Home / Washington / Yakima County / Operating Engineer
Yakima County · Operating Engineer
Operating Engineer prevailing wage in Yakima County, Washington
$93.00an hour, total
$62.85 wage + $30.15 fringe benefits
Yakima County uses the same operating engineer rates as 8 other counties. See all of them on one page.
On Washington public works in Yakima County, an operating engineer must be paid at least $93.00 an hour in total: $62.85 in wages plus $30.15 in fringe benefits for health, pension, vacation, training and other plans. L&I's rate took effect September 2, 2026.
L&I published this rate on August 3, 2026 and it took effect September 2, 2026. Checked against L&I's wage lookup on October 24, 2026.
L&I lists 206 commercial operating engineer rates for Yakima County, from $86.78 to $95.76 an hour. See all of them.
Base wage and fringe: $62.85 + $30.15
The wage is the taxable hourly rate. The other lines are what Washington law calls "usual benefits": contributions to health, pension, vacation and holiday, apprenticeship and similar plans. A contractor that doesn't provide a benefit pays its value as wages instead (RCW 39.12.010).
| Base wage (taxable) | $62.85 |
| Health and welfare | $10.72 |
| Pension | $16.80 |
| Vacation and holiday | $1.58 |
| Training | $1.05 |
| Total straight-time hourly rate | $93.00 |
Set from: collective bargaining agreement, 2024 – 2027 Agreement Between Independent (MLAWW) Contractors Of Washington and Operating Engineers Local 302. Where a county has a collective bargaining agreement, L&I adopts its wage and benefits; with more than one, the higher rate prevails. Otherwise L&I uses wage surveys (RCW 39.12.015).
Davis-Bacon operating engineer rate in Yakima County
Federally funded or assisted construction here uses the U.S. Department of Labor's wage determinations. When a contract requires both the state rate and the Davis-Bacon rate, paying the higher of the two meets both. The contract documents say which apply.
We don't put a federal figure next to L&I's here, because the federal determinations split this trade into groups that don't line up with L&I's. The federal rows for this trade are below; match the classification to the work.
| Construction | Federal classification | Base + fringe | Base | WD |
|---|---|---|---|---|
| Building | OPERATOR: BULLDOZER: D9 & UNDER (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)ENGI0302-099 | $86.80 | $59.23 | WA20260119 Mod 1 |
| Building | OPERATOR: BLADE FINISH (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)ENGI0302-099 | $87.45 | $59.88 | WA20260119 Mod 1 |
| Building | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)ENGI0302-099 | $88.24 | $60.67 | WA20260119 Mod 1 |
| Building | OPERATOR: GRADER/BLADE (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)ENGI0302-099 | $88.24 | $60.67 | WA20260119 Mod 1 |
| Building | OPERATOR: BULLDOZER: D9 & UNDER (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)ENGI0302-099 | $86.80 | $59.23 | WA20260119 Mod 1 |
| Building | OPERATOR: BLADE FINISH (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)ENGI0302-099 | $87.45 | $59.88 | WA20260119 Mod 1 |
| Building | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)ENGI0302-099 | $88.24 | $60.67 | WA20260119 Mod 1 |
| Building | OPERATOR: GRADER/BLADE (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)ENGI0302-099 | $88.24 | $60.67 | WA20260119 Mod 1 |
| Building | OPERATOR: LOADER: OVERHEAD UNDER 6 YARDS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)ENGI0302-104 | $87.45 | $59.88 | WA20260119 Mod 1 |
| Building | OPERATOR: LOADER: OVERHEAD 6 YARDS BUT NOT INCLUDING 8 YARDS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)ENGI0302-104 | $88.24 | $60.67 | WA20260119 Mod 1 |
| Building | OPERATOR: ROLLERSUWA2018-019 | $54.83 | $42.04 | WA20260119 Mod 1 |
| Building | OPERATOR: OILERSUWA2018-019 | $53.01 | $36.39 | WA20260119 Mod 1 |
| Building | OPERATOR: MECHANICSUWA2018-019 | $56.68 | $40.77 | WA20260119 Mod 1 |
| Building | OPERATOR: BOBCAT/SKID STEER/SKID LOADERSUWA2018-019 | $50.09 | $40.53 | WA20260119 Mod 1 |
| Building | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOESUWA2018-019 | $44.78 | $37.76 | WA20260119 Mod 1 |
| Building | OPERATOR: DRILLUAVGWA0002 | $77.57 | $56.42 | WA20260119 Mod 1 |
| Building | OPERATOR: CRANEUAVGWA0004 | $70.92 | $53.35 | WA20260119 Mod 1 |
