Operating Engineer prevailing wage in Swift County, Minnesota

$66.20an hour, base wage + fringe benefits

$43.35 base wage + $22.85 fringe benefits

On Minnesota public works in Swift County, an operating engineer must be paid at least $66.20 an hour: a $43.35 base wage plus $22.85 in fringe.

DLI certifications of Nov 3 and Dec 22, 2025 (revised to Feb 9, 2026); this rate, effective December 22, 2025. The rates "must be ascertained before the state asks for bids" and written into the contract, with their dated steps (Minn. Stat. 177.43). Checked against dli.mn.gov on October 25, 2026.

DLI lists 14 operating engineer rates for Swift County, from $15.00 to $82.48 an hour. See all of them.

Base wage and fringe benefits: $43.35 + $22.85

The base wage is the taxable hourly wage. DLI prints the fringe as one hourly figure, not itemized; it can go to health, pension, vacation and training plans, or be paid as cash where the state allows.

Base wage (taxable)$43.35
Fringe benefits (one figure, not itemized)$22.85
Total hourly rate, as printed$66.20

When does this rate change?

Every operating engineer rate in Swift County

As DLI lists them. The highlighted row is the one this page leads with.

  1. Commercial Power Equipment Operator - Group 2$82.48
  2. Commercial Power Equipment Operator - Group 4Adjacent-county rate$80.48
  3. Commercial Power Equipment Operator - Group 5Adjacent-county rate$77.37
  4. Commercial Power Equipment Operator - Group 7$74.34
  5. Commercial Power Equipment Operator - Group 1$66.20
  6. Commercial Power Equipment Operator - Group 6Adjacent-county rate$61.40
  7. Highway/Heavy Power Equipment Operator - Group 3Adjacent-county rate$54.92
  8. LANDSCAPING EQUIPMENT, INCLUDES HYDRO SEEDER OR MULCHER, SOD ROLLER, FARM TRACTOR WITH ATTACHMENT SPECIFICALLY SEEDING, SODDING, OR PLANT, AND TWO-FRAMED FORKLIFT (EXCLUDING FRONT, POSIT-TRACK, AND SKID STEER LOADERS), NO EARTHWORK OR GRADING FOR ELEVATIONS (203)Adjacent-county rate$46.20
  9. Commercial Power Equipment Operator - Group 3Adjacent-county rate$46.03
  10. Highway/Heavy Power Equipment Operator - Group 2$40.00
  11. Highway/Heavy Power Equipment Operator - Group 4Adjacent-county rate$36.00
  12. Highway/Heavy Power Equipment Operator - Group 5$31.50
  13. ARTICULATED HAULER (201)$17.50
  14. Highway/Heavy Power Equipment Operator - Group 6Adjacent-county rate$15.00
Hourly rate of each operating engineer classification in Swift County, highest first, split into wage and fringe.
ClassificationBase wageFringe benefitsTotal rateEffective
ARTICULATED HAULER (201)$17.50 $0.00 $17.50 Dec 22, 2025
BOOM TRUCK (202)Adjacent-county rate
FOR RATE CALL 651-284-5091 OR EMAIL DLI.PREVWAGE@STATE.MN.US
————
LANDSCAPING EQUIPMENT, INCLUDES HYDRO SEEDER OR MULCHER, SOD ROLLER, FARM TRACTOR WITH ATTACHMENT SPECIFICALLY SEEDING, SODDING, OR PLANT, AND TWO-FRAMED FORKLIFT (EXCLUDING FRONT, POSIT-TRACK, AND SKID STEER LOADERS), NO EARTHWORK OR GRADING FOR ELEVATIONS (203)Adjacent-county rate$26.89 $19.31 $46.20 Dec 22, 2025
OFF-ROAD TRUCK (204)
FOR RATE CALL 651-284-5091 OR EMAIL DLI.PREVWAGE@STATE.MN.US
————
Highway/Heavy Power Equipment Operator - Group 2$40.00 $0.00 $40.00 Dec 22, 2025
Highway/Heavy Power Equipment Operator - Group 3Adjacent-county rate$31.47 $23.45 $54.92 Dec 22, 2025
Highway/Heavy Power Equipment Operator - Group 4Adjacent-county rate$36.00 $0.00 $36.00 Dec 22, 2025
Highway/Heavy Power Equipment Operator - Group 5$31.50 $0.00 $31.50 Dec 22, 2025
Highway/Heavy Power Equipment Operator - Group 6Adjacent-county rate$15.00 $0.00 $15.00 Dec 22, 2025
Commercial Power Equipment Operator - Group 1$43.35 $22.85 $66.20 Dec 22, 2025
Commercial Power Equipment Operator - Group 2$51.52 $30.96 $82.48 May 4, 2026
Commercial Power Equipment Operator - Group 3Adjacent-county rate$35.50 $10.53 $46.03 Dec 22, 2025
Commercial Power Equipment Operator - Group 4Adjacent-county rate$49.52 $30.96 $80.48 May 4, 2026
Commercial Power Equipment Operator - Group 5Adjacent-county rate$46.41 $30.96 $77.37 May 4, 2026
Commercial Power Equipment Operator - Group 6Adjacent-county rate$38.55 $22.85 $61.40 Dec 22, 2025
Commercial Power Equipment Operator - Group 7$43.38 $30.96 $74.34 May 4, 2026
Commercial Power Equipment Operator - Group 8Adjacent-county rate
FOR RATE CALL 651-284-5091 OR EMAIL DLI.PREVWAGE@STATE.MN.US
————

