Skip to content

Home / Davis-Bacon changes / Nevada

Nevada Davis-Bacon wage determination changes, 2026

The U.S. Department of Labor published 60 modifications to 58 of Nevada's Davis-Bacon wage determinations between May 18, 2026 and July 30, 2026 that changed, added or removed a rate. Across them, 515 rates went up, 4 went down, 885 rows were added and 712 removed.

From every revision of each WD on SAM.gov, compared row by row (rate identifier and classification) and read twice. 7 of these modifications are dated May 18, 2026, when DOL reissued most WDs. Totals are base plus fringe. A contract keeps the modification in its bid documents, so a later one only reaches new bids. Nevada prevailing wage rates by county

Largest rate changes

The 20 biggest moves in the hourly total (base where the fringe isn't a dollar figure), one row per WD classification.

ClassificationWDBeforeAfterChange
TILE FINISHER ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE
Tile Finisher · BRNV0013-004
NV20260001 mod 2, May 26, 2026
Clark, Lincoln, Nye
$70.81$49.84−$20.97
Elevator Constructor: Journeyman Mech
Sheet Metal Worker · SANV2025-001
NV20260091 mod 2, Jul 30, 2026
Clark
$109.47$119.03+$9.56
Elevator Constructor: Journeyman Mech
Sheet Metal Worker · SANV2025-001
NV20260085 mod 1, Jul 30, 2026
Esmeralda
$109.47$119.03+$9.56
Elevator Constructor: Journeyman Mech
Sheet Metal Worker · SANV2025-001
NV20260082 mod 2, Jul 30, 2026
Nye
$109.47$119.03+$9.56
Elevator Constructor: Journeyman Mech
Sheet Metal Worker · SANV2025-001
NV20260080 mod 2, Jul 30, 2026
Lincoln
$109.47$119.03+$9.56
Piledriver: Diver-Diving (Wet Pay)
Pile Driver · SANV2025-001
NV20260110 mod 1, Jul 30, 2026
Washoe
$115.61$123.27+$7.66
Piledriver: Diver-Diving (Wet Pay)
Pile Driver · SANV2025-001
NV20260109 mod 1, Jul 30, 2026
Storey
$115.61$123.27+$7.66
Piledriver: Diver-Diving (Wet Pay)
Pile Driver · SANV2025-001
NV20260107 mod 1, Jul 30, 2026
Carson City
$115.61$123.27+$7.66
Piledriver: Diver-Diving (Wet Pay)
Pile Driver · SANV2025-001
NV20260104 mod 1, Jul 30, 2026
Eureka
$115.61$123.27+$7.66
Piledriver: Diver-Diving (Wet Pay)
Pile Driver · SANV2025-001
NV20260103 mod 1, Jul 30, 2026
Elko
$115.61$123.27+$7.66
Piledriver: Diver-Diving (Wet Pay)
Pile Driver · SANV2025-001
NV20260102 mod 1, Jul 30, 2026
White Pine
$115.61$123.27+$7.66
Piledriver: Diver-Diving (Wet Pay)
Pile Driver · SANV2025-001
NV20260101 mod 1, Jul 30, 2026
Pershing
$115.61$123.27+$7.66
Piledriver: Diver-Diving (Wet Pay)
Pile Driver · SANV2025-001
NV20260099 mod 1, Jul 30, 2026
Mineral
$115.61$123.27+$7.66
Piledriver: Diver-Diving (Wet Pay)
Pile Driver · SANV2025-001
NV20260098 mod 1, Jul 30, 2026
Lyon
$115.61$123.27+$7.66
Piledriver: Diver-Diving (Wet Pay)
Pile Driver · SANV2025-001
NV20260097 mod 1, Jul 30, 2026
Lander
$115.61$123.27+$7.66
Piledriver: Diver-Diving (Wet Pay)
Pile Driver · SANV2025-001
NV20260096 mod 1, Jul 30, 2026
Humboldt
$115.61$123.27+$7.66
Piledriver: Diver-Diving (Wet Pay)
Pile Driver · SANV2025-001
NV20260095 mod 1, Jul 30, 2026
Douglas
$115.61$123.27+$7.66
Piledriver: Diver-Diving (Wet Pay)
Pile Driver · SANV2025-001
NV20260094 mod 1, Jul 30, 2026
Churchill
$115.61$123.27+$7.66
Piledriver: Diver-Diving (Wet Pay)
Pile Driver · SANV2025-001
NV20260093 mod 1, Jul 30, 2026
Washoe
$115.61$123.27+$7.66
Piledriver: Diver-Diving (Wet Pay)
Pile Driver · SANV2025-001
NV20260092 mod 1, Jul 30, 2026
Storey
$115.61$123.27+$7.66

Every modification, newest first

Each row links the new revision on SAM.gov; "before" links the one it replaced.

