Skip to content

Home / Oklahoma / Pontotoc County / Operating Engineer

Pontotoc County, OK · Operating Engineer

Operating Engineer prevailing wage in Pontotoc County, Oklahoma

$57.14an hour, base + fringe

$38.09 wage + $19.05 fringe benefits · Building · ENGI0627-018

Pontotoc County uses the same operating engineer rates as 3 other counties. See all of them on one page.

On federally funded or assisted building construction in Pontotoc County, an operating engineer must be paid at least $57.14 an hour: a $38.09 base wage plus $19.05 in fringe benefits, under wage determination OK20260071 (modification 1). DOL prints no total, so $57.14 is our sum of the two.

Wage determination OK20260071, modification 1, published May 18, 2026, for building construction; rate identifier ENGI0627-018 (June 1, 2025). Checked against sam.gov on October 25, 2026.

Davis-Bacon is the only prevailing wage here (federally funded or assisted work). Oklahoma's law was invalidated in 1995 and its public-works wage rules are revoked (DOL state table).

DOL lists 44 operating engineer rates for Pontotoc County, from $7.25 to $57.14 an hour. See all of them.

Base wage and fringe benefits: $38.09 + $19.05

The base wage is the taxable hourly wage. DOL prints the fringe benefits as one hourly figure, not itemized; it can go to health, pension, vacation and training plans, or be paid as cash where the state allows.

Base wage (taxable)$38.09
Fringe benefits (one figure, not itemized)$19.05
Base + fringe benefits (our sum; DOL prints no total)$57.14

When this rate changes

Every operating engineer rate in Pontotoc County

As DOL lists them. The highlighted row is the one this page leads with.

