Home / Texas / Carpenter / Kaufman County group
Texas · Carpenter · 2 counties
Carpenter prevailing wage, Kaufman County group, Texas (2 counties)
DOL sets the same carpenter rates, row for row, in 2 counties: Kaufman and Rockwall. Every figure on this page applies in each of them.
$16.62an hour, base wage + fringe benefits (our sum)
$16.62 base wage + $0.00 fringe benefits
CARPENTER, EXCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION · SUTX2014-061
$10.90an hour, base wage + fringe benefits (our sum)
$10.90 base wage + $0.00 fringe benefits
FORM SETTER · SUTX1992-005
$20.89an hour, base wage + fringe benefits (our sum)
$20.89 base wage + $0.00 fringe benefits
FORM SETTER, PAVING & CURB · SATX2025-007
$9.58an hour, base wage + fringe benefits (our sum)
$9.58 base wage + $0.00 fringe benefits
FORM SETTER · SUTX1990-038
On federally funded or assisted building construction in each of these 2 counties, a carpenter must be paid at least $16.62 an hour: a $16.62 base wage plus $0.00 in fringe benefits, under wage determination TX20260281 (modification 1). DOL prints no total, so $16.62 is our sum of the two.
Wage determination TX20260281, modification 1, published May 18, 2026, for building construction; rate identifier SUTX2014-061 (July 21, 2014). Checked against sam.gov on October 25, 2026.
On federally funded or assisted residential construction in each of these 2 counties, a carpenter must be paid at least $10.90 an hour: a $10.90 base wage plus $0.00 in fringe benefits, under wage determination TX20260014 (modification 1). DOL prints no total, so $10.90 is our sum of the two.
Wage determination TX20260014, modification 1, published May 18, 2026, for residential construction; rate identifier SUTX1992-005 (May 14, 1992). Checked against sam.gov on October 25, 2026.
On federally funded or assisted highway construction in each of these 2 counties, a carpenter must be paid at least $20.89 an hour: a $20.89 base wage plus $0.00 in fringe benefits, under wage determination TX20260294 (modification 1). DOL prints no total, so $20.89 is our sum of the two.
Wage determination TX20260294, modification 1, published May 18, 2026, for highway construction; rate identifier SATX2025-007 (November 15, 2023). Checked against sam.gov on October 25, 2026.
On federally funded or assisted heavy construction in each of these 2 counties, a carpenter must be paid at least $9.58 an hour: a $9.58 base wage plus $0.00 in fringe benefits, under wage determination TX20260020 (modification 1). DOL prints no total, so $9.58 is our sum of the two.
Wage determination TX20260020, modification 1, published May 18, 2026, for heavy construction; rate identifier SUTX1990-038 (August 1, 1990). Checked against sam.gov on October 25, 2026.
Texas public bodies set their own rates, often the Davis-Bacon ones; check the bid documents. Under Gov't Code 2258.022 each body either surveys local wages or adopts the Davis-Bacon rates, and no state agency publishes a schedule.
DOL lists 9 carpenter rates for each of these counties, from $8.04 to $22.50 an hour. See all of them.
Base wage and fringe benefits: $16.62 + $0.00
The base wage is the taxable hourly wage. DOL prints the fringe benefits as one hourly figure, not itemized; it can go to health, pension, vacation and training plans, or be paid as cash where the state allows.
| Base wage (taxable) | $16.62 |
| Base + fringe benefits (our sum; DOL prints no total) | $16.62 |
Base wage and fringe benefits: $10.90 + $0.00
The base wage is the taxable hourly wage. DOL prints the fringe benefits as one hourly figure, not itemized; it can go to health, pension, vacation and training plans, or be paid as cash where the state allows.
| Base wage (taxable) | $10.90 |
| Base + fringe benefits (our sum; DOL prints no total) | $10.90 |
Base wage and fringe benefits: $20.89 + $0.00
The base wage is the taxable hourly wage. DOL prints the fringe benefits as one hourly figure, not itemized; it can go to health, pension, vacation and training plans, or be paid as cash where the state allows.
| Base wage (taxable) | $20.89 |
| Base + fringe benefits (our sum; DOL prints no total) | $20.89 |
Base wage and fringe benefits: $9.58 + $0.00
The base wage is the taxable hourly wage. DOL prints the fringe benefits as one hourly figure, not itemized; it can go to health, pension, vacation and training plans, or be paid as cash where the state allows.
| Base wage (taxable) | $9.58 |
| Base + fringe benefits (our sum; DOL prints no total) | $9.58 |
When does this rate change?