| Highway | POWER EQUIPMENT OPERATOR: GROUP 1A- CRANES: 100 TONS THROUGH 199 TONS, OR 150'?OF BOOM (INCLUDING JIB WITH ATTACHMENTS); DRILLING MACHINE; OVERHEAD, BRIDGE …ENGI0302-095 | $89.13 | $61.56 | WA20260001 Mod 4 |
| Highway | POWER EQUIPMENT OPERATOR: GROUP 1AA- CRANES: 200 TONS- 299 TONS, OR 250' OF BOOM (INCLUDING JIB WITH ATTACHMENTS); CRANES: FRICTION CRANES THROUGH 199 TONS; …ENGI0302-095 | $90.04 | $62.47 | WA20260001 Mod 4 |
| Highway | POWER EQUIPMENT OPERATOR: GROUP 1AAA- CRANES: 300 TONS AND OVER OR 300'?OF BOOM (INCLUDING JIB WITH ATTACHMENTS); CRANES FRICTION: 200 TONS AND OVER; TOWER …ENGI0302-095 | $90.92 | $63.35 | WA20260001 Mod 4 |
| Highway | POWER EQUIPMENT OPERATOR: GROUP 2- BATCH PLANT OPERATOR: CONCRETE; BARRIER MACHINE: (ZIPPER); BUMP CUTTER; CRANES: 20 TONS THROUGH 44 TONS WITH ATTACHMENTS; …ENGI0302-095 | $87.45 | $59.88 | WA20260001 Mod 4 |
| Highway | POWER EQUIPMENT OPERATOR: GROUP 4- ASSISTANT ENGINEER; BOBCAT; BROOMS; COMPRESSOR; CONCRETE FINISH MACHINE: LASER SCREED; CRANES, A-FRAME: 10 TONS AND UNDER; …ENGI0302-095 | $83.00 | $55.43 | WA20260001 Mod 4 |
| Highway | POWER EQUIPMENT OPERATOR: GROUP 6- ASPHALT PLANT OPERATOR; AUTOMATIC SUBGRADER (DITCHES & TRIMMERS)(AUTOGRADE, ABC, R.A. HANSEN & SIMILAR ON GRADE WIRE); …ENGI0302-125 | $66.45 | $43.05 | WA20260001 Mod 4 |
| Highway | POWER EQUIPMENT OPERATOR: GROUP 7- BACKHOE (OVER 110,000 GW); BACKHOES & HOE RAM (3 YDS & OVER); BLADE (FINISH & BLUETOP) AUTOMATIC, CMI, ABC, FINISH ATHEY & …ENGI0302-125 | $66.79 | $43.39 | WA20260001 Mod 4 |
| Highway | POWER EQUIPMENT OPERATOR: GROUP 8- CRANES (85 TONS AND OVER, AND ALL CLIMBING, OVERHEAD,RAIL AND TOWER), ALL ATTACHMENTS INCLUDING CLAMSHELL, DRAGLINE; LOADERS …ENGI0302-125 | $68.76 | $45.36 | WA20260001 Mod 4 |
| Highway | POWER EQUIPMENT OPERATOR: GROUP 1A- CRANES, 100 TONS THRU 199 TONS, OR 250 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); TOWER CRANE OVER 175 FT IN HEIGHT, BASE …ENGI0612-001 | $89.64 | $62.32 | WA20260001 Mod 4 |
| Highway | POWER EQUIPMENT OPERATOR: GROUP 1AA- CRANES- 200 TONS TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS; TOWER CRANE OVER 175 FT IN HEIGHT, BASE …ENGI0612-001 | $90.54 | $63.22 | WA20260001 Mod 4 |
| Highway | POWER EQUIPMENT OPERATOR: GROUP 1AAA- CRANES-OVER 300 TONS OR 300 FT OF BOOM (INCLUDING JIB WITH ATTACHMENT). (ON THE FOLLOWING PROJECTS, THE RATE FOR EACH …ENGI0612-001 | $91.43 | $64.11 | WA20260001 Mod 4 |
| Highway | POWER EQUIPMENT OPERATOR: GROUP 1- CABLEWAY; CRANES 45 TONS THRU 99 TONS UNDER 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); CRANE-OVERHEAD, BRIDGE TYPE, 45 …ENGI0612-001 | $88.73 | $61.41 | WA20260001 Mod 4 |
| Highway | POWER EQUIPMENT OPERATOR: GROUP 2- BARRIER MACHINE (ZIPPER); BATCH PLANT OPERATOR-CONCRETE; BUMP CUTTER; CRANES, 20 TONS THRU 44 TONS WITH ATTACHMENTS; …ENGI0612-001 | $87.95 | $60.63 | WA20260001 Mod 4 |
| Highway | POWER EQUIPMENT OPERATOR: GROUP 4- ASSISTANT ENGINEER; BOBCAT; BROOMS; COMPRESSOR; CONCRETE FINISH MACHINE-LASER SCREED; CRANES A-FRAME 10 TONS AND UNDER; …ENGI0612-001 | $83.47 | $56.15 | WA20260001 Mod 4 |
| Highway | POWER EQUIPMENT OPERATOR: GROUP 1A- CRANES, 100 TONS THRU 199 TONS, OR 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); CRANE-OVERHEAD, BRIDGE TYPE, 100 TONS …ENGI0612-008 | $88.54 | $61.22 | WA20260001 Mod 4 |
| Highway | POWER EQUIPMENT OPERATOR: GROUP 1AA- CRANES- 200 TONS TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); TOWER CRANE OVER 175 FT IN HEIGHT, BASE …ENGI0612-008 | $89.44 | $62.12 | WA20260001 Mod 4 |
| Highway | POWER EQUIPMENT OPERATOR: GROUP 1AAA- CRANES-OVER 300 TONS OR 300 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS). (ON THE FOLLOWING PROJECTS, THE RATE FOR EACH …ENGI0612-008 | $90.31 | $62.99 | WA20260001 Mod 4 |
| Highway | POWER EQUIPMENT OPERATOR: GROUP 1- CABLEWAY; CRANES 45 TONS THRU 99 TONS UNDER 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); CRANE-OVERHEAD, VRIDGE TYPE, 45 …ENGI0612-008 | $87.64 | $60.32 | WA20260001 Mod 4 |
| Highway | POWER EQUIPMENT OPERATOR: GROUP 2- BARRIER MACHINE (ZIPPER); BATCH PLANT OPERATOR-CONCRETE; BUMP CUTTER; CRANES, 20 TONS THRU 44 TONS WITH ATTACHMENTS; …ENGI0612-008 | $86.88 | $59.56 | WA20260001 Mod 4 |
| Highway | POWER EQUIPMENT OPERATOR: GROUP 4- ASSISTANT ENGINEER; BOBCAT; BROOMS; COMPRESSOR; CONCRETE FINISH MACHINE-LASER SCREED; CRANES A-FRAME 10 TONS AND UNDER; …ENGI0612-008 | $82.45 | $55.13 | WA20260001 Mod 4 |