ClassificationBase + fringeBaseFringe benefitsWD
POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZERBuildingENGI0627-018$53.12 $34.07 $19.05 OK20260071 Mod 1
POWER EQUIPMENT OPERATOR: GROUP 3 ALL CRANE TYPE EQUIPMENT 50 TON CAPACITY AND LARGER, AND LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT (AS RATED BY MFG.) 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER (WITH 30' AND LONGER MAST)BuildingENGI0627-018$54.45 $35.40 $19.05 OK20260071 Mod 1
POWER EQUIPMENT OPERATOR: GROUP 2 ALL CRANE TYPE EQUIPMENT 100 TON CAPACITY AND LARGER CRANES, AND LESS THAN 200 TON CAPACITYBuildingENGI0627-018$55.19 $36.14 $19.05 OK20260071 Mod 1
POWER EQUIPMENT OPERATOR: GROUP 10 OILERBuildingENGI0627-018$46.30 $27.25 $19.05 OK20260071 Mod 1
POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANESBuildingENGI0627-018$57.14 $38.09 $19.05 OK20260071 Mod 1
OPERATOR: FORKLIFTBuildingSUOK2012-051$18.02 $18.02 $0.00 OK20260071 Mod 1
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOEBuildingSUOK2012-051$16.83 $16.83 $0.00 OK20260071 Mod 1
POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (REMAINING COUNTIES)HighwaySUOK2011-007$13.10 $13.10 $0.00 OK20260020 Mod 1
POWER EQUIPMENT OPERATOR: BULLDOZER (REMAINING COUNTIES)HighwaySUOK2011-007$14.34 $14.34 $0.00 OK20260020 Mod 1
POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (REMAINING COUNTIES)HighwaySUOK2011-007$14.05 $14.05 $0.00 OK20260020 Mod 1
POWER EQUIPMENT OPERATOR: (TRENCHER)HighwaySUOK2011-007$14.66 $14.66 $0.00 OK20260020 Mod 1
POWER EQUIPMENT OPERATOR: (TRANSFER MATERIAL MACHINE)HighwaySUOK2011-007$13.13 $12.38 $0.75 OK20260020 Mod 1
POWER EQUIPMENT OPERATOR: (TRACTOR/BOX BLADE)HighwaySUOK2011-007$12.46 $12.46 $0.00 OK20260020 Mod 1
POWER EQUIPMENT OPERATOR: (SCRAPER)HighwaySUOK2011-007$14.62 $14.62 $0.00 OK20260020 Mod 1
POWER EQUIPMENT OPERATOR: (ROTOMILL)HighwaySUOK2011-007$17.33 $17.33 $0.00 OK20260020 Mod 1
POWER EQUIPMENT OPERATOR: (ROLLER (DIRT COMPACTION))HighwaySUOK2011-007$11.86 $11.86 $0.00 OK20260020 Mod 1
POWER EQUIPMENT OPERATOR: (ROLLER (ASPHALT))HighwaySUOK2011-007$12.61 $12.61 $0.00 OK20260020 Mod 1
POWER EQUIPMENT OPERATOR: (OILER)HighwaySUOK2011-007$16.06 $16.06 $0.00 OK20260020 Mod 1
POWER EQUIPMENT OPERATOR: (MIXER)HighwaySUOK2011-007$14.56 $14.56 $0.00 OK20260020 Mod 1
POWER EQUIPMENT OPERATOR: (MILLING MACHINE)HighwaySUOK2011-007$14.16 $14.16 $0.00 OK20260020 Mod 1
POWER EQUIPMENT OPERATOR: (MECHANIC)HighwaySUOK2011-007$17.37 $17.37 $0.00 OK20260020 Mod 1
POWER EQUIPMENT OPERATOR: (GRADER/BLADE)HighwaySUOK2011-007$17.04 $17.04 $0.00 OK20260020 Mod 1
POWER EQUIPMENT OPERATOR: (EXCAVATOR)HighwaySUOK2011-007$14.08 $14.08 $0.00 OK20260020 Mod 1
POWER EQUIPMENT OPERATOR: (CRANE)HighwaySUOK2011-007$16.17 $16.17 $0.00 OK20260020 Mod 1
POWER EQUIPMENT OPERATOR: (CONCRETE PAVING MACHINE)HighwaySUOK2011-007$14.42 $14.42 $0.00 OK20260020 Mod 1
POWER EQUIPMENT OPERATOR: (BROOM)HighwaySUOK2011-007$11.02 $11.02 $0.00 OK20260020 Mod 1
POWER EQUIPMENT OPERATOR: (BOBCAT/SKID LOADER)HighwaySUOK2011-007$12.62 $12.62 $0.00 OK20260020 Mod 1
POWER EQUIPMENT OPERATOR: (ASPHALT PLANT)HighwaySUOK2011-007$14.70 $14.70 $0.00 OK20260020 Mod 1
POWER EQUIPMENT OPERATOR: (ASPHALT PAVING MACHINE)HighwaySUOK2011-007$13.11 $13.11 $0.00 OK20260020 Mod 1
POWER EQUIPMENT OPERATOR: (ASPHALT PAVER SCREED)HighwaySUOK2011-007$13.99 $13.99 $0.00 OK20260020 Mod 1
POWER EQUIPMENT OPERATOR: GROUP 9 PUMPSHeavyENGI0627-017$47.30 $28.25 $19.05 OK20260035 Mod 1
POWER EQUIPMENT OPERATOR: GROUP 8 FORKLIFT;TRACTORHeavyENGI0627-017$47.82 $28.77 $19.05 OK20260035 Mod 1
POWER EQUIPMENT OPERATOR: GROUP 6 ROTARY DRILLING MACHINE WHEN OPERATED FROM CONSOLEHeavyENGI0627-017$49.92 $30.87 $19.05 OK20260035 Mod 1
POWER EQUIPMENT OPERATOR: GROUP 5 BOBCAT/SKID STEER/SKID LOADERHeavyENGI0627-017$51.76 $32.71 $19.05 OK20260035 Mod 1
POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE; MECHANIC; BACKHOE; TRACKHOE; GRADER/BLADE; POWER DRIVEN HOLE DIGGER WITH LESS THAN 30' MAST AND BULLDOZERHeavyENGI0627-017$53.12 $34.07 $19.05 OK20260035 Mod 1
POWER EQUIPMENT OPERATOR: GROUP 3 ALL CRANE TYPE EQUIPMENT 50 TON CAPACITY AND LARGER CRANES, AND LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT (AS RATED BY MFG.) 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER (WITH 30' AND LONGER MAST)HeavyENGI0627-017$54.45 $35.40 $19.05 OK20260035 Mod 1
POWER EQUIPMENT OPERATOR: GROUP 2 ALL CRANE TYPE EQUIPMENT 100 TON CAPACITY AND LARGER CRANES, AND LESS THAN 200 TON CAPACITYHeavyENGI0627-017$55.19 $36.14 $19.05 OK20260035 Mod 1
POWER EQUIPMENT OPERATOR: GROUP 10 OILERHeavyENGI0627-017$46.30 $27.25 $19.05 OK20260035 Mod 1
POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANESHeavyENGI0627-017$57.14 $38.09 $19.05 OK20260035 Mod 1
OPERATOR: SCRAPERHeavySUOK2012-013$14.00 $14.00 $0.00 OK20260035 Mod 1
POWER EQUIPMENT OPERATORS: SCRAPERSResidentialSUOK1997-009$7.25 $7.25 $0.00 OK20260001 Mod 1
POWER EQUIPMENT OPERATORS: BULLDOZERSResidentialSUOK1997-009$7.25 $7.25 $0.00 OK20260001 Mod 1
POWER EQUIPMENT OPERATORS: (FORK LIFT)ResidentialSUOK1997-009$7.25 $7.25 $0.00 OK20260001 Mod 1
POWER EQUIPMENT OPERATORS: (BACKHOE)ResidentialSUOK1997-009$7.25 $7.25 $0.00 OK20260001 Mod 1