July 30, 2026 51 modifications

WDConstructionCountiesUpDownAddedRemoved
NV20260110 mod 1 (before)
Largest: Piledriver: Diver-Diving (Wet Pay) +$7.66
highwayWashoe721
NV20260109 mod 1 (before)
Largest: Piledriver: Diver-Diving (Wet Pay) +$7.66
highwayStorey711
NV20260108 mod 2 (before)
Largest: Piledriver: Diver-Diving (Wet Pay) +$5.44
highwayClark2499
NV20260107 mod 1 (before)
Largest: Piledriver: Diver-Diving (Wet Pay) +$7.66
highwayCarson City711
NV20260106 mod 2 (before)
Largest: Piledriver: Diver-Diving (Wet Pay) +$5.44
highwayLincoln2477
NV20260105 mod 1 (before)
Largest: Piledriver: Diver-Diving (Wet Pay) +$5.44
highwayEsmeralda2477
NV20260104 mod 1 (before)
Largest: Piledriver: Diver-Diving (Wet Pay) +$7.66
highwayEureka711
NV20260103 mod 1 (before)
Largest: Piledriver: Diver-Diving (Wet Pay) +$7.66
highwayElko711
NV20260102 mod 1 (before)
Largest: Piledriver: Diver-Diving (Wet Pay) +$7.66
highwayWhite Pine711
NV20260101 mod 1 (before)
Largest: Piledriver: Diver-Diving (Wet Pay) +$7.66
highwayPershing711
NV20260100 mod 2 (before)
Largest: Piledriver: Diver-Diving (Wet Pay) +$5.44
highwayNye2477
NV20260099 mod 1 (before)
Largest: Piledriver: Diver-Diving (Wet Pay) +$7.66
highwayMineral711
NV20260098 mod 1 (before)
Largest: Piledriver: Diver-Diving (Wet Pay) +$7.66
highwayLyon711
NV20260097 mod 1 (before)
Largest: Piledriver: Diver-Diving (Wet Pay) +$7.66
highwayLander711
NV20260096 mod 1 (before)
Largest: Piledriver: Diver-Diving (Wet Pay) +$7.66
highwayHumboldt711
NV20260095 mod 1 (before)
Largest: Piledriver: Diver-Diving (Wet Pay) +$7.66
highwayDouglas711
NV20260094 mod 1 (before)
Largest: Piledriver: Diver-Diving (Wet Pay) +$7.66
highwayChurchill711
NV20260093 mod 1 (before)
Largest: Piledriver: Diver-Diving (Wet Pay) +$7.66
buildingWashoe1011
NV20260092 mod 1 (before)
Largest: Piledriver: Diver-Diving (Wet Pay) +$7.66
buildingStorey1011
NV20260091 mod 2 (before)
Largest: Elevator Constructor: Journeyman Mech +$9.56
buildingClark271616
NV20260090 mod 1 (before)
Largest: Piledriver: Diver-Diving (Wet Pay) +$7.66
buildingCarson City1013
NV20260089 mod 1 (before)
Largest: Piledriver: Diver-Diving (Wet Pay) +$7.66
buildingWhite Pine1011
NV20260088 mod 1 (before)
Largest: Piledriver: Diver-Diving (Wet Pay) +$7.66
buildingPershing1011
NV20260087 mod 1 (before)
Largest: Piledriver: Diver-Diving (Wet Pay) +$7.66
buildingMineral1011
NV20260086 mod 1 (before)
Largest: Piledriver: Diver-Diving (Wet Pay) +$7.66
buildingLander1011
NV20260085 mod 1 (before)
Largest: Elevator Constructor: Journeyman Mech +$9.56
buildingEsmeralda29188
NV20260084 mod 1 (before)
Largest: Piledriver: Diver-Diving (Wet Pay) +$7.66
buildingEureka1011
NV20260083 mod 1 (before)
Largest: Piledriver: Diver-Diving (Wet Pay) +$7.66
buildingElko1011
NV20260082 mod 2 (before)
Largest: Elevator Constructor: Journeyman Mech +$9.56
buildingNye28199
NV20260081 mod 1 (before)
Largest: Piledriver: Diver-Diving (Wet Pay) +$7.66
buildingLyon1011
NV20260080 mod 2 (before)
Largest: Elevator Constructor: Journeyman Mech +$9.56
buildingLincoln29188
NV20260079 mod 1 (before)
Largest: Piledriver: Diver-Diving (Wet Pay) +$7.66
buildingHumboldt1011
NV20260078 mod 1 (before)
Largest: Piledriver: Diver-Diving (Wet Pay) +$7.66
buildingDouglas1011
NV20260077 mod 1 (before)
Largest: Piledriver: Diver-Diving (Wet Pay) +$7.66
buildingChurchill1011
NV20260076 mod 1 (before)
Largest: Piledriver: Diver-Diving (Wet Pay) +$7.66
heavyMineral711
NV20260075 mod 1 (before)heavyEsmeralda104106
NV20260074 mod 2 (before)heavyNye104106
NV20260073 mod 1 (before)heavyWashoe8282
NV20260072 mod 1 (before)
Largest: Piledriver: Diver-Diving (Wet Pay) +$7.66
heavyStorey711
NV20260071 mod 2 (before)heavyClark104105
NV20260070 mod 1 (before)
Largest: Piledriver: Diver-Diving (Wet Pay) +$7.66
heavyCarson City711
NV20260069 mod 1 (before)
Largest: Piledriver: Diver-Diving (Wet Pay) +$7.66
heavyLyon711
NV20260068 mod 1 (before)
Largest: Piledriver: Diver-Diving (Wet Pay) +$7.66
heavyDouglas711
NV20260067 mod 1 (before)
Largest: Piledriver: Diver-Diving (Wet Pay) +$7.66
heavyWhite Pine711
NV20260066 mod 1 (before)
Largest: Piledriver: Diver-Diving (Wet Pay) +$7.66
heavyPershing711
NV20260065 mod 2 (before)heavyLincoln104106
NV20260064 mod 1 (before)
Largest: Piledriver: Diver-Diving (Wet Pay) +$7.66
heavyLander711
NV20260063 mod 1 (before)
Largest: Piledriver: Diver-Diving (Wet Pay) +$7.66
heavyHumboldt711
NV20260062 mod 1 (before)
Largest: Piledriver: Diver-Diving (Wet Pay) +$7.66
heavyEureka711
NV20260061 mod 1 (before)
Largest: Piledriver: Diver-Diving (Wet Pay) +$7.66
heavyElko711
NV20260060 mod 1 (before)
Largest: Piledriver: Diver-Diving (Wet Pay) +$7.66
heavyChurchill711