| Highway | POWER EQUIPMENT OPERATOR: GROUP 1A- CRANES, 100 TONS THRU 199 TONS, OR 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); CRANE-OVERHEAD, BRIDGE TYPE, 100 TONS …ENGI0612-012 | $89.13 | $61.81 | WA20260001 Mod 4 |
| Highway | POWER EQUIPMENT OPERATOR: GROUP 1AA- CRANES- 200 TONS TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); TOWER CRANE OVER 175 FT IN HEIGHT, BASE …ENGI0612-012 | $90.03 | $62.71 | WA20260001 Mod 4 |
| Highway | POWER EQUIPMENT OPERATOR: GROUP 1AAA- CRANES-OVER 300 TONS OR 300 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS). (ON THE FOLLOWING PROJECTS, THE RATE FOR EACH …ENGI0612-012 | $90.91 | $63.59 | WA20260001 Mod 4 |
The first 40 of 83 federal rows; every row is in the determinations linked above.
Davis-Bacon rates from SAM.gov, read October 25, 2026. Our federal totals are base plus fringe; DOL prints no total. Washington Davis-Bacon changes
Holidays
L&I holiday code 15J:
Holidays: New Year's Day, Martin Luther King Jr. Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day, and Christmas Day (9). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. If any of the listed holidays falls on a Saturday, the preceding Friday shall be a regular work day.
When this rate changes
- Rates lock at the bid date. A project uses “the rates that are in effect on the date when bids by prime contractors are due”, and they stay for the life of the contract. If the contract isn't awarded within six months of the bid date, the award-date rates apply. Contracts without bids use the date they're signed (WAC 296-127-011).
- L&I publishes on the first business day of February and August, and rates take effect 30 days later. Corrections can be published at any time and also take effect 30 days later (WAC 296-127-011(1); L&I publications and corrections). L&I's next set is due February 1, 2027, effective March 3, 2027.
- L&I doesn't republish every rate each period. A rate stays until L&I changes it, so each one has its own date. This one was published August 3, 2026 and took effect September 2, 2026.
Every operating engineer rate in Yakima County
As L&I lists them. The highlighted row is the one this page leads with.
| Classification | Total | Base | Fringes | Effective |
|---|---|---|---|---|
| Asphalt Plant Operators | $93.85 | $63.68 | $30.17 | Sep 2, 2026 |
| Assistant Engineer | $88.21 | $58.18 | $30.03 | Sep 2, 2026 |
| Barrier Machine (zipper) | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Batch Plant Operator: concrete | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Power Equipment Operators Crane: Boat Operator | $92.28 | $63.71 | $28.57 | Sep 2, 2026 |
| Bobcat | $88.21 | $58.18 | $30.03 | Sep 2, 2026 |
| Brokk - Remote Demolition Equipment | $88.21 | $58.18 | $30.03 | Sep 2, 2026 |
| Brooms | $88.21 | $58.18 | $30.03 | Sep 2, 2026 |
| Bump Cutter | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Cableways | $93.85 | $63.68 | $30.17 | Sep 2, 2026 |
| Chipper | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Compressor | $88.21 | $58.18 | $30.03 | Sep 2, 2026 |
| Concrete Finish Machine - Laser Screed | $88.21 | $58.18 | $30.03 | Sep 2, 2026 |
| Concrete Pump - Mounted Or Trailer High Pressure Line Pump, Pump High Pressure | $92.29 | $62.16 | $30.13 | Sep 2, 2026 |
| Concrete Pump: Truck Mount With Boom Attachment Over 42 M | $93.85 | $63.68 | $30.17 | Sep 2, 2026 |
| Concrete Pump: Truck Mount With Boom Attachment Up To 42m | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Conveyors | $92.29 | $62.16 | $30.13 | Sep 2, 2026 |
| Power Equipment Operators Crane: Cranes Friction: 200 tons and over | $95.09 | $66.52 | $28.57 | Sep 2, 2026 |
| Power Equipment Operators Crane: Cranes, A-frame: 10 tons and under | $86.78 | $58.21 | $28.57 | Sep 2, 2026 |
| Power Equipment Operators Crane: Cranes: 100 tons through 199 tons, or 150' of boom (including jib with attachments) | $93.21 | $64.64 | $28.57 | Sep 2, 2026 |
| Power Equipment Operators Crane: Cranes: 20 tons through 44 tons with attachments | $91.46 | $62.89 | $28.57 | Sep 2, 2026 |
| Power Equipment Operators Crane: Cranes: 200 tons- 299 tons, or 250' of boom including jib with attachments | $94.16 | $65.59 | $28.57 | Sep 2, 2026 |
| Power Equipment Operators Crane: Cranes: 300 tons and over or 300' of boom including jib with attachments | $95.09 | $66.52 | $28.57 | Sep 2, 2026 |