Davis-Bacon operating engineer rate in Swift County

Federally funded or assisted construction here uses the U.S. Department of Labor's wage determinations. When a contract requires both the state rate and the Davis-Bacon rate, paying the higher of the two meets both. The contract documents say which apply.

We don't put a federal figure next to DLI's here, because the federal determinations split this trade into groups that don't line up with DLI's. The federal rows for this trade are below; match the classification to the work.

ConstructionFederal classificationBase wageTotal rateWD
BuildingPOWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 4 : CRAWLER BACKHOE INCLUDING ATTACHMENTS; FIREPERSON, CHIEF BOILER LICENSE; HOIST ENGINEER (THREE DRUMS OR MORE); …SAMN2025-001$49.52 $80.48 MN20260102 Mod 2
BuildingPOWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 4 : AIR TRACK ROCK DRILL; AUTOMATIC ROAD MACHINE (CMI OR SIMILAR); BACKFILLER OPERATOR; BITUMINOUS ROLLERS, …SAMN2025-001$36.00 $36.00 MN20260102 Mod 2
Highway, HeavyPOWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 3 : ASPHALT BITUMINOUS STABILIZER PLANT; CABLEWAY; CONCRETE MIXER, STATIONARY PLANT; DERRICK (GUY OR …SAMN2025-001$35.93 $66.70 MN20260234 Mod 2
Highway, HeavyPOWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 4 : AIR TRACK ROCK DRILL; AUTOMATIC ROAD MACHINE (CMI OR SIMILAR); BACKFILLER OPERATOR; CONCRETE BATCH PLANT …SAMN2025-001$35.55 $66.32 MN20260234 Mod 2

Davis-Bacon rates from SAM.gov, read October 25, 2026. Our federal totals are base plus fringe; DOL prints no total. Minnesota Davis-Bacon changes

How Swift County compares

The main operating engineer rate in every county that has one, and how the pay splits here and nearby. All bars use the same scale.

Every county in Minnesota

$28.00Wilkin$85.21Aitkin
SwiftNearby: Chippewa $66.20, Pope $72.39, Stevens $66.20Each column is a group of counties with about the same main rate; its height is how many. 65 counties pay more than Swift, 10 the same, 11 less.

Wage and fringe, nearby

  1. Swift Countybase $43.35$66.20
  2. Chippewa Countybase $43.35$66.20
  3. Pope Countybase $47.19$72.39
  4. Stevens Countybase $43.35$66.20

Operating Engineer rates in nearby counties

Current DLI rates. Commercial rates are county by county, highway and heavy by area (Minn. R. 5200.1030, 5200.1035).

CountyClassificationBase wageTotal ratevs Swift County
Kandiyohi CountyCommercial Power Equipment Operator - Group 1$49.25 $74.45 +$8.25
Pope CountyCommercial Power Equipment Operator - Group 1$47.19 $72.39 +$6.19
Swift CountyCommercial Power Equipment Operator - Group 1$43.35 $66.20 
Chippewa CountyCommercial Power Equipment Operator - Group 1$43.35 $66.20 same
Stevens CountyCommercial Power Equipment Operator - Group 1$43.35 $66.20 same
Lac qui Parle CountyCommercial Power Equipment Operator - Group 1$43.35 $66.20 same
Big Stone CountyCommercial Power Equipment Operator - Group 1$43.35 $66.20 same

Minnesota operating engineer prevailing wage by county, with a map

More from DLI on this rate

All Swift County prevailing wage rates

Are you being paid this rate?

Add your basic rate to what your employer pays into fringe plans for you, and compare it with the total. Contractors post the rates on site and give payroll copies to the contracting agency within 14 days of each pay period (Minn. Stat. 177.43). DLI Prevailing Wage: 651-284-5091.

Source

Department of Labor and Industry (DLI), DLI schedule DLI-C-76-2025-12-22, issued December 22, 2025, effective December 22, 2025, page 690: workplace.doli.state.mn.us/prevwage/report/consolidated/commercial.pdf

We read DLI's consolidated commercial and highway/heavy PDFs line by line and check every number with a second, separate reader. Basic plus fringe equals DLI's printed total on every priced row. How we check · Download Swift County as CSV · Report an error