June 1, 2026 1 modification

WDConstructionCountiesUpDownAddedRemoved
NV20260002 mod 3 (before)building, highway and heavyClark, Lincoln, Nye5252

May 26, 2026 1 modification

WDConstructionCountiesUpDownAddedRemoved
NV20260001 mod 2 (before)
Largest: TILE FINISHER ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 Z −$20.97
building, highway and heavyClark, Lincoln, Nye114444

May 18, 2026 7 modifications

WDConstructionCountiesUpDownAddedRemoved
NV20260045 mod 1 (before)residentialEsmeralda, Lincoln, Nye and 10 more10
NV20260044 mod 2 (before)residentialWashoe16
NV20260043 mod 2 (before)residentialStorey16
NV20260042 mod 2 (before)residentialClark21
NV20260041 mod 2 (before)residentialCarson City16
NV20260002 mod 2 (before)building, highway and heavyClark, Lincoln, Nye52
NV20260001 mod 1 (before)building, highway and heavyClark, Lincoln, Nye50

Questions about Nevada's Davis-Bacon changes

How often do Davis-Bacon wage rates change in Nevada?

Whenever DOL modifies a wage determination. Between May 18, 2026 and July 30, 2026, DOL published 60 modifications to 58 Nevada wage determinations that changed, added or removed a rate; 7 of them are dated May 18, 2026, when DOL reissued most WDs.

Which Nevada Davis-Bacon rate changed the most in 2026?

TILE FINISHER ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE (tile finisher) on NV20260001: $70.81 to $49.84 an hour in modification 2, published May 26, 2026, for building, highway and heavy construction.

Does a new modification change the rates on my contract?

A contract keeps the wage determination in its bid documents. Modifications published before bid opening apply to it, though one published less than 10 days before can be left out if the agency finds there isn't time to tell bidders (29 CFR 1.6(c)).

Where are the official Nevada wage determinations?

On SAM.gov. Each row on this page links the new revision there and the one it replaced, and every Nevada rate page names its WD and modification.

Davis-Bacon changes in every state · How we check · Report an error