Skip to content

Home / Idaho / Camas County / Operating Engineer

Camas County, ID · Operating Engineer

Operating Engineer prevailing wage in Camas County, Idaho

Which kind of construction is the job?

The kind of construction decides the rate: each wage determination covers one. Residential covers homes and apartments up to four stories.

$37.82an hour, base wage + fringe benefits (our sum) · CRANE

$27.29 base wage + $10.53 fringe benefits

OPERATOR: CRANE · SUID2010-015

$9.78an hour, base wage + fringe benefits (our sum)

$8.36 base wage + $1.42 fringe benefits

POWER EQUIPMENT OPERATORS: (BACKHOE) · SUID1989-001

$36.04an hour, base wage + fringe benefits (our sum)

$26.04 base wage + $10.00 fringe benefits

OPERATOR: CRANE · SUID2013-017

$37.19an hour, base wage + fringe benefits (our sum)

$27.59 base wage + $9.60 fringe benefits

OPERATOR: CRANE · SUID2010-036

On federally funded or assisted building construction in Camas County, an operating engineer working as crane must be paid at least $37.82 an hour: a $27.29 base wage plus $10.53 in fringe benefits, under wage determination ID20260022 (modification 2). DOL prints no total, so $37.82 is our sum of the two.

Wage determination ID20260022, modification 2, published May 18, 2026, for building construction; rate identifier SUID2010-015 (August 8, 2012). Checked against sam.gov on October 25, 2026.

On federally funded or assisted residential construction in Camas County, an operating engineer must be paid at least $9.78 an hour: a $8.36 base wage plus $1.42 in fringe benefits, under wage determination ID20260006 (modification 1). DOL prints no total, so $9.78 is our sum of the two.

Wage determination ID20260006, modification 1, published May 18, 2026, for residential construction; rate identifier SUID1989-001 (April 23, 1989). Checked against sam.gov on October 25, 2026.

On federally funded or assisted highway construction in Camas County, an operating engineer must be paid at least $36.04 an hour: a $26.04 base wage plus $10.00 in fringe benefits, under wage determination ID20260089 (modification 2). DOL prints no total, so $36.04 is our sum of the two.

Wage determination ID20260089, modification 2, published May 18, 2026, for highway construction; rate identifier SUID2013-017 (June 17, 2013). Checked against sam.gov on October 25, 2026.

On federally funded or assisted heavy construction in Camas County, an operating engineer must be paid at least $37.19 an hour: a $27.59 base wage plus $9.60 in fringe benefits, under wage determination ID20260043 (modification 2). DOL prints no total, so $37.19 is our sum of the two.

Wage determination ID20260043, modification 2, published May 18, 2026, for heavy construction; rate identifier SUID2010-036 (August 8, 2012). Checked against sam.gov on October 25, 2026.

Davis-Bacon is the only prevailing wage here (federally funded or assisted work). Idaho repealed its law in 1985 (DOL state table).

DOL lists 27 operating engineer rates for Camas County, from $9.78 to $37.82 an hour. See all of them.

Base wage and fringe benefits: $27.29 + $10.53

The base wage is the taxable hourly wage. DOL prints the fringe benefits as one hourly figure, not itemized; it can go to health, pension, vacation and training plans, or be paid as cash where the state allows.

Base wage (taxable)$27.29
Fringe benefits (one figure, not itemized)$10.53
Base + fringe benefits (our sum; DOL prints no total)$37.82

Base wage and fringe benefits: $8.36 + $1.42

The base wage is the taxable hourly wage. DOL prints the fringe benefits as one hourly figure, not itemized; it can go to health, pension, vacation and training plans, or be paid as cash where the state allows.

Base wage (taxable)$8.36
Fringe benefits (one figure, not itemized)$1.42
Base + fringe benefits (our sum; DOL prints no total)$9.78

Base wage and fringe benefits: $26.04 + $10.00

The base wage is the taxable hourly wage. DOL prints the fringe benefits as one hourly figure, not itemized; it can go to health, pension, vacation and training plans, or be paid as cash where the state allows.

Base wage (taxable)$26.04
Fringe benefits (one figure, not itemized)$10.00
Base + fringe benefits (our sum; DOL prints no total)$36.04

Base wage and fringe benefits: $27.59 + $9.60

The base wage is the taxable hourly wage. DOL prints the fringe benefits as one hourly figure, not itemized; it can go to health, pension, vacation and training plans, or be paid as cash where the state allows.

