGTHS 176 FT OR LONGER. HAZARDOUS WASTE PREMIUMS: EPA LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR | $78.42 | $50.53 |
| Sheboygan County | POWER EQUIPMENT OPERATOR: GROUP 1 CRANES, TOWER CRANES AND DERRICKS WITH OR WITHOUT ATTACHMENTS WITH A LIFTING CAPACITY OF OVER 100 TONS; CRANES, TOWER CRANES, AND DERRICKS WITH BOOM, LEADS AND/OR JIB LENGTHS 176 FT OR LONGER. HAZARDOUS WASTE PREMIUMS: EPA LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR | $78.42 | $50.53 |
| Winnebago County | POWER EQUIPMENT OPERATOR: GROUP 1 CRANES, TOWER CRANES AND DERRICKS WITH OR WITHOUT ATTACHMENTS WITH A LIFTING CAPACITY OF OVER 100 TONS; CRANES, TOWER CRANES, AND DERRICKS WITH BOOM, LEADS AND/OR JIB LENGTHS 176 FT OR LONGER. HAZARDOUS WASTE PREMIUMS: EPA LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR | $78.42 | $50.53 |
| Walworth County group, 47 localities: Adams, Ashland, Barron, Bayfield, Buffalo, Burnett, Clark, Crawford, Dodge, Door, Dunn, Florence, Forest, Grant, Green, Green Lake, Iron, Jackson, Jefferson, Juneau, Lafayette, Langlade, Lincoln, Manitowoc, Marinette, Marquette, Menominee, Monroe, Oneida, Pepin, Polk, Portage, Price, Richland, Rusk, Sauk, Sawyer, Shawano, Taylor, Trempealeau, Vernon, Vilas, Walworth, Washburn, Waupaca, Waushara, Wood | POWER EQUIPMENT OPERATOR (FRONT END LOADER) | $27.97 | $23.36 |
| Columbia County group, 2 localities: Columbia, Iowa | POWER EQUIPMENT OPERATOR (FRONT END LOADER) | $27.97 | $23.36 |
| Oconto County group, 2 localities: Kewaunee, Oconto | POWER EQUIPMENT OPERATOR (FRONT END LOADER) | $27.97 | $23.36 |
| Fond du Lac County | POWER EQUIPMENT OPERATOR (FRONT END LOADER) | $27.97 | $23.36 |
6 groups of counties with identical DOL rates, and 15 counties with rates of their own.
Questions about Wisconsin operating engineer pay
What is the operating engineer prevailing wage in Milwaukee County?
$83.76 an hour: a $55.21 base wage plus $28.55 in fringe benefits, under wage determination WI20260001, modification 1. Overtime and every operating engineer classification in Milwaukee County.
Does operating engineer prevailing wage include fringe benefits?
Yes. In Milwaukee County the $83.76 total is a $55.21 base wage plus $28.55 in fringe benefits, about 34% of the total. The employer owes the full amount for every hour worked.
Does operating engineer prevailing wage pay overtime in Wisconsin?
Davis-Bacon rates are straight time. On contracts over $100,000, the Contract Work Hours and Safety Standards Act requires 1½ times the basic rate for hours over 40 in a workweek (40 U.S.C. 3702). The fringe is owed for every hour at its straight-time amount.
Do apprentice operating engineers get this rate?
Davis-Bacon determinations list journeyworker rates. Apprentices in a program registered with DOL or a recognized state agency can be paid the program's percentage of the rate, within its ratio; anyone else gets the full rate (29 CFR 5.5(a)(4)).
Why do some counties have the same operating engineer rate?
DOL often publishes the same operating engineer rates for several counties. Across Wisconsin, the 72 counties with an operating engineer rate fall into 21 distinct sets of rates, and 6 of those sets are shared by more than one county; the largest covers 47 counties (the Walworth County group).