| Power Equipment Operators Crane: Cranes: 45 tons through 99 tons, under 150' of boom(including jib with attachments) | $92.28 | $63.71 | $28.57 | Sep 2, 2026 |
| Power Equipment Operators Crane: Cranes: Friction cranes through 199 tons | $94.16 | $65.59 | $28.57 | Sep 2, 2026 |
| Power Equipment Operators Crane: Cranes: through 19 tons with attachments, a-frame over 10 tons | $90.76 | $62.19 | $28.57 | Sep 2, 2026 |
| Crusher | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Deck Engineer/Deck Winches (power) | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Power Equipment Operators Crane: Derricks, On Building Work | $92.28 | $63.71 | $28.57 | Sep 2, 2026 |
| Dozers D-9 & Under | $92.29 | $62.16 | $30.13 | Sep 2, 2026 |
| Drill Oilers: Auger Type, Truck Or Crane Mount | $92.29 | $62.16 | $30.13 | Sep 2, 2026 |
| Drilling Machine | $94.79 | $64.60 | $30.19 | Sep 2, 2026 |
| Elevator and man-lift: permanent and shaft type | $88.21 | $58.18 | $30.03 | Sep 2, 2026 |
| Finishing Machine, Bidwell And Gamaco & Similar Equipment | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Forklift: 3000 lbs and over with attachments | $92.29 | $62.16 | $30.13 | Sep 2, 2026 |
| Forklifts: under 3000 lbs. with attachments | $88.21 | $58.18 | $30.03 | Sep 2, 2026 |
| Grade Engineer: Using Blue Prints, Cut Sheets, Etc | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Gradechecker/Stakeman | $88.21 | $58.18 | $30.03 | Sep 2, 2026 |
| Guardrail Punch | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Hard Tail End Dump Articulating Off- Road Equipment 45 Yards. & Over | $93.85 | $63.68 | $30.17 | Sep 2, 2026 |
| Hard Tail End Dump Articulating Off-road Equipment Under 45 Yards | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Horizontal/Directional Drill Locator | $92.29 | $62.16 | $30.13 | Sep 2, 2026 |
| Horizontal/Directional Drill Operator | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Power Equipment Operators Crane: Hydralifts/Boom Trucks Over 10 Tons | $90.76 | $62.19 | $28.57 | Sep 2, 2026 |
| Power Equipment Operators Crane: Hydralifts/boom trucks: 10 tons and under | $86.78 | $58.21 | $28.57 | Sep 2, 2026 |
| Leverman | $95.76 | $65.55 | $30.21 | Sep 2, 2026 |
| Loader, Overhead, 6 Yards. But Not Including 8 Yards | $93.85 | $63.68 | $30.17 | Sep 2, 2026 |
| Loader: Overhead 8 yards and over | $94.79 | $64.60 | $30.19 | Sep 2, 2026 |
| Loaders, Overhead Under 6 Yards | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Loaders, Plant Feed | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Loaders: Elevating Type Belt | $92.29 | $62.16 | $30.13 | Sep 2, 2026 |
| Locomotives, All | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Material Transfer Device | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Mechanics: All (Leadmen - $0.50 per hour over mechanic) | $94.79 | $64.60 | $30.19 | Sep 2, 2026 |
| Motor Patrol Graders | $93.85 | $63.68 | $30.17 | Sep 2, 2026 |
| Mucking Machine, Mole, Tunnel Drill, Boring, Road Header And/or Shield | $93.85 | $63.68 | $30.17 | Sep 2, 2026 |
| Oil Distributors, Blower Distribution & Mulch Seeding Operator | $88.21 | $58.18 | $30.03 | Sep 2, 2026 |
| Outside Hoists (Elevators and Manlifts), Air Tuggers, Strato | $92.29 | $62.16 | $30.13 | Sep 2, 2026 |
| Power Equipment Operators Crane: Overhead, bridge type Crane: 20 tons through 44 tons | $91.46 | $62.89 | $28.57 | Sep 2, 2026 |
| Power Equipment Operators Crane: Overhead, bridge type: 100 tons and over | $93.21 | $64.64 | $28.57 | Sep 2, 2026 |
| Power Equipment Operators Crane: Overhead, bridge type: 45 tons through 99 tons | $92.28 | $63.71 | $28.57 | Sep 2, 2026 |
| Pavement Breaker | $88.21 | $58.18 | $30.03 | Sep 2, 2026 |
| Pile Driver (other Than Crane Mount) | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Plant Oiler - Asphalt, Crusher | $92.29 | $62.16 | $30.13 | Sep 2, 2026 |
| Posthole Digger, Mechanical | $88.21 | $58.18 | $30.03 | Sep 2, 2026 |
| Power Plant | $88.21 | $58.18 | $30.03 | Sep 2, 2026 |
| Pumps - Water | $88.21 | $58.18 | $30.03 | Sep 2, 2026 |
| Quad 9, Hd 41, D10 And Over | $93.85 | $63.68 | $30.17 | Sep 2, 2026 |
| Power Equipment Operators Crane: Quick tower: no cab, under 100 feet in height base to boom | $90.76 | $62.19 | $28.57 | Sep 2, 2026 |
| Remote Control Operator On Rubber Tired Earth Moving Equipment | $93.85 | $63.68 | $30.17 | Sep 2, 2026 |