Base wage (taxable)$27.59
Fringe benefits (one figure, not itemized)$9.60
Base + fringe benefits (our sum; DOL prints no total)$37.19

When does this rate change?

Every operating engineer rate in Camas County

As DOL lists them. The highlighted row is the one this page leads with.

ClassificationBase wageFringe benefitsTotal rateWD
OPERATOR: CRANEBuildingSUID2010-015$27.29 $10.53 $37.82 ID20260022 Mod 2
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOEBuildingSUID2010-015$18.96 $4.42 $23.38 ID20260022 Mod 2
POWER EQUIPMENT OPERATOR: GROUP 7 MECHANIC ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVEHighwayENGI0302-015
POWER EQUIPMENT OPERATOR: GROUP 7 MECHANIC ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE
DOL prints this rate per day: $37.35 base, fringe “16.10”.
———ID20260089 Mod 2
OPERATOR: SCREEDHighwaySUID2013-017$25.63 $10.34 $35.97 ID20260089 Mod 2
OPERATOR: ROTOMILLHighwaySUID2013-017$26.54 $10.00 $36.54 ID20260089 Mod 2
OPERATOR: ROLLER (SUBGRADE)HighwaySUID2013-017$22.24 $8.57 $30.81 ID20260089 Mod 2
OPERATOR: ROLLERHighwaySUID2013-017$25.47 $10.32 $35.79 ID20260089 Mod 2
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)HighwaySUID2013-017$25.67 $10.56 $36.23 ID20260089 Mod 2
OPERATOR: OILERHighwaySUID2013-017$25.66 $9.23 $34.89 ID20260089 Mod 2
OPERATOR: LOADERHighwaySUID2013-017$25.78 $10.17 $35.95 ID20260089 Mod 2
OPERATOR: HYDROSEEDERHighwaySUID2013-017$24.76 $11.51 $36.27 ID20260089 Mod 2
OPERATOR: GRADER/BLADEHighwaySUID2013-017$26.14 $10.69 $36.83 ID20260089 Mod 2
OPERATOR: CRUSHERHighwaySUID2013-017$25.06 $9.23 $34.29 ID20260089 Mod 2
OPERATOR: CRANEHighwaySUID2013-017$26.04 $10.00 $36.04 ID20260089 Mod 2
OPERATOR: BULLDOZERHighwaySUID2013-017$26.19 $9.60 $35.79 ID20260089 Mod 2
OPERATOR: BROOM/SWEEPERHighwaySUID2013-017$25.01 $10.16 $35.17 ID20260089 Mod 2
OPERATOR: BOBCAT/SKID STEER/SKID LOADERHighwaySUID2013-017$25.35 $11.55 $36.90 ID20260089 Mod 2
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOEHighwaySUID2013-017$25.80 $10.00 $35.80 ID20260089 Mod 2
POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER (OVER 80 YDS TO 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALEHeavyENGI0370-034
POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER (OVER 80 YDS TO 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE
DOL prints this rate per day: $37.58 base, fringe “16.10”.
———ID20260043 Mod 2
POWER EQUIPMENT OPERATOR: GROUP 7: DRILL (BIT 8 IN AND OVER), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALEHeavyENGI0370-034
POWER EQUIPMENT OPERATOR: GROUP 7: DRILL (BIT 8 IN AND OVER), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE
DOL prints this rate per day: $37.35 base, fringe “16.10”.
———ID20260043 Mod 2
POWER EQUIPMENT OPERATOR: GROUP 6 DRILLING (BIT UNDER 8IN), SCRAPER (UP TO AND INCLUDING 40 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY Zone 3 More than 60 miles: $35.00/per day. If a project is located in more than one zone the lower zone rate shall apply ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: All Cranes and Concrete Pump Boom Trucks 100 ft to 150 ft $.15 over scale 150 ft to 200 ft $.30 over scale Over 200 ft $.45 over scaleHeavyENGI0370-034
POWER EQUIPMENT OPERATOR: GROUP 6 DRILLING (BIT UNDER 8IN), SCRAPER (UP TO AND INCLUDING 40 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY Zone 3 More than 60 miles: $35.00/per day. If a project is located in more than one zone the lower zone rate shall apply ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: All Cranes and Concrete Pump Boom Trucks 100 ft to 150 ft $.15 over scale 150 ft to 200 ft $.30 over scale Over 200 ft $.45 over scale
DOL prints this rate per day: $36.98 base, fringe “16.10”.
———ID20260043 Mod 2
POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVEHeavyENGI0370-034
POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE
DOL prints this rate per day: $36.33 base, fringe “16.10”.
———ID20260043 Mod 2
POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER (OVER 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVEHeavyENGI0370-034
POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER (OVER 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE
DOL prints this rate per day: $38.06 base, fringe “16.10”.
———ID20260043 Mod 2
TREATMENT PLANTS: OPERATOR: EXCAVATORHeavySUID2010-036$20.24 $0.00 $20.24 ID20260043 Mod 2
OPERATOR: CONCRETE BATCH PLANTHeavySUID2010-036$24.94 $11.96 $36.90 ID20260043 Mod 2
OPERATOR: LOADER (FRONT END)HeavySUID2010-036$18.91 $0.00 $18.91 ID20260043 Mod 2
OPERATOR: GRADER/BLADEHeavySUID2010-036$25.17 $9.44 $34.61 ID20260043 Mod 2
OPERATOR: FORKLIFTHeavySUID2010-036$21.98 $0.00 $21.98 ID20260043 Mod 2
OPERATOR: CRANEHeavySUID2010-036$27.59 $9.60 $37.19 ID20260043 Mod 2
OPERATOR: BOBCAT/SKID STEER/SKID LOADERHeavySUID2010-036$17.00 $0.00 $17.00 ID20260043 Mod 2
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOEHeavySUID2010-036$21.06 $0.00 $21.06 ID20260043 Mod 2
POWER EQUIPMENT OPERATORS: (BACKHOE)ResidentialSUID1989-001$8.36 $1.42 $9.78 ID20260006 Mod 1
INSULATION MECHANICResidentialSUID1989-001$9.99 $0.00 $9.99 ID20260006 Mod 1