- A contract keeps the wage determination in its bid documents. Modifications published before bid opening apply to it, though one published less than 10 days before can be left out if the agency finds there isn't time to tell bidders (29 CFR 1.6(c)).
- DOL changes a WD by publishing a numbered modification on SAM.gov. This page reads the modification named in the Source line; the Texas change log lists what each one changed.
Every carpenter rate in the Kaufman County group
As DOL lists them. The highlighted row is the one this page leads with.
- FORM BUILDER/SETTER, STRUCTURESHighway · SATX2025-007$22.50
- FORM SETTER, PAVING & CURBHighway · SATX2025-007$20.89
- CARPENTER, EXCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATIONBuilding · SUTX2014-061$16.62
- FORM WORKERBuilding · SUTX2014-061$12.13
- FORM SETTERResidential · SUTX1992-005$10.90
- CARPENTERHeavy · SUTX1990-038$10.54
- FORM SETTERHeavy · SUTX1990-038$9.58
- CARPENTER (EXCLUDING DRYWALL HANGING BATT INSULATION, FORM SETTING)Residential · SUTX1992-005$9.28
- FORM BUILDERHeavy · SUTX1990-038$8.04
| Classification | Base wage | Fringe benefits | Total rate | WD |
|---|---|---|---|---|
| FORM WORKERBuildingSUTX2014-061 | $12.13 | $0.00 | $12.13 | TX20260281 Mod 1 |
| CARPENTER, EXCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATIONBuildingSUTX2014-061 | $16.62 | $0.00 | $16.62 | TX20260281 Mod 1 |
| FORM SETTER, PAVING & CURBHighwaySATX2025-007 | $20.89 | $0.00 | $20.89 | TX20260294 Mod 1 |
| FORM BUILDER/SETTER, STRUCTURESHighwaySATX2025-007 | $22.50 | $0.00 | $22.50 | TX20260294 Mod 1 |
| FORM SETTERHeavySUTX1990-038 | $9.58 | $0.00 | $9.58 | TX20260020 Mod 1 |
| FORM BUILDERHeavySUTX1990-038 | $8.04 | $0.00 | $8.04 | TX20260020 Mod 1 |
| CARPENTERHeavySUTX1990-038 | $10.54 | $0.00 | $10.54 | TX20260020 Mod 1 |
| FORM SETTERResidentialSUTX1992-005 | $10.90 | $0.00 | $10.90 | TX20260014 Mod 1 |
| CARPENTER (EXCLUDING DRYWALL HANGING BATT INSULATION, FORM SETTING)ResidentialSUTX1992-005 | $9.28 | $0.00 | $9.28 | TX20260014 Mod 1 |
How the Kaufman County group compares
The main carpenter rate in every county that has one, and how the pay splits here and nearby. All bars use the same scale.
Every county in Texas
Wage and fringe benefits, nearby
- Kaufman County groupbase $16.62$16.62
- Rockwall Countybase $16.62$16.62
- Van Zandt Countybase $14.30$14.30
- Dallas Countybase $17.13$20.10
Which county is in which carpenter group
Every Texas county with a carpenter rate. Counties DOL treats alike share one page; the rest have their own.
| Counties | Main classification | Base wage | Total rate |
|---|---|---|---|
| Freestone County group, 3 localities: Freestone, Trinity, Tyler | CARPENTER (FORM WORK ONLY) | $33.27 | $43.00 |
| Washington County group, 3 localities: Newton, San Augustine, Washington | CARPENTER (FORM WORK ONLY) | $33.27 | $43.00 |
| Milam County group, 2 localities: Leon, Milam | CARPENTER (FORM WORK ONLY) | $33.27 | $43.00 |
| Anderson County | CARPENTER (FORM WORK ONLY) | $33.27 | $43.00 |
| Angelina County | CARPENTER (FORM WORK ONLY) | $33.27 | $43.00 |
| Austin County | CARPENTER (EXCLUDES ACOUSTICAL CEILING INSTALLATION,DRYWALL HANGING, FORM WORK AND METAL STUD INSTALLATION) | $33.27 | $43.00 |
| Brazoria County | CARPENTER (EXCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION) | $33.27 | $43.00 |
| Chambers County | CARPENTER (EXCLUDES ACOUSTICAL CEILING INSTALLATION,DRYWALL HANGING, FORM WORK AND METAL STUD INSTALLATION) | $33.27 | $43.00 |
| Falls County | CARPENTER (FORM WORK ONLY) | $33.27 | $43.00 |
| Fort Bend County | CARPENTER (EXCLUDES ACOUSTICAL CEILING INSTALLATION,DRYWALL HANGING, FORM WORK AND METAL STUD INSTALLATION) | $33.27 | $43.00 |
| Galveston County | CARPENTER (EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL FINISHING/TAPING, DRYWALL HANGING, FORM WORK AND METAL STUD INSTALLATION) | $33.27 | $43.00 |
| Harris County | CARPENTER (EXCLUDES ACOUSTICAL CEILING INSTALLATION,DRYWALL HANGING, FORM WORK AND METAL STUD INSTALLATION) | $33.27 | $43.00 |
| Houston County | CARPENTER (FORM WORK ONLY) | $33.27 | $43.00 |
| Jasper County | CARPENTER (FORM WORK ONLY) | $33.27 | $43.00 |
| Lee County | CARPENTER (FORM WORK ONLY) | $33.27 | $43.00 |
| Liberty County | CARPENTER (EXCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION) | $33.27 | $43.00 |
| Limestone County | CARPENTER (FORM WORK ONLY) | $33.27 | $43.00 |
| Madison County | CARPENTER (FORM WORK ONLY) | $33.27 | $43.00 |
| Polk County | CARPENTER (FORM WORK ONLY) | $33.27 | $43.00 |
| Sabine County | CARPENTER (FORM WORK ONLY) | $33.27 | $43.00 |
| San Jacinto County | CARPENTER (EXCLUDES ACOUSTICAL CEILING INSTALLATION,DRYWALL HANGING, FORM WORK AND METAL STUD INSTALLATION) | $33.27 | $43.00 |
| Shelby County | CARPENTER (FORM WORK ONLY) | $33.27 | $43.00 |
| Walker County | CARPENTER (FORM WORK ONLY) | $33.27 | $43.00 |
| Waller County | CARPENTER (EXCLUDES ACOUSTICAL CEILING INSTALLATION,DRYWALL HANGING, FORM WORK AND METAL STUD INSTALLATION) | $33.27 | $43.00 |
| Childress County | CARPENTER (CHILDRESS COUNTY) | $29.16 | $38.84 |
| Moore County group, 7 localities: Hall, Hemphill, Lipscomb, Moore, Ochiltree, Oldham, Parmer | CARPENTER | $28.57 | $37.87 |
| Deaf Smith County group, 5 localities: Dallam, Deaf Smith, Donley, Hartley, Swisher | CARPENTER | $28.57 | $37.87 |
| Collingsworth County group, 2 localities: Briscoe, Collingsworth | CARPENTER | $28.57 | $37.87 |
| Hutchinson County group, 2 localities: Hutchinson, Roberts | CARPENTER | $28.57 | $37.87 |
| Lubbock County group, 2 localities: Crosby, Lubbock | CARPENTER | $28.57 | $37.87 |
| Wheeler County group, 2 localities: Sherman, Wheeler | CARPENTER | $28.57 | $37.87 |
| Armstrong County | CARPENTER | $28.57 | $37.87 |
| Carson County | CARPENTER | $28.57 | $37.87 |
| Castro County | CARPENTER (CASTRO COUNTY) | $28.57 | $37.87 |
| Gray County | CARPENTER | $28.57 | $37.87 |
| Hansford County | CARPENTER | $28.57 | $37.87 |
| Potter County | CARPENTER | $28.57 | $37.87 |
| Randall County | CARPENTER | $28.57 | $37.87 |
| Jefferson County | CARPENTER | $17.98 | $21.70 |
| Hardin County | CARPENTER, EXCLUDES FORM WORK | $18.57 | $21.66 |
| Orange County | CARPENTER, EXCLUDES FORM WORK | $18.57 | $21.66 |
| Montgomery County | CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $18.81 | $20.91 |
| Dallas County | CARPENTER, EXCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $17.13 | $20.10 |
| Coryell County group, 2 localities: Coryell, Lampasas | CARPENTER, EXCLUDES DRYWALL HANGING, AND METAL STUD INSTALLATION | $17.54 | $19.34 |
| Denton County | CARPENTER, EXCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $19.25 | $19.25 |
| Bell County | CARPENTER, EXCLUDES DRYWALL HANGING, AND METAL STUD INSTALLATION | $17.28 | $18.99 |
| Johnson County | CARPENTER, EXCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $15.12 | $18.06 |
| Nacogdoches County | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, AND HARDWOOD FLOOR INSTALLATION | $17.50 | $18.03 |
| Starr County group, 5 localities: Starr, Uvalde, Willacy, Zapata, Zavala | CARPENTER | $18.00 | $18.00 |
| La Salle County group, 2 localities: La Salle, McMullen | CARPENTER | $18.00 | $18.00 |
| Maverick County group, 2 localities: Frio, Maverick | CARPENTER | $18.00 | $18.00 |
| Brooks County | CARPENTER | $18.00 | $18.00 |
| Dimmit County | CARPENTER | $18.00 | $18.00 |
| Duval County | CARPENTER | $18.00 | $18.00 |
| Jim Hogg County | CARPENTER | $18.00 | $18.00 |
| Kenedy County | CARPENTER | $18.00 | $18.00 |
| Kinney County | CARPENTER | $18.00 | $18.00 |
| Grimes County | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, AND METAL STUD INSTALLATION (EXCLUDES DRYWALL HANGING, AND FORM WORK) | $15.13 | $17.76 |
| Tarrant County | CARPENTER, EXCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $15.47 | $17.29 |
| Bowie County | CARPENTER | $16.85 | $17.23 |
| Parker County | CARPENTER, EXCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $14.90 | $16.94 |
| El Paso County | CARPENTER, EXCLUDES DRYWALL FINISHING/TAPING, DRYWALL HANGING, FORM WORK AND METAL STUD INSTALLATION | $13.51 | $16.80 |
| Kaufman County group, 2 localities: Kaufman, Rockwall | CARPENTER, EXCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $16.62 | $16.62 |
| Delta County | CARPENTER, EXCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $16.62 | $16.62 |
| Ellis County | CARPENTER, EXCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $16.62 | $16.62 |
| Hunt County | CARPENTER, EXCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $16.62 | $16.62 |
| Webb County | CARPENTER | $14.15 | $16.57 |
| Brewster County | CARPENTER, INCLUDES DRYWALL HANGING (EXCLUDES ACOUSTICAL CEILING INSTALLATION) | $15.00 | $16.55 |
| Hidalgo County | CARPENTER | $14.21 | $16.43 |
| Cameron County | CARPENTER, EXCLUDES DRYWALL HANGING, AND METAL STUD INSTALLATION | $16.00 | $16.00 |
| Williamson County | CARPENTER (FORM WORK ONLY) | $15.93 | $15.98 |
| Grayson County | CARPENTER | $15.81 | $15.81 |
| Val Verde County | CARPENTER, INCLUDES DRYWALL HANGING (EXCLUDES ACOUSTICAL CEILING INSTALLATION) | $15.50 | $15.80 |
| Collin County | CARPENTER, EXCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $15.78 | $15.78 |
| Bastrop County | CARPENTER (FORM WORK ONLY) | $15.62 | $15.67 |
| Caldwell County | CARPENTER (FORM WORK ONLY) | $15.62 | $15.67 |
| Hays County | CARPENTER (FORM WORK ONLY) | $15.62 | $15.67 |
| Travis County | CARPENTER (FORM WORK ONLY) | $15.62 | $15.67 |
| Robertson County | CARPENTER, EXCLUDES FORM WORK | $15.50 | $15.50 |
| Aransas County | CARPENTER | $15.21 | $15.21 |
| Calhoun County | CARPENTER | $15.21 | $15.21 |
| Goliad County | CARPENTER | $15.21 | $15.21 |
| Nueces County | CARPENTER | $15.21 | $15.21 |
| San Patricio County | CARPENTER | $15.21 | $15.21 |
| Victoria County | CARPENTER | $15.21 | $15.21 |
| Burleson County | CARPENTER, EXCLUDES FORM WORK | $15.06 | $15.06 |
| Montague County | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, AND HARDWOOD FLOOR INSTALLATION | $15.00 | $15.00 |
| McLennan County | CARPENTER, EXCLUDES DRYWALL HANGING, AND METAL STUD INSTALLATION | $14.76 | $14.76 |
| Brazos County | CARPENTER, EXCLUDES FORM WORK | $14.56 | $14.56 |
| Henderson County group, 3 localities: Henderson, Hill, Somervell | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, AND HARDWOOD FLOOR INSTALLATION | $14.30 | $14.30 |
| Palo Pinto County group, 2 localities: Palo Pinto, Panola | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, AND HARDWOOD FLOOR INSTALLATION | $14.30 | $14.30 |
| Bosque County | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, AND HARDWOOD FLOOR INSTALLATION | $14.30 | $14.30 |
| Camp County | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, AND HARDWOOD FLOOR INSTALLATION | $14.30 | $14.30 |
| Cass County | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, AND HARDWOOD FLOOR INSTALLATION | $14.30 | $14.30 |
| Cherokee County | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, AND HARDWOOD FLOOR INSTALLATION | $14.30 | $14.30 |
| Cooke County | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, AND HARDWOOD FLOOR INSTALLATION | $14.30 | $14.30 |
| Erath County | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, AND HARDWOOD FLOOR INSTALLATION | $14.30 | $14.30 |
| Franklin County | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, AND HARDWOOD FLOOR INSTALLATION | $14.30 | $14.30 |
| Hamilton County | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, AND HARDWOOD FLOOR INSTALLATION | $14.30 | $14.30 |
| Harrison County | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, AND HARDWOOD FLOOR INSTALLATION | $14.30 | $14.30 |
| Hood County | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, AND HARDWOOD FLOOR INSTALLATION | $14.30 | $14.30 |
| Hopkins County | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, AND HARDWOOD FLOOR INSTALLATION | $14.30 | $14.30 |
| Lamar County | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, AND HARDWOOD FLOOR INSTALLATION | $14.30 | $14.30 |
| Marion County | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, AND HARDWOOD FLOOR INSTALLATION | $14.30 | $14.30 |
| Morris County | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, AND HARDWOOD FLOOR INSTALLATION | $14.30 | $14.30 |
| Navarro County | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, AND HARDWOOD FLOOR INSTALLATION | $14.30 | $14.30 |
| Rains County | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, AND HARDWOOD FLOOR INSTALLATION | $14.30 | $14.30 |
| Red River County | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, AND HARDWOOD FLOOR INSTALLATION | $14.30 | $14.30 |
| Titus County | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, AND HARDWOOD FLOOR INSTALLATION | $14.30 | $14.30 |
| Van Zandt County | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, AND HARDWOOD FLOOR INSTALLATION | $14.30 | $14.30 |
| Wood County | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, AND HARDWOOD FLOOR INSTALLATION | $14.30 | $14.30 |
| Tom Green County group, 2 localities: Irion, Tom Green | CARPENTER, EXCLUDES DRYWALL HANGING, AND METAL STUD INSTALLATION | $13.82 | $13.82 |
| Ector County | CARPENTER | $13.82 | $13.82 |
| Midland County | CARPENTER | $13.82 | $13.82 |
| Medina County group, 2 localities: Atascosa, Medina | CARPENTER (FORM WORK ONLY) | $13.63 | $13.63 |
| Bandera County | CARPENTER (FORM WORK ONLY) | $13.63 | $13.63 |
| Bexar County | CARPENTER (FORM WORK ONLY) | $13.63 | $13.63 |
| Comal County | CARPENTER (FORM WORK ONLY) | $13.63 | $13.63 |
| Gregg County | CARPENTER (FORM WORK ONLY) | $13.63 | $13.63 |
| Guadalupe County | CARPENTER (FORM WORK ONLY) | $13.63 | $13.63 |
| Kendall County | CARPENTER (FORM WORK ONLY) | $13.63 | $13.63 |
| Rusk County | CARPENTER (FORM WORK ONLY) | $13.63 | $13.63 |
| Upshur County | CARPENTER (FORM WORK ONLY) | $13.63 | $13.63 |
| Wilson County | CARPENTER (FORM WORK ONLY) | $13.63 | $13.63 |
| Wichita County | CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, AND FORM WORK | $13.02 | $13.58 |
| Dawson County group, 3 localities: Borden, Crane, Dawson | CARPENTER, INCLUDES DRYWALL HANGING (EXCLUDES ACOUSTICAL CEILING INSTALLATION) | $13.46 | $13.46 |
| Presidio County group, 2 localities: Edwards, Presidio | CARPENTER, INCLUDES DRYWALL HANGING (EXCLUDES ACOUSTICAL CEILING INSTALLATION) | $13.46 | $13.46 |
| Reeves County group, 2 localities: Jeff Davis, Reeves | CARPENTER, INCLUDES DRYWALL HANGING (EXCLUDES ACOUSTICAL CEILING INSTALLATION) | $13.46 | $13.46 |
| Ward County group, 2 localities: Upton, Ward | CARPENTER, INCLUDES DRYWALL HANGING (EXCLUDES ACOUSTICAL CEILING INSTALLATION) | $13.46 | $13.46 |
| Andrews County | CARPENTER, INCLUDES DRYWALL HANGING (EXCLUDES ACOUSTICAL CEILING INSTALLATION) | $13.46 | $13.46 |
| Crockett County | CARPENTER, INCLUDES DRYWALL HANGING (EXCLUDES ACOUSTICAL CEILING INSTALLATION) | $13.46 | $13.46 |
| Culberson County | CARPENTER, INCLUDES DRYWALL HANGING (EXCLUDES ACOUSTICAL CEILING INSTALLATION) | $13.46 | $13.46 |
| Gaines County | CARPENTER, INCLUDES DRYWALL HANGING (EXCLUDES ACOUSTICAL CEILING INSTALLATION) | $13.46 | $13.46 |
| Glasscock County | CARPENTER, INCLUDES DRYWALL HANGING (EXCLUDES ACOUSTICAL CEILING INSTALLATION) | $13.46 | $13.46 |
| Hudspeth County | CARPENTER, INCLUDES DRYWALL HANGING (EXCLUDES ACOUSTICAL CEILING INSTALLATION) | $13.46 | $13.46 |
| Loving County | CARPENTER, INCLUDES DRYWALL HANGING (EXCLUDES ACOUSTICAL CEILING INSTALLATION) | $13.46 | $13.46 |
| Martin County | CARPENTER, INCLUDES DRYWALL HANGING (EXCLUDES ACOUSTICAL CEILING INSTALLATION) | $13.46 | $13.46 |
| Pecos County | CARPENTER, INCLUDES DRYWALL HANGING (EXCLUDES ACOUSTICAL CEILING INSTALLATION) | $13.46 | $13.46 |
| Reagan County | CARPENTER, INCLUDES DRYWALL HANGING (EXCLUDES ACOUSTICAL CEILING INSTALLATION) | $13.46 | $13.46 |
| Sutton County | CARPENTER, INCLUDES DRYWALL HANGING (EXCLUDES ACOUSTICAL CEILING INSTALLATION) | $13.46 | $13.46 |
| Terrell County | CARPENTER, INCLUDES DRYWALL HANGING (EXCLUDES ACOUSTICAL CEILING INSTALLATION) | $13.46 | $13.46 |
| Winkler County | CARPENTER, INCLUDES DRYWALL HANGING (EXCLUDES ACOUSTICAL CEILING INSTALLATION) | $13.46 | $13.46 |
| Fannin County | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, AND HARDWOOD FLOOR INSTALLATION | $13.40 | $13.40 |
| Jones County group, 2 localities: Callahan, Jones | CARPENTER | $12.71 | $13.37 |
| Archer County | CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, AND FORM WORK | $12.71 | $13.37 |
| Clay County | CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, AND FORM WORK | $12.71 | $13.37 |
| Taylor County | CARPENTER | $12.71 | $13.37 |
| Wise County | CARPENTER, EXCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $13.30 | $13.30 |
| Smith County | CARPENTER (FORM WORK ONLY) | $12.48 | $13.29 |
| Wharton County group, 3 localities: Jim Wells, Live Oak, Wharton | CARPENTER | $13.18 | $13.18 |
| Lavaca County group, 2 localities: Karnes, Lavaca | CARPENTER | $13.18 | $13.18 |
| Matagorda County group, 2 localities: Matagorda, Refugio | CARPENTER | $13.18 | $13.18 |
| Bee County | CARPENTER | $13.18 | $13.18 |
| Colorado County | CARPENTER | $13.18 | $13.18 |
| DeWitt County | CARPENTER | $13.18 | $13.18 |
| Fayette County | CARPENTER | $13.18 | $13.18 |
| Gonzales County | CARPENTER | $13.18 | $13.18 |
| Jackson County | CARPENTER | $13.18 | $13.18 |
| Kleberg County | CARPENTER | $13.18 | $13.18 |
| Nolan County group, 4 localities: Menard, Mills, Mitchell, Nolan | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND METAL STUD INSTALLATION | $13.13 | $13.13 |
| Comanche County group, 3 localities: Coleman, Comanche, Concho | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND METAL STUD INSTALLATION | $13.13 | $13.13 |
| San Saba County group, 3 localities: San Saba, Schleicher, Sterling | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND METAL STUD INSTALLATION | $13.13 | $13.13 |
| Llano County group, 2 localities: Llano, Mason | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND METAL STUD INSTALLATION | $13.13 | $13.13 |
| Runnels County group, 2 localities: McCulloch, Runnels | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND METAL STUD INSTALLATION | $13.13 | $13.13 |
| Blanco County | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND METAL STUD INSTALLATION | $13.13 | $13.13 |
| Brown County | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND METAL STUD INSTALLATION | $13.13 | $13.13 |
| Burnet County | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND METAL STUD INSTALLATION | $13.13 | $13.13 |
| Coke County | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND METAL STUD INSTALLATION | $13.13 | $13.13 |
| Fisher County | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND METAL STUD INSTALLATION | $13.13 | $13.13 |
| Gillespie County | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND METAL STUD INSTALLATION | $13.13 | $13.13 |
| Kerr County | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND METAL STUD INSTALLATION | $13.13 | $13.13 |
| Kimble County | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND METAL STUD INSTALLATION | $13.13 | $13.13 |
| Real County | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND METAL STUD INSTALLATION | $13.13 | $13.13 |
| Scurry County | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND METAL STUD INSTALLATION | $13.13 | $13.13 |
| Shackelford County | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND METAL STUD INSTALLATION | $13.13 | $13.13 |
| Stephens County | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND METAL STUD INSTALLATION | $13.13 | $13.13 |
| Hockley County group, 8 localities: Baylor, Cottle, Dickens, Hockley, Knox, Stonewall, Wilbarger, Yoakum | CARPENTER | $13.00 | $13.00 |
| Haskell County group, 4 localities: Haskell, Kent, King, Motley | CARPENTER | $13.00 | $13.00 |
| Lynn County group, 3 localities: Foard, Garza, Lynn | CARPENTER | $13.00 | $13.00 |
| Bailey County | CARPENTER | $13.00 | $13.00 |
| Cochran County | CARPENTER | $13.00 | $13.00 |
| Eastland County | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND METAL STUD INSTALLATION | $13.00 | $13.00 |
| Floyd County | CARPENTER | $13.00 | $13.00 |
| Hale County | CARPENTER | $13.00 | $13.00 |
| Hardeman County | CARPENTER | $13.00 | $13.00 |
| Jack County | CARPENTER | $13.00 | $13.00 |
| Lamb County | CARPENTER | $13.00 | $13.00 |
| Terry County | CARPENTER | $13.00 | $13.00 |
| Throckmorton County | CARPENTER | $13.00 | $13.00 |
| Young County | CARPENTER | $13.00 | $13.00 |
| Howard County | CARPENTER, INCLUDES DRYWALL HANGING (EXCLUDES ACOUSTICAL CEILING INSTALLATION) | $12.42 | $12.42 |
34 groups of counties with identical DOL rates, and 157 counties with rates of their own.
More from DOL on this rate
- SAM.gov wage determinations
- Davis-Bacon determinations list journeyworker rates. Apprentices in a program registered with DOL or a recognized state agency can be paid the program's percentage of the rate, within its ratio; anyone else gets the full rate (29 CFR 5.5(a)(4)).
Are you being paid this rate?
Add your base pay to the fringe your employer pays for you, in cash or into plans, and compare the sum with the total. The Department of Labor's Wage and Hour Division takes complaints: 1-866-487-9243, or dol.gov/agencies/whd/contact/complaints.
Source
U.S. Department of Labor, Wage and Hour Division (DOL), Davis-Bacon wage determinations on SAM.gov, as of October 25, 2026. For the row this page leads with:
- Kaufman: TX20260281 Mod 1
- Rockwall: TX20260281 Mod 1
We read every active Texas Davis-Bacon wage determination from SAM.gov's own data and check every number with a second, independent read of the same file. DOL prints no total; ours is base plus fringe. The Texas A&M University System, City of Houston and City of Austin rows are copied from those bodies' own schedules, with their source on each row. How we check · Download every Texas rate as CSV · Report an error