| Power Equipment Operators Crane: Rigger and Bellman | $86.78 | $58.21 | $28.57 | Sep 2, 2026 |
| Power Equipment Operators Crane: Rigger/Signal Person, Bellman(Certified) | $90.76 | $62.19 | $28.57 | Sep 2, 2026 |
| Rollagon | $93.85 | $63.68 | $30.17 | Sep 2, 2026 |
| Roller, Other Than Plant Mix | $88.21 | $58.18 | $30.03 | Sep 2, 2026 |
| Roller, Plant Mix Or Multi-lift Materials | $92.29 | $62.16 | $30.13 | Sep 2, 2026 |
| Roto-mill, Roto-grinder | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Saws - Concrete | $92.29 | $62.16 | $30.13 | Sep 2, 2026 |
| Scraper, Self Propelled Under 45 Yards | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Scrapers - Concrete & Carry All | $92.29 | $62.16 | $30.13 | Sep 2, 2026 |
| Scrapers, Self-propelled: 45 Yards And Over | $93.85 | $63.68 | $30.17 | Sep 2, 2026 |
| Service Engineers: Equipment | $92.29 | $62.16 | $30.13 | Sep 2, 2026 |
| Shotcrete/Gunite Equipment | $88.21 | $58.18 | $30.03 | Sep 2, 2026 |
| Shovel, Excavator, Backhoe, Tractors Under 15 Metric Tons | $92.29 | $62.16 | $30.13 | Sep 2, 2026 |
| Shovel, Excavator, Backhoe: Over 30 Metric Tons To 50 Metric Tons | $93.85 | $63.68 | $30.17 | Sep 2, 2026 |
| Shovel, Excavator, Backhoes, Tractors: 15 To 30 Metric Tons | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Shovel, Excavator, Backhoes: Over 50 Metric Tons To 90 Metric Tons | $94.79 | $64.60 | $30.19 | Sep 2, 2026 |
| Shovel, Excavator, Backhoes: Over 90 Metric Tons | $95.76 | $65.55 | $30.21 | Sep 2, 2026 |
| Slipform Pavers | $93.85 | $63.68 | $30.17 | Sep 2, 2026 |
| Spreader, Topsider & Screedman | $93.85 | $63.68 | $30.17 | Sep 2, 2026 |
| Subgrader Trimmer | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Tower Bucket Elevators | $92.29 | $62.16 | $30.13 | Sep 2, 2026 |
| Power Equipment Operators Crane: Tower Crane: over 175' through 250' in height, base to boom | $94.16 | $65.59 | $28.57 | Sep 2, 2026 |
| Power Equipment Operators Crane: Tower crane: up to 175' in height base to boom | $93.21 | $64.64 | $28.57 | Sep 2, 2026 |
| Power Equipment Operators Crane: Tower Cranes: over 250' in height from base to boom | $95.09 | $66.52 | $28.57 | Sep 2, 2026 |
| Transporters, All Track Or Truck Type | $93.85 | $63.68 | $30.17 | Sep 2, 2026 |
| Trenching Machines | $92.29 | $62.16 | $30.13 | Sep 2, 2026 |
| Power Equipment Operators Crane: Truck Crane Oiler/Driver: 100 tons and over | $91.46 | $62.89 | $28.57 | Sep 2, 2026 |
| Power Equipment Operators Crane: Truck crane oiler/driver: under 100 tons | $90.76 | $62.19 | $28.57 | Sep 2, 2026 |
| Truck Mount Portable Conveyor | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Vac Truck (Vactor Guzzler, Hydro Excavator) | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Welder | $93.85 | $63.68 | $30.17 | Sep 2, 2026 |
| Wheel Tractors, Farmall Type | $88.21 | $58.18 | $30.03 | Sep 2, 2026 |
| Yo Yo Pay Dozer | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Asphalt Plant Operators | $93.85 | $63.68 | $30.17 | Sep 2, 2026 |
| Assistant Engineer | $88.21 | $58.18 | $30.03 | Sep 2, 2026 |
| Barrier Machine (zipper) | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Batch Plant Operator, Concrete | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Power Equipment Operators- Underground Sewer & Water Cranes: Boat Operator | $92.28 | $63.71 | $28.57 | Sep 2, 2026 |
| Bobcat | $88.21 | $58.18 | $30.03 | Sep 2, 2026 |
| Brokk - Remote Demolition Equipment | $88.21 | $58.18 | $30.03 | Sep 2, 2026 |
| Brooms | $88.21 | $58.18 | $30.03 | Sep 2, 2026 |
| Bump Cutter | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Cableways | $93.85 | $63.68 | $30.17 | Sep 2, 2026 |
| Chipper | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Compressor | $88.21 | $58.18 | $30.03 | Sep 2, 2026 |
| Concrete Finish Machine - Laser Screed | $88.21 | $58.18 | $30.03 | Sep 2, 2026 |
| Concrete Pump - Mounted Or Trailer High Pressure Line Pump, Pump High Pressure | $92.29 | $62.16 | $30.13 | Sep 2, 2026 |
| Concrete Pump: Truck Mount With Boom Attachment Over 42 M | $93.85 | $63.68 | $30.17 | Sep 2, 2026 |
| Concrete Pump: Truck Mount With Boom Attachment Up To 42m | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Conveyors | $92.29 | $62.16 | $30.13 | Sep 2, 2026 |
| Power Equipment Operators- Underground Sewer & Water Cranes: Cranes Friction: 200 tons and over | $95.09 | $66.52 | $28.57 | Sep 2, 2026 |