How Camas County compares

The main operating engineer rate in every county that has one, and how the pay splits here and nearby. All bars use the same scale.

Every county in Idaho

$22.23Power$49.93Bannock
CamasNearby: Elmore $37.82, Gooding $37.82, Boise $49.48Each column is a group of counties with about the same main rate; its height is how many. 13 counties pay more than Camas, 19 the same, 11 less.

Wage and fringe benefits, nearby

  1. Camas Countybase $27.29$37.82
  2. Elmore Countybase $27.29$37.82
  3. Gooding Countybase $27.29$37.82
  4. Boise Countybase $31.13$49.48

Operating Engineer rates in nearby counties

Current DOL rates. Davis-Bacon rates are set for groups of counties, so neighbours often share them; the county where the work is done decides.

CountyClassificationBase wageTotal ratevs Camas County
Boise CountyOPERATOR: CRANE$31.13 $49.48 +$11.66
Camas CountyOPERATOR: CRANE$27.29 $37.82 
Elmore CountyOPERATOR: CRANE$27.29 $37.82 same
Gooding CountyOPERATOR: CRANE$27.29 $37.82 same
Blaine CountyOPERATOR: CRANE$27.29 $37.82 same
Lincoln CountyOPERATOR: CRANE$27.29 $37.82 same
Custer CountyOPERATOR: CRANE$26.22 $36.22 −$1.60

Idaho operating engineer prevailing wage by county, with a map

More from DOL on this rate

All Camas County prevailing wage rates

Are you being paid this rate?

Add your base pay to the fringe your employer pays for you, in cash or into plans, and compare the sum with the total. The Department of Labor's Wage and Hour Division takes complaints: 1-866-487-9243, or dol.gov/agencies/whd/contact/complaints.

Source

U.S. Department of Labor, Wage and Hour Division (DOL), wage determination ID20260022 Mod 2, published May 18, 2026: sam.gov/wage-determination/ID20260022/2

We read every active Idaho Davis-Bacon wage determination from SAM.gov's own data and check every number with a second, independent read of the same file. DOL prints no total; ours is base plus fringe. How we check · Download Camas County as CSV · Report an error