Skip to content

Home / Utah / Tooele County / Operating Engineer

Tooele County, UT · Operating Engineer

Operating Engineer prevailing wage in Tooele County, Utah

$14.48an hour, base + fringe

$14.48 wage + $0.00 fringe benefits · Building · SUUT2012-018

On federally funded or assisted building construction in Tooele County, an operating engineer must be paid at least $14.48 an hour: a $14.48 base wage plus $0.00 in fringe benefits, under wage determination UT20260086 (modification 1). DOL prints no total, so $14.48 is our sum of the two.

Wage determination UT20260086, modification 1, published May 18, 2026, for building construction; rate identifier SUUT2012-018 (July 29, 2014). Checked against sam.gov on October 25, 2026.

Davis-Bacon is the only prevailing wage here (federally funded or assisted work). Utah repealed its law in 1981 (DOL state table).

DOL lists 28 operating engineer rates for Tooele County, from $14.48 to $49.63 an hour. See all of them.

Base wage and fringe benefits: $14.48 + $0.00

The base wage is the taxable hourly wage. DOL prints the fringe benefits as one hourly figure, not itemized; it can go to health, pension, vacation and training plans, or be paid as cash where the state allows.

Base wage (taxable)$14.48
Base + fringe benefits (our sum; DOL prints no total)$14.48

When this rate changes

Every operating engineer rate in Tooele County

As DOL lists them. The highlighted row is the one this page leads with.

ClassificationBase + fringeBaseFringe benefitsWD
OPERATOR: LOADERBuildingSUUT2012-018$19.34 $19.34 $0.00 UT20260086 Mod 1
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOEBuildingSUUT2012-018$14.48 $14.48 $0.00 UT20260086 Mod 1
POWER EQUIPMENT OPERATOR (OILER)HighwayENGI0003-021$49.63 $31.99 $17.64 UT20260112 Mod 1
OPERATOR: SCREEDHighwaySUUT2019-024$38.06 $22.41 $15.65 UT20260112 Mod 1
OPERATOR: ROLLERHighwaySUUT2019-024$41.50 $25.85 $15.65 UT20260112 Mod 1
OPERATOR: PUMPHighwaySUUT2019-024$23.41 $19.18 $4.23 UT20260112 Mod 1
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)HighwaySUUT2019-024$40.02 $24.37 $15.65 UT20260112 Mod 1
OPERATOR: MECHANICHighwaySUUT2019-024$43.20 $27.55 $15.65 UT20260112 Mod 1
OPERATOR: LOADERHighwaySUUT2019-024$41.02 $25.37 $15.65 UT20260112 Mod 1
OPERATOR: GRADER/BLADEHighwaySUUT2019-024$43.05 $27.40 $15.65 UT20260112 Mod 1
OPERATOR: DRILLHighwaySUUT2019-024$43.09 $27.44 $15.65 UT20260112 Mod 1
OPERATOR: CRANEHighwaySUUT2019-024$41.27 $30.66 $10.61 UT20260112 Mod 1
OPERATOR: CONCRETE FINISHING MACHINEHighwaySUUT2019-024$25.31 $18.76 $6.55 UT20260112 Mod 1
OPERATOR: BROOM/SWEEPERHighwaySUUT2019-024$29.11 $22.56 $6.55 UT20260112 Mod 1
OPERATOR: BOBCAT/SKID STEER/SKID LOADERHighwaySUUT2019-024$23.62 $20.31 $3.31 UT20260112 Mod 1
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOEHighwaySUUT2019-024$28.76 $21.95 $6.81 UT20260112 Mod 1
POWER EQUIPMENT OPERATOR (MECHANIC)HeavyENGI0003-034$49.13 $33.04 $16.09 UT20260097 Mod 1
POWER EQUIPMENT OPERATOR: LOADERHeavyENGI0003-035$49.63 $31.99 $17.64 UT20260097 Mod 1
OPERATOR: BOBCAT/SKID STEER/SKID LOADERHeavySUUT2018-008$25.29 $25.29 $0.00 UT20260097 Mod 1
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOEHeavySUUT2018-008$40.36 $23.40 $16.96 UT20260097 Mod 1
OPERATOR: POWER EQUIPMENT: (7) ROLLER (DIRT AND GRADE COMPACTION)ResidentialENGI0003-052$37.15 $21.50 $15.65 UT20260036 Mod 1
OPERATOR: POWER EQUIPMENT: (5) ASPHALT ROLLER, FRONT END LOADER (UNDER 2 CU. YDS.)ResidentialENGI0003-052$39.02 $23.37 $15.65 UT20260036 Mod 1
OPERATOR: POWER EQUIPMENT: (4) ASPHALT PAVER, BACKHOE LOADER COMBO, BULLDOZER, FRONT END LOADER (2 TO 5 CU. YDS.), OIL DISTRIBUTORResidentialENGI0003-052$40.02 $24.37 $15.65 UT20260036 Mod 1
OPERATOR: POWER EQUIPMENT: (3) BACKHOE/EXCAVATOR, FRONT END LOADER (OVER 5 CU. YDS. )ResidentialENGI0003-052$41.02 $25.37 $15.65 UT20260036 Mod 1
OPERATOR: POWER EQUIPMENT: (2A) BLADE/GRADERResidentialENGI0003-052$41.54 $25.89 $15.65 UT20260036 Mod 1
OPERATOR: POWER EQUIPMENT: (1) MECHANICResidentialENGI0003-052$43.20 $27.55 $15.65 UT20260036 Mod 1
OPERATOR: POWER EQUIPMENT (6) SCREEDResidentialENGI0003-052$38.06 $22.41 $15.65 UT20260036 Mod 1
OPERATOR: TRACKHOEResidentialSUUT2008-051$14.89 $14.89 $0.00 UT20260036 Mod 1

How Tooele County compares

The main operating engineer rate in every county that has one, and how the pay splits here and nearby. All bars use the same scale.

Every county in Utah

$14.48Salt Lake$17.38Beaver
TooeleNearby: Juab $16.92, Salt Lake $14.48, Davis $16.92Each column is a group of counties with about the same main rate; its height is how many. 27 counties pay more than Tooele, 1 the same, 0 less.

Wage and fringe benefits, nearby

  1. Tooele Countybase $14.48$14.48
  2. Juab Countybase $16.92$16.92
  3. Salt Lake Countybase $14.48$14.48
  4. Davis Countybase $16.92$16.92

Operating Engineer rates in nearby counties

Current DOL rates. Davis-Bacon rates are set for groups of counties, so neighbours often share them; the county where the work is done decides.

CountyClassificationBase + fringeBasevs Tooele County
Juab CountyOPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$16.92 $16.92 +$2.44
Davis CountyOPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$16.92 $16.92 +$2.44
Box Elder CountyOPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$16.92 $16.92 +$2.44
Utah CountyOPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$16.92 $16.92 +$2.44
Weber CountyOPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$16.92 $16.92 +$2.44
Tooele CountyOPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$14.48 $14.48 
Salt Lake CountyOPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$14.48 $14.48 same

Utah operating engineer prevailing wage by county, with a map

More from DOL on this rate

All Tooele County prevailing wage rates

Are you being paid this rate?

Add your base pay to the fringe your employer pays for you, in cash or into plans, and compare the sum with the total. The Department of Labor's Wage and Hour Division takes complaints: 1-866-487-9243, or dol.gov/agencies/whd/contact/complaints.

Source

U.S. Department of Labor, Wage and Hour Division (DOL), wage determination UT20260086 Mod 1, published May 18, 2026: sam.gov/wage-determination/UT20260086/1

We read every active Utah Davis-Bacon wage determination from SAM.gov's own data and check every number with a second, independent read of the same file. DOL prints no total; ours is base plus fringe. How we check · Download Tooele County as CSV · Report an error