| Power Equipment Operators- Underground Sewer & Water Cranes: Cranes, A-frame: 10 tons and under | $86.78 | $58.21 | $28.57 | Sep 2, 2026 |
| Power Equipment Operators- Underground Sewer & Water Cranes: Cranes: 100 tons through 199 tons, or 150' of boom (including jib with attachments) | $93.21 | $64.64 | $28.57 | Sep 2, 2026 |
| Power Equipment Operators- Underground Sewer & Water Cranes: Cranes: 20 tons through 44 tons with attachments | $91.46 | $62.89 | $28.57 | Sep 2, 2026 |
| Power Equipment Operators- Underground Sewer & Water Cranes: Cranes: 200 tons- 299 tons, or 250' of boom including jib with attachments | $94.16 | $65.59 | $28.57 | Sep 2, 2026 |
| Power Equipment Operators- Underground Sewer & Water Cranes: Cranes: 300 tons and over or 300' of boom including jib with attachments | $95.09 | $66.52 | $28.57 | Sep 2, 2026 |
| Power Equipment Operators- Underground Sewer & Water Cranes: Cranes: 45 tons through 99 tons, under 150' of boom(including jib with attachments) | $92.28 | $63.71 | $28.57 | Sep 2, 2026 |
| Power Equipment Operators- Underground Sewer & Water Cranes: Cranes: Friction cranes through 199 tons | $94.16 | $65.59 | $28.57 | Sep 2, 2026 |
| Power Equipment Operators- Underground Sewer & Water Cranes: Cranes: through 19 tons with attachments, a-frame over 10 tons | $90.76 | $62.19 | $28.57 | Sep 2, 2026 |
| Crusher | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Deck Engineer/Deck Winches (power) | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Power Equipment Operators- Underground Sewer & Water Cranes: Derricks, On Building Work | $92.28 | $63.71 | $28.57 | Sep 2, 2026 |
| Dozers D-9 & Under | $92.29 | $62.16 | $30.13 | Sep 2, 2026 |
| Drill Oilers: Auger Type, Truck Or Crane Mount | $92.29 | $62.16 | $30.13 | Sep 2, 2026 |
| Drilling Machine | $94.79 | $64.60 | $30.19 | Sep 2, 2026 |
| Elevator and man-lift: permanent and shaft type | $88.21 | $58.18 | $30.03 | Sep 2, 2026 |
| Finishing Machine, Bidwell And Gamaco & Similar Equipment | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Forklift: 3000 lbs and over with attachments | $92.29 | $62.16 | $30.13 | Sep 2, 2026 |
| Forklifts: under 3000 lbs. with attachments | $88.21 | $58.18 | $30.03 | Sep 2, 2026 |
| Grade Engineer: Using Blue Prints, Cut Sheets, Etc | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Gradechecker/Stakeman | $88.21 | $58.18 | $30.03 | Sep 2, 2026 |
| Guardrail Punch | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Hard Tail End Dump Articulating Off- Road Equipment 45 Yards. & Over | $93.85 | $63.68 | $30.17 | Sep 2, 2026 |
| Hard Tail End Dump Articulating Off-road Equipment Under 45 Yards | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Horizontal/Directional Drill Locator | $92.29 | $62.16 | $30.13 | Sep 2, 2026 |
| Horizontal/Directional Drill Operator | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Power Equipment Operators- Underground Sewer & Water Cranes: Hydralifts/boom trucks: 10 tons and under | $86.78 | $58.21 | $28.57 | Sep 2, 2026 |
| Power Equipment Operators- Underground Sewer & Water Cranes: Hydralifts/boom trucks: over 10 tons | $90.76 | $62.19 | $28.57 | Sep 2, 2026 |
| Leverman | $95.76 | $65.55 | $30.21 | Sep 2, 2026 |
| Loader, Overhead, 6 Yards. But Not Including 8 Yards | $93.85 | $63.68 | $30.17 | Sep 2, 2026 |
| Loader: Overhead 8 yards and over | $94.79 | $64.60 | $30.19 | Sep 2, 2026 |
| Loaders, Overhead Under 6 Yards | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Loaders, Plant Feed | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Loaders: Elevating Type Belt | $92.29 | $62.16 | $30.13 | Sep 2, 2026 |
| Locomotives, All | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Material Transfer Device | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Mechanics: All (Leadmen - $0.50 per hour over mechanic) | $94.79 | $64.60 | $30.19 | Sep 2, 2026 |
| Motor Patrol Graders | $93.85 | $63.68 | $30.17 | Sep 2, 2026 |
| Mucking Machine, Mole, Tunnel Drill, Boring, Road Header And/or Shield | $93.85 | $63.68 | $30.17 | Sep 2, 2026 |
| Oil Distributors, Blower Distribution & Mulch Seeding Operator | $88.21 | $58.18 | $30.03 | Sep 2, 2026 |
| Outside Hoists (Elevators and Manlifts), Air Tuggers, Strato | $92.29 | $62.16 | $30.13 | Sep 2, 2026 |
| Power Equipment Operators- Underground Sewer & Water Cranes: Overhead, bridge type Crane: 20 tons through 44 tons | $91.46 | $62.89 | $28.57 | Sep 2, 2026 |