How Pontotoc County compares

The main operating engineer rate in every county that has one, and how the pay splits here and nearby. All bars use the same scale.

Every county in Oklahoma

Wage and fringe benefits, nearby

  1. Pontotoc Countybase $38.09$57.14
  2. Coal Countybase $38.09$57.14
  3. Murray Countybase $38.09$57.14
  4. Johnston Countybase $38.09$57.14

Operating Engineer rates in nearby counties

Current DOL rates. Davis-Bacon rates are set for groups of counties, so neighbours often share them; the county where the work is done decides.

DOL's operating engineer rates for Pontotoc County are the same as in 3 other counties: Coal, Garvin, Marshall.

CountyClassificationBase + fringeBasevs Pontotoc County
Pontotoc CountyPOWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES$57.14 $38.09 
Coal CountyPOWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES$57.14 $38.09 same
Murray CountyPOWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES$57.14 $38.09 same
Johnston CountyPOWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES$57.14 $38.09 same
Seminole CountyPOWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES$57.14 $38.09 same
Hughes CountyPOWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES$57.14 $38.09 same
Garvin CountyPOWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES$57.14 $38.09 same

Oklahoma operating engineer prevailing wage by county, with a map

More from DOL on this rate

All Pontotoc County prevailing wage rates

Are you being paid this rate?

Add your base pay to the fringe your employer pays for you, in cash or into plans, and compare the sum with the total. The Department of Labor's Wage and Hour Division takes complaints: 1-866-487-9243, or dol.gov/agencies/whd/contact/complaints.

Source

U.S. Department of Labor, Wage and Hour Division (DOL), wage determination OK20260071 Mod 1, published May 18, 2026: sam.gov/wage-determination/OK20260071/1

We read every active Oklahoma Davis-Bacon wage determination from SAM.gov's own data and check every number with a second, independent read of the same file. DOL prints no total; ours is base plus fringe. How we check · Download Pontotoc County as CSV · Report an error