Skip to content

Home / Minnesota / Otter Tail County / Operating Engineer

Otter Tail County, MN · Operating Engineer

Operating Engineer prevailing wage in Otter Tail County, Minnesota

$78.24an hour, base wage + fringe benefits

$48.89 base wage + $29.35 fringe benefits · Adjacent-county rate

On Minnesota public works in Otter Tail County, an operating engineer must be paid at least $78.24 an hour: a $48.89 base wage plus $29.35 in fringe.

DLI certifications of Nov 3 and Dec 22, 2025 (revised to Feb 9, 2026); this rate, effective December 22, 2025. The rates "must be ascertained before the state asks for bids" and written into the contract, with their dated steps (Minn. Stat. 177.43). Checked against dli.mn.gov on October 25, 2026.

DLI lists 14 operating engineer rates for Otter Tail County, from $20.00 to $82.48 an hour. See all of them.

Base wage and fringe benefits: $48.89 + $29.35

The base wage is the taxable hourly wage. DLI prints the fringe as one hourly figure, not itemized; it can go to health, pension, vacation and training plans, or be paid as cash where the state allows.

Base wage (taxable)$48.89
Fringe benefits (one figure, not itemized)$29.35
Total hourly rate, as printed$78.24

When does this rate change?

Every operating engineer rate in Otter Tail County

As DLI lists them. The highlighted row is the one this page leads with.

  1. Commercial Power Equipment Operator - Group 2$82.48
  2. Commercial Power Equipment Operator - Group 3$80.85
  3. Commercial Power Equipment Operator - Group 1Adjacent-county rate$78.24
  4. Commercial Power Equipment Operator - Group 5$77.37
  5. Commercial Power Equipment Operator - Group 7$74.34
  6. Commercial Power Equipment Operator - Group 6Adjacent-county rate$59.45
  7. Commercial Power Equipment Operator - Group 4Adjacent-county rate$59.20
  8. Highway/Heavy Power Equipment Operator - Group 3Adjacent-county rate$39.75
  9. Highway/Heavy Power Equipment Operator - Group 4Adjacent-county rate$38.00
  10. Highway/Heavy Power Equipment Operator - Group 5Adjacent-county rate$33.00
  11. Highway/Heavy Power Equipment Operator - Group 2Adjacent-county rate$27.00
  12. LANDSCAPING EQUIPMENT, INCLUDES HYDRO SEEDER OR MULCHER, SOD ROLLER, FARM TRACTOR WITH ATTACHMENT SPECIFICALLY SEEDING, SODDING, OR PLANT, AND TWO-FRAMED FORKLIFT (EXCLUDING FRONT, POSIT-TRACK, AND SKID STEER LOADERS), NO EARTHWORK OR GRADING FOR ELEVATIONS (203)Adjacent-county rate$26.00
  13. BOOM TRUCK (202)$20.91
  14. Highway/Heavy Power Equipment Operator - Group 6Adjacent-county rate$20.00
Hourly rate of each operating engineer classification in Otter Tail County, highest first, split into wage and fringe.
ClassificationBase wageFringe benefitsTotal rateEffective
ARTICULATED HAULER (201)
FOR RATE CALL 651-284-5091 OR EMAIL DLI.PREVWAGE@STATE.MN.US
————
BOOM TRUCK (202)$20.00 $0.91 $20.91 Dec 22, 2025
LANDSCAPING EQUIPMENT, INCLUDES HYDRO SEEDER OR MULCHER, SOD ROLLER, FARM TRACTOR WITH ATTACHMENT SPECIFICALLY SEEDING, SODDING, OR PLANT, AND TWO-FRAMED FORKLIFT (EXCLUDING FRONT, POSIT-TRACK, AND SKID STEER LOADERS), NO EARTHWORK OR GRADING FOR ELEVATIONS (203)Adjacent-county rate$24.00 $2.00 $26.00 Dec 22, 2025
OFF-ROAD TRUCK (204)
FOR RATE CALL 651-284-5091 OR EMAIL DLI.PREVWAGE@STATE.MN.US
————
Highway/Heavy Power Equipment Operator - Group 2Adjacent-county rate$24.00 $3.00 $27.00 Dec 22, 2025
Highway/Heavy Power Equipment Operator - Group 3Adjacent-county rate$31.00 $8.75 $39.75 Dec 22, 2025
Highway/Heavy Power Equipment Operator - Group 4Adjacent-county rate$38.00 $0.00 $38.00 Dec 22, 2025
Highway/Heavy Power Equipment Operator - Group 5Adjacent-county rate$33.00 $0.00 $33.00 Dec 22, 2025
Highway/Heavy Power Equipment Operator - Group 6Adjacent-county rate$17.00 $3.00 $20.00 Dec 22, 2025
Commercial Power Equipment Operator - Group 1Adjacent-county rate$48.89 $29.35 $78.24 Dec 22, 2025
Commercial Power Equipment Operator - Group 2$51.52 $30.96 $82.48 May 4, 2026
Commercial Power Equipment Operator - Group 3$49.89 $30.96 $80.85 May 4, 2026
Commercial Power Equipment Operator - Group 4Adjacent-county rate$38.55 $20.65 $59.20 Dec 22, 2025
Commercial Power Equipment Operator - Group 5$46.41 $30.96 $77.37 May 4, 2026
Commercial Power Equipment Operator - Group 6Adjacent-county rate$37.75 $21.70 $59.45 Dec 22, 2025
Commercial Power Equipment Operator - Group 7$43.38 $30.96 $74.34 May 4, 2026
Commercial Power Equipment Operator - Group 8
FOR RATE CALL 651-284-5091 OR EMAIL DLI.PREVWAGE@STATE.MN.US
————

Davis-Bacon operating engineer rate in Otter Tail County

Federally funded or assisted construction here uses the U.S. Department of Labor's wage determinations. When a contract requires both the state rate and the Davis-Bacon rate, paying the higher of the two meets both. The contract documents say which apply.

We don't put a federal figure next to DLI's here, because the federal determinations split this trade into groups that don't line up with DLI's. The federal rows for this trade are below; match the classification to the work.

ConstructionFederal classificationBase wageTotal rateWD
BuildingPOWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 4 : CRAWLER BACKHOE INCLUDING ATTACHMENTS; FIREPERSON, CHIEF BOILER LICENSE; HOIST ENGINEER (THREE DRUMS OR MORE); …SAMN2025-001$38.55 $59.20 MN20260082 Mod 2
BuildingPOWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 4 : AIR TRACK ROCK DRILL; AUTOMATIC ROAD MACHINE (CMI OR SIMILAR); BACKFILLER OPERATOR; BITUMINOUS ROLLERS, …SAMN2025-001$38.00 $38.00 MN20260082 Mod 2
Highway, HeavyPOWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 3 : ASPHALT BITUMINOUS STABILIZER PLANT; CABLEWAY; CONCRETE MIXER, STATIONARY PLANT; DERRICK (GUY OR …SAMN2025-001$35.93 $66.70 MN20260234 Mod 2
Highway, HeavyPOWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 4 : AIR TRACK ROCK DRILL; AUTOMATIC ROAD MACHINE (CMI OR SIMILAR); BACKFILLER OPERATOR; CONCRETE BATCH PLANT …SAMN2025-001$35.55 $66.32 MN20260234 Mod 2

Davis-Bacon rates from SAM.gov, read October 25, 2026. Our federal totals are base plus fringe; DOL prints no total. Minnesota Davis-Bacon changes

How Otter Tail County compares

The main operating engineer rate in every county that has one, and how the pay splits here and nearby. All bars use the same scale.

Every county in Minnesota

$28.00Wilkin$85.21Aitkin
Otter TailNearby: Douglas $78.24, Grant $66.20, Wilkin $28.00Each column is a group of counties with about the same main rate; its height is how many. 50 counties pay more than Otter Tail, 4 the same, 32 less.

Wage and fringe, nearby

  1. Otter Tail Countybase $48.89$78.24
  2. Douglas Countybase $48.89$78.24
  3. Grant Countybase $43.35$66.20
  4. Wilkin Countybase $28.00$28.00

Operating Engineer rates in nearby counties

Current DLI rates. Commercial rates are county by county, highway and heavy by area (Minn. R. 5200.1030, 5200.1035).

CountyClassificationBase wageTotal ratevs Otter Tail County
Wadena CountyCommercial Power Equipment Operator - Group 1$51.03 $80.43 +$2.19
Todd CountyCommercial Power Equipment Operator - Group 1$51.03 $80.43 +$2.19
Otter Tail CountyCommercial Power Equipment Operator - Group 1$48.89 $78.24 
Douglas CountyCommercial Power Equipment Operator - Group 1$48.89 $78.24 same
Grant CountyCommercial Power Equipment Operator - Group 1$43.35 $66.20 −$12.04
Becker CountyCommercial Power Equipment Operator - Group 1$43.35 $66.20 −$12.04
Wilkin CountyHighway/Heavy Power Equipment Operator - Group 2$28.00 $28.00 −$50.24

Minnesota operating engineer prevailing wage by county, with a map

Notes on this rate

DLI's notes, in DLI's words.

More from DLI on this rate

All Otter Tail County prevailing wage rates

Are you being paid this rate?

Add your basic rate to what your employer pays into fringe plans for you, and compare it with the total. Contractors post the rates on site and give payroll copies to the contracting agency within 14 days of each pay period (Minn. Stat. 177.43). DLI Prevailing Wage: 651-284-5091.

Source

Department of Labor and Industry (DLI), DLI schedule DLI-C-56-2025-12-22, issued December 22, 2025, effective December 22, 2025, page 506: workplace.doli.state.mn.us/prevwage/report/consolidated/commercial.pdf

We read DLI's consolidated commercial and highway/heavy PDFs line by line and check every number with a second, separate reader. Basic plus fringe equals DLI's printed total on every priced row. How we check · Download Otter Tail County as CSV · Report an error