| Power Equipment Operators- Underground Sewer & Water Cranes: Overhead, bridge type: 100 tons and over | $93.21 | $64.64 | $28.57 | Sep 2, 2026 |
| Power Equipment Operators- Underground Sewer & Water Cranes: Overhead, bridge type: 45 tons through 99 tons | $92.28 | $63.71 | $28.57 | Sep 2, 2026 |
| Pavement Breaker | $88.21 | $58.18 | $30.03 | Sep 2, 2026 |
| Pile Driver (other Than Crane Mount) | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Plant Oiler - Asphalt, Crusher | $92.29 | $62.16 | $30.13 | Sep 2, 2026 |
| Posthole Digger, Mechanical | $88.21 | $58.18 | $30.03 | Sep 2, 2026 |
| Power Plant | $88.21 | $58.18 | $30.03 | Sep 2, 2026 |
| Pumps - Water | $88.21 | $58.18 | $30.03 | Sep 2, 2026 |
| Quad 9, Hd 41, D10 And Over | $93.85 | $63.68 | $30.17 | Sep 2, 2026 |
| Power Equipment Operators- Underground Sewer & Water Cranes: Quick tower: no cab, under 100 feet in height base to boom | $90.76 | $62.19 | $28.57 | Sep 2, 2026 |
| Remote Control Operator On Rubber Tired Earth Moving Equipment | $93.85 | $63.68 | $30.17 | Sep 2, 2026 |
| Power Equipment Operators- Underground Sewer & Water Cranes: Rigger and Bellman | $86.78 | $58.21 | $28.57 | Sep 2, 2026 |
| Power Equipment Operators- Underground Sewer & Water Cranes: Rigger/Signal Person, Bellman(Certified) | $90.76 | $62.19 | $28.57 | Sep 2, 2026 |
| Rollagon | $93.85 | $63.68 | $30.17 | Sep 2, 2026 |
| Roller, Other Than Plant Mix | $88.21 | $58.18 | $30.03 | Sep 2, 2026 |
| Roller, Plant Mix Or Multi-lift Materials | $92.29 | $62.16 | $30.13 | Sep 2, 2026 |
| Roto-mill, Roto-grinder | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Saws - Concrete | $92.29 | $62.16 | $30.13 | Sep 2, 2026 |
| Scraper, Self Propelled Under 45 Yards | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Scrapers - Concrete & Carry All | $92.29 | $62.16 | $30.13 | Sep 2, 2026 |
| Scrapers, Self-propelled: 45 Yards And Over | $93.85 | $63.68 | $30.17 | Sep 2, 2026 |
| Service Engineers: Equipment | $92.29 | $62.16 | $30.13 | Sep 2, 2026 |
| Shotcrete/Gunite Equipment | $88.21 | $58.18 | $30.03 | Sep 2, 2026 |
| Shovel, Excavator, Backhoe, Tractors Under 15 Metric Tons | $92.29 | $62.16 | $30.13 | Sep 2, 2026 |
| Shovel, Excavator, Backhoe: Over 30 Metric Tons To 50 Metric Tons | $93.85 | $63.68 | $30.17 | Sep 2, 2026 |
| Shovel, Excavator, Backhoes, Tractors: 15 To 30 Metric Tons | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Shovel, Excavator, Backhoes: Over 50 Metric Tons To 90 Metric Tons | $94.79 | $64.60 | $30.19 | Sep 2, 2026 |
| Shovel, Excavator, Backhoes: Over 90 Metric Tons | $95.76 | $65.55 | $30.21 | Sep 2, 2026 |
| Slipform Pavers | $93.85 | $63.68 | $30.17 | Sep 2, 2026 |
| Spreader, Topsider & Screedman | $93.85 | $63.68 | $30.17 | Sep 2, 2026 |
| Subgrader Trimmer | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Tower Bucket Elevators | $92.29 | $62.16 | $30.13 | Sep 2, 2026 |
| Power Equipment Operators- Underground Sewer & Water Cranes: Tower Crane: over 175' through 250' in height, base to boom | $94.16 | $65.59 | $28.57 | Sep 2, 2026 |
| Power Equipment Operators- Underground Sewer & Water Cranes: Tower crane: up to 175' in height base to boom | $93.21 | $64.64 | $28.57 | Sep 2, 2026 |
| Power Equipment Operators- Underground Sewer & Water Cranes: Tower Cranes: over 250' in height from base to boom | $95.09 | $66.52 | $28.57 | Sep 2, 2026 |
| Transporters, All Track Or Truck Type | $93.85 | $63.68 | $30.17 | Sep 2, 2026 |
| Trenching Machines | $92.29 | $62.16 | $30.13 | Sep 2, 2026 |
| Power Equipment Operators- Underground Sewer & Water Cranes: Truck Crane Oiler/Driver: 100 tons and over | $91.46 | $62.89 | $28.57 | Sep 2, 2026 |
| Power Equipment Operators- Underground Sewer & Water Cranes: Truck crane oiler/driver: under 100 tons | $90.76 | $62.19 | $28.57 | Sep 2, 2026 |
| Truck Mount Portable Conveyor | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Vac Truck (Vactor Guzzler, Hydro Excavator) | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
| Welder | $93.85 | $63.68 | $30.17 | Sep 2, 2026 |
| Wheel Tractors, Farmall Type | $88.21 | $58.18 | $30.03 | Sep 2, 2026 |
| Yo Yo Pay Dozer | $93.00 | $62.85 | $30.15 | Sep 2, 2026 |
How Yakima County compares
The main operating engineer rate in every county that has one, and how the pay splits here and in the nearest counties. All bars use the same scale.
Every county in Washington
Wage and fringe benefits, nearby
- Yakima Countybase $62.85$93.00
- Klickitat Countybase $55.60$73.15
- Kittitas Countybase $62.85$93.00
- Benton Countybase $42.59$68.01
Operating Engineer rates in nearby counties
Current L&I rates. You pay the rate for the county where the work is done. The statute defines “locality” as “the largest city in the county wherein the physical work is being performed”, and L&I publishes rates county by county (RCW 39.12.010).
L&I's operating engineer rates for Yakima County are the same as in 8 other counties: Chelan, Clallam, Douglas, Grays Harbor, Jefferson, Kittitas, Mason, Okanogan.
| County | Classification | Total | Base | vs Yakima County |
|---|---|---|---|---|
| Pierce County | Shovel, Excavator, Backhoes, Tractors: 15 To 30 Metric Tons | $93.71 | $63.55 | +$0.71 |
| Yakima County | Shovel, Excavator, Backhoes, Tractors: 15 To 30 Metric Tons | $93.00 | $62.85 | |
| Kittitas County | Shovel, Excavator, Backhoes, Tractors: 15 To 30 Metric Tons | $93.00 | $62.85 | same |
| Lewis County | Shovel, Excavator, Backhoes, Tractors: 15 To 30 Metric Tons | $92.69 | $62.56 | −$0.31 |
| Klickitat County | Excavator Operator, Over 20,000 Lbs Through 80,000 Lbs(group 4) | $73.15 | $55.60 | −$19.85 |
| Skamania County | Excavator Operator, Over 20,000 Lbs Through 80,000 Lbs(group 4) | $73.15 | $55.60 | −$19.85 |
| Benton County | Shovel, excavator, backhoe, tractor: 15 to 30 metric tons | $68.01 | $42.59 | −$24.99 |
Washington operating engineer prevailing wage by county, with a map
Notes on this rate
L&I's notes, in L&I's words. Some add premiums for hazardous work, special shifts or certifications.
- 8X Workers on hazmat projects receive additional hourly premiums as follows - Class A Suit: $2.00, Class B Suit: $1.50, Class C Suit: $1.00, and Class D Suit: $0.50. Special Shift Premium: Basic hourly rate plus $2.00 per hour. When due to conditions beyond the control of the Employer or when an owner (not acting as the contractor), a government agency or the contract specifications requires that work can only be performed outside the normal 5 am to 6pm shift, then the special shift premium will be applied to the basic hourly rate. When an employee works on a special shift, they shall be paid a special shift premium for each hour worked unless they are in OT or Double-time status. (For example, the special shift premium does not waive the overtime requirements for work performed on Saturday or Sunday.)
More from L&I on this rate
- Scope of work, WAC 296-127-01354: which tasks this trade covers. L&I says the right classification “depends upon determinations published by L&I” (L&I).
- L&I's prevailing wage lookup, for any county, trade and bid date
- Apprentices: registered apprentices are paid L&I's apprentice rate for the trade. Anyone without a registered agreement counts as a journey-level worker (RCW 39.12.021).
Are you being paid this rate?
Add your wage to what your employer pays into health, pension and other plans for you, and compare it with $93.00. Each contractor files an L&I-approved Statement of Intent to Pay Prevailing Wages before it's paid, and an Affidavit of Wages Paid when the job is accepted (RCW 39.12.040). On contracts over $10,000 the approved intent and L&I's contact details are posted on the job site (RCW 39.12.020).
Source
Washington State Department of Labor & Industries, prevailing wage lookup, Yakima County, Power Equipment Operators (POWE), L&I wage record 149726, published August 3, 2026, effective September 2, 2026: secure.lni.wa.gov/wagelookup/
Each figure comes from L&I's lookup and is checked against L&I's CSV export and a second, separate query. How we check · Download Yakima County as CSV